# The South Humber Bank Energy Centre Order 2021, Schedule 3: DEEMED APPROVAL OF MATTERS REFERRED TO IN REQUIREMENTS

Extent: E+W+S

SHBEC planning permission condition number and topic
Requirement number and topic
4. Details of final positioning of buildings, elevations and floor levels
5. Detailed design (position and scale)
5. Details of all external materials
6. Detailed design (appearance)
6. Existing tree planting to be retained
7. Retained trees
7. So far as relating to details and position of boundary treatments, circulation areas and other hard landscaping
8. Means of enclosure and hard landscaping
7. So far as relating to details of permanent lighting
9. Lighting scheme
7. So far as relating to a scheme for soft landscaping and planting
10. Soft landscaping
8. So far as relating to biodiversity protection
11. Biodiversity protection
9. So far as relating to surface water drainage
13. Surface water drainage
9. So far as relating to foul water drainage
14. Foul water drainage
10. So far as relating to construction traffic management and travel planning
16. Construction traffic management and travel planning
11. Details of type of piling to be used
17. Piling
12. Steps where unexpected contamination is found after development has commenced
18. Temporary halting of development on finding unexpected contamination
13. Scheme for investigation of contamination and report on findings of the investigation
19. Investigation and remediation of contamination
14. Remediation scheme under condition 13 to be carried out
20. Implementation of remediation scheme
15. Previously unidentified contamination
21. Procedure in cases of unexpected contamination
17. Flood warning and evacuation plan
23. Flood warning and evacuation plan
18. Delivery and servicing plan
24. Delivery and servicing plan
19. Operational travel plan
25. Operational travel plan
20. Details and implementation of visibility splays at site entrance
26. Visibility splays
21. So far as relating to plans for layout and construction of new entrance and highway drainage
27. New highway access
21. So far as relating to plans for parking
28. Parking
22. Road condition survey of South Marsh Road and subsequent report on traffic survey results
29. Road condition survey
23. Information to be provided to local planning authority to notify UK DVOF & Powerlines at the Defence Geographic Centre
30. Air safety
24. Use only of refuse derived fuels
31. Fuel type
25. No fuel to be stored outside of main building
32. Fuel storage
26. Decommissioning plan
33. Decommissioning

---
Source: https://www.legislation.gov.uk/uksi/2021/1259/schedule/3 (the official version)
Page: https://openlegislation.uk/south-humber-bank-energy-centre-order-2021/schedule-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.