  "heading": "DEEMED APPROVAL OF MATTERS REFERRED TO IN REQUIREMENTS",
  "text": "SHBEC planning permission condition number and topic\nRequirement number and topic\n4. Details of final positioning of buildings, elevations and floor levels\n5. Detailed design (position and scale)\n5. Details of all external materials\n6. Detailed design (appearance)\n6. Existing tree planting to be retained\n7. Retained trees\n7. So far as relating to details and position of boundary treatments, circulation areas and other hard landscaping\n8. Means of enclosure and hard landscaping\n7. So far as relating to details of permanent lighting\n9. Lighting scheme\n7. So far as relating to a scheme for soft landscaping and planting\n10. Soft landscaping\n8. So far as relating to biodiversity protection\n11. Biodiversity protection\n9. So far as relating to surface water drainage\n13. Surface water drainage\n9. So far as relating to foul water drainage\n14. Foul water drainage\n10. So far as relating to construction traffic management and travel planning\n16. Construction traffic management and travel planning\n11. Details of type of piling to be used\n17. Piling\n12. Steps where unexpected contamination is found after development has commenced\n18. Temporary halting of development on finding unexpected contamination\n13. Scheme for investigation of contamination and report on findings of the investigation\n19. Investigation and remediation of contamination\n14. Remediation scheme under condition 13 to be carried out\n20. Implementation of remediation scheme\n15. Previously unidentified contamination\n21. Procedure in cases of unexpected contamination\n17. Flood warning and evacuation plan\n23. Flood warning and evacuation plan\n18. Delivery and servicing plan\n24. Delivery and servicing plan\n19. Operational travel plan\n25. Operational travel plan\n20. Details and implementation of visibility splays at site entrance\n26. Visibility splays\n21. So far as relating to plans for layout and construction of new entrance and highway drainage\n27. New highway access\n21. So far as relating to plans for parking\n28. Parking\n22. Road condition survey of South Marsh Road and subsequent report on traffic survey results\n29. Road condition survey\n23. Information to be provided to local planning authority to notify UK DVOF & Powerlines at the Defence Geographic Centre\n30. Air safety\n24. Use only of refuse derived fuels\n31. Fuel type\n25. No fuel to be stored outside of main building\n32. Fuel storage\n26. Decommissioning plan\n33. Decommissioning",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 3 in force at 2.12.2021, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2021/1259/schedule/3",
    "retrieved_at": "2026-10-28T22:07:14.978746+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}