Article 4 Power to construct new railways
(1)
The undertaker may construct and maintain the new railways.
(2)
Subject to article 6 (power to deviate), the new railways may only be constructed within the lines or situations shown on the deposited plans and in accordance with the levels shown on the deposited sections.