# The South Hook Combined Heat and Power Plant Order 2014, Article 15: Certification of plans etc

Extent: E+W+S

(1) The undertaker must, as soon as practicable after the making of this Order, submit to the Secretary of State dated and referenced copies of—
(a) the works plans (part A and part B);
(b) the section drawing plan;
(c) the proposed site layout plan;
(d) the draft landscaping plan;
(e) any other plans or documents referred to in this Order, including—
(i) the Feasibility Study;
(ii) the environmental statement;
(iii) the design principles statement;
(iv) the draft CCP;
(v) the transport assessment;
for certification that they are true copies of the documents referred to in this Order.
(2) A plan or document so certified shall be admissible in any proceedings as evidence of the contents of the document of which it is a copy.
(3) The undertaker shall submit to the relevant planning authorities copies of any plans or documents certified by the Secretary of State under paragraph (1).

---
Source: https://www.legislation.gov.uk/uksi/2014/2846/article/15 (the official version)
Page: https://openlegislation.uk/south-hook-combined-heat-and-power-plant-order-2014/article-15
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.