# The South Hook Combined Heat and Power Plant Order 2014, Note: Explanatory note

Extent: E+W+S

(This note is not part of the Order)
This Order grants development consent for and authorises South Hook CHP Limited to construct, operate and maintain a combined heat and power plant located near Herbrandston in Pembrokeshire. The Order also requires South Hook CHP Limited to set aside a designated carbon capture readiness site. The Order imposes requirements in connection with the development for which it grants development consent.
A copy of the plans and other documents referred to in this Order and certified in accordance with article 15 (certification of plans, etc) of this Order may be inspected free of charge during working hours at the offices of Pembrokeshire Coast National Park Authority, Llanion Park, Pembroke Dock, Pembrokeshire, SA72 6DY and Pembrokeshire County Council, County Hall, Haverfordwest, Pembrokeshire, SA61 1TP.

---
Source: https://www.legislation.gov.uk/uksi/2014/2846/note (the official version)
Page: https://openlegislation.uk/south-hook-combined-heat-and-power-plant-order-2014/note
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.