# The South Humber Bank Energy Centre Order 2021, Schedule 1: AUTHORISED DEVELOPMENT

Extent: E+W+S

In the Borough of North East Lincolnshire a nationally significant infrastructure project as defined in sections 14(1)(a) (nationally significant infrastructure projects: general) and 15 (generating stations) of the 2008 Act and associated development within the meaning of section 115(2) (development for which development consent may be granted), comprising—
Work No. 1— an electricity generating station located on land at the South Humber Bank Power Station Site, South Marsh Road, near Stallingborough, Lincolnshire, fuelled by refuse derived fuels, with a capacity to process up to 753,500 tonnes of refuse derived fuel per annum, with a gross generation capacity of up to 95 megawatts at ISO conditions comprising the following works—
(a)fuel reception and storage facilities, consisting of vehicle ramps, a tipping hall, shredder, fuel storage bunker and cranes;
(b)a combustion system housed within a boiler hall, consisting of two combustion lines and associated boilers;
(c)a steam turbine and generator housed within a turbine hall with a cooling system comprising fin fan coolers;
(d)a bottom ash handling system, including ash storage;
(e)a flue gas treatment system, including residue and reagent silos;
(f)a silo or tank for the storage of ammonia or urea based reagents;
(g)an air-cooled condenser;
(h)a compressed air system;
(i)a process effluent storage tank;
(j)a demineralised water treatment plant and demineralised water storage tanks; and
(k)indoor storage tanks for boiler water treatment chemicals.
Work No. 1A— two emissions stacks and associated emissions monitoring systems.
Work No. 1B— administration block, including control room, workshops, stores and welfare facilities.
In connection with and in addition to Work No.s 1, 1A and 1B—
(a)an electrical switchyard, including generator transformers;
(b)auxiliary diesel generators and diesel storage tanks;
(c)pipe racks, pipe runs and cabling;
(d)fire water pump house and fire water tank;
(e)internal vehicle access roads, crossings and pedestrian and cycle facilities and routes;
(f)security gatehouse, barriers and enclosures;
(g)weighbridges;
(h)car parking;
(i)heavy goods vehicle holding area and driver welfare facilities;
(j)a surface water drainage system, including oil-water separators and attenuation pond; and
(k)connections between parts of Work No. 1 and each connection comprised in Work No. 2.
Work No. 2 comprising associated development—
(a)an underground or overground electrical connection from Work No. 1;
(b)an underground gas supply pipeline to Work No. 1;
(c)towns water connection;
(d)telecommunications connections;
(e)steam connection; and
(f)other utility connections.
Work No. 3— associated development being landscaping and biodiversity works, comprising soft landscaping including planting and biodiversity mitigation and enhancement measures.
Work No. 4— associated development comprising a new site access on to South Marsh Road and works to an existing access on to South Marsh Road.
Work No. 5— associated development comprising temporary construction and laydown areas comprising hard standing; laydown and open storage areas, including materials and plant storage; contractor compounds and construction staff office and welfare facilities; generators; concrete batching facilities; vehicle and cycle parking facilities; pedestrian and cycle routes and facilities; security fencing and gates; external lighting; roadways and haul routes; wheel wash facilities and signage.
In connection with and in addition to Work No.s 1, 1A, 1B, 2, 3, 4 and 5, further associated development including—
(a)external lighting, including lighting columns;
(b)security fencing, gates, boundary treatment and other means of enclosure;
(c)closed circuit television cameras and columns and other security measures;
(d)surface and foul water drainage systems, oil-water separators, including channelling, culverting, crossings and works to existing drainage ditches and systems;
(e)electric, gas, water, telecommunication and other infrastructure connections and works, and works to alter such services and utilities connections;
(f)hard and soft landscaping;
(g)biodiversity mitigation and enhancement measures;
(h)site establishment and preparation works, including site clearance (including vegetation removal); earthworks (including soil stripping and storage and site levelling) and excavations; temporary fencing; the creation of temporary construction access points; and the temporary alteration of the position of services and utilities apparatus and connections;
(i)temporary construction laydown areas and contractor facilities, including materials and plant storage and laydown areas; generators; concrete batching facilities; vehicle and cycle parking facilities; pedestrian and cycle routes and facilities; offices and staff welfare facilities; security fencing and gates; external lighting; roadways and haul routes; wheel wash facilities; and signage; and
(j)vehicle access roads, crossings, parking, and pedestrian and cycle facilities and routes,
and, to the extent that it does not form part of such works, further associated development comprising such other works (i) as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised development and (ii) which fall within the scope of the works assessed in the environmental statement.

---
Source: https://www.legislation.gov.uk/uksi/2021/1259/schedule/1 (the official version)
Page: https://openlegislation.uk/south-humber-bank-energy-centre-order-2021/schedule-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.