Schedule 1 AUTHORISED DEVELOPMENT
A nationally significant infrastructure project as defined in sections 14 and 21 of the 2008 Act, and associated development as defined in section 115 of the 2008 Act, comprising:
In the County of Hampshire
Work No.1A — Works to construct a high-pressure aviation fuel pipeline approximately 20 kilometres in length and with a nominal external diameter of 330 millimetres (subject to engineering tolerance), starting at the indicative point shown on Sheet 1 of the Works Plans and ending at the indicative start point of Work No. 1B shown on Sheets 11/12 of the Works Plans and comprising—
construction and installation of the pipeline by trenched and trenchless methods which may include the installation of concrete-lined sleeve tunnels, reception shaft, launch shaft and backfilling of permanent structures; and
installation of pipeline marker posts and cathodic protection test posts along the pipeline route,
as shown on Sheets 1 to 12 (inclusive) of the Works Plans.
Work No.1B — Works to construct a high-pressure aviation fuel pipeline approximately 15 kilometres in length and with a nominal external diameter of 330 millimetres (subject to engineering tolerance), starting at the indicative end point of Work No. 1A shown on Sheets 11/12 of the Works Plans and ending at the indicative start point of Work No. 1C shown on Sheet 20 of the Works Plans and comprising—
construction and installation of the pipeline by trenched and trenchless methods which may include the installation of concrete-lined sleeve tunnels, reception shaft, launch shaft and backfilling of permanent structures; and
installation of pipeline marker posts and cathodic protection test posts along the pipeline route,
as shown on Sheets 11 to 20 (inclusive) of the Works Plans
Work No.1C — Works to construct a high-pressure aviation fuel pipeline approximately 15 kilometres in length and with a nominal external diameter of 330 millimetres (subject to engineering tolerance), starting at the indicative end point of Work No. 1B shown on Sheet 20 of the Works Plans and ending at the indicative start point of Work No. 1D shown on Sheet 28 of the Works Plans and comprising—
construction and installation of the pipeline by trenched and trenchless methods which may include the installation of concrete-lined sleeve tunnels, reception shaft, launch shaft and backfilling of permanent structures; and
installation of pipeline marker posts and cathodic protection test posts along the pipeline route,
as shown on Sheets 20 to 28 (inclusive) of the Works Plans.
Work No. 1D — Works to construct a high-pressure aviation fuel pipeline approximately 9 kilometres in length and with a nominal external diameter of 330 millimetres (subject to engineering tolerance), starting at the indicative end point of Work No. 1C shown on Sheet 28 of the Works Plans and ending at the indicative start point of Work No. 1E shown on Sheet 33 of the Works Plans and comprising—
construction and installation of the pipeline by trenched and trenchless methods which may include the installation of concrete-lined sleeve tunnels, reception shaft, launch shaft and backfilling of permanent structures; and
installation of pipeline marker posts and cathodic protection test posts along the pipeline route,
as shown on Sheets 28 to 33 (inclusive) of the Works Plans.
In the Counties of Hampshire and Surrey
Work No. 1Ei — Works to construct a high-pressure aviation fuel pipeline approximately 6 kilometres in length and with a nominal external diameter of 330 millimetres (subject to engineering tolerance), starting at the indicative end point of Work No. 1D shown on Sheet 33 of the Works Plans and ending at the indicative start point of Work No. 1Eii shown on Sheet 35 of the Works Plans and comprising—
construction and installation of the pipeline by trenched and trenchless methods which may include the installation of concrete-lined sleeve tunnels, reception shaft, launch shaft and backfilling of permanent structures; and
installation of pipeline marker posts and cathodic protection test posts along the pipeline route,
as shown on Sheets 33 to 35 (inclusive) of the Works Plans.
Work No. 1Eii — Works to construct a high-pressure aviation fuel pipeline approximately 0.6 kilometres in length and with a nominal external diameter of 330 millimetres (subject to engineering tolerance), starting at the indicative end point of Work No. 1Ei shown on Sheet 35 of the Works Plans and ending at the indicative start point of Work No. 1Eiii shown on Sheet 35 of the Works Plans and comprising—
construction and installation of the pipeline by trenched and trenchless methods which may include the installation of concrete-lined sleeve tunnels, reception shaft, launch shaft and backfilling of permanent structures; and
installation of pipeline marker posts and cathodic protection test posts along the pipeline route,
as shown on Sheet 35 of the Works Plans.
Work No. 1Eiii — Works to construct a high-pressure aviation fuel pipeline approximately 2.4 kilometres in length and with a nominal external diameter of 330 millimetres (subject to engineering tolerance), starting at the indicative end point of Work No. 1Eii shown on Sheet 35 of the Works Plans and ending at the indicative start point of Work No. 1F shown on Sheet 38 of the Works Plans and comprising—
construction and installation of the pipeline by trenched and trenchless methods which may include the installation of concrete-lined sleeve tunnels, reception shaft, launch shaft and backfilling of permanent structures; and
installation of pipeline marker posts and cathodic protection test posts along the pipeline route,
as shown on Sheets 35 to 38 (inclusive) of the Works Plans.
In the County of Surrey
Work No. 1F — Works to construct a high-pressure aviation fuel pipeline approximately 17 kilometres in length and with a nominal external diameter of 330 millimetres (subject to engineering tolerance), starting at the indicative end point of Work No. 1E shown on Sheet 38 of the Works Plans and ending at the indicative start point of Work No. 1G shown on Sheet 47 of the Works Plans and comprising—
construction and installation of the pipeline by trenched and trenchless methods which may include the installation of concrete-lined sleeve tunnels, reception shaft, launch shaft and backfilling of permanent structures; and
installation of pipeline marker posts and cathodic protection test posts along the pipeline route,
as shown on Sheets 38 to 47 (inclusive) of the Works Plans.
Work No. 1G — Works to construct a high-pressure aviation fuel pipeline approximately 4 kilometres in length and with a nominal external diameter of 330 millimetres (subject to engineering tolerance), starting at the indicative end point of Work No. 1F shown on Sheet 47 of the Works Plans and ending at the indicative start of point of Work No. 1H shown on Sheet 49 of the Works Plans and comprising—
construction and installation of the pipeline by trenched and trenchless methods which may include the installation of concrete-lined sleeve tunnels, reception shaft, launch shaft and backfilling of permanent structures; and
installation of pipeline marker posts and cathodic protection test posts along the pipeline route,
as shown on Sheets 47 to 49 (inclusive) of the Works Plans.
In the County of Surrey and the London Borough of Hounslow
Work No. 1H — Works to construct a high-pressure aviation fuel pipeline approximately 8 kilometres in length and with a nominal external diameter of 330 millimetres (subject to engineering tolerance), starting at the indicative end point of Work No. 1G shown on Sheet 49 of the Works Plans and ending at the indicative point shown on Sheet 53 of the Works Plans and comprising—
construction and installation of the pipeline by trenched and trenchless methods which may include the installation of concrete-lined sleeve tunnels, reception shaft, launch shaft and backfilling of permanent structures; and
installation of pipeline marker posts and cathodic protection test posts along the pipeline route,
as shown on Sheets 49 to 53 (inclusive) of the Works Plans.
In the County of Hampshire
Work No. 2A — Works to construct an above ground valve within Work No. 3A, together with associated works, comprising an area of up to 3 metres by 2 metres, at the indicative point shown on Sheet 2 of the Works Plans, such associated works to include—
fencing;
up to two personnel gates;
below ground pipework;
above ground control boxes and below ground cable ducts; and
any other equipment as may be necessary or expedient in connection with the above.
Work No. 2B — Works to construct a partially buried concrete chamber containing a valve, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheet 4 of the Works Plans, such associated works to include—
fencing;
up to two personnel gates;
below ground pipework;
above ground control boxes and below ground cable ducts; and
any other equipment as may be necessary or expedient in connection with the above,
subject to the chamber, valve and associated works not exceeding approximately 2 metres in height in any case.
Work No. 2C — Works to construct a partially buried concrete chamber containing a valve, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheet 7 of the Works Plans, such associated works to include—
fencing;
up to two personnel gates;
below ground pipework;
above ground control boxes and below ground cable ducts; and
any other equipment as may be necessary or expedient in connection with the above,
subject to the chamber, valve and associated works not exceeding approximately 2 metres in height in any case.
Work No. 2D — Works to construct a partially buried concrete chamber containing a valve, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheet 12 of the Works Plans, such associated works to include—
fencing;
up to two personnel gates;
below ground pipework;
above ground control boxes and below ground cable ducts; and
any other equipment as may be necessary or expedient in connection with the above,
subject to the chamber, valve and associated works not exceeding approximately 2 metres in height in any case.
Work No. 2E — Works to construct a partially buried concrete chamber containing a valve, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheet 16 of the Works Plans, such associated works to include—
fencing;
up to two personnel gates;
below ground pipework;
above ground control boxes and below ground cable ducts; and
any other equipment as may be necessary or expedient in connection with the above,
subject to the chamber, valve and associated works not exceeding approximately 2 metres in height in any case.
Work No. 2F — Works to construct a partially buried pressure transducer, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheet 17 of the Works Plans, such associated works to include—
fencing;
up to two personnel gates;
below ground pipework;
above ground control boxes and below ground cable ducts; and
any other equipment as may be necessary or expedient in connection with the above,
subject to the pressure transducer and associated works not exceeding approximately 2 metres in height in any case.
Work No. 2G — Works to construct a partially buried concrete chamber containing a valve, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheet 20 of the Works Plans, such associated works to include—
fencing;
up to two personnel gates;
below ground pipework;
above ground control boxes and below ground cable ducts; and
any other equipment as may be necessary or expedient in connection with the above,
subject to the chamber, valve and associated works not exceeding approximately 2 metres in height in any case.
Work No. 2H — Works to construct an above ground valve within Work No. 3B, together with associated works, comprising an area of up to 3 metres by 2 metres, at the indicative point shown on Sheet 23 of the Works Plans, such associated works to include—
fencing;
up to two personnel gates;
below ground pipework;
above ground control boxes and below ground cable ducts; and
any other equipment as may be necessary or expedient in connection with the above.
Work No. 2I — Works to construct a partially buried concrete chamber containing a valve, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheets 31 and 102 of the Works Plans, such associated works to include—
fencing;
up to two personnel gates;
below ground pipework;
above ground control boxes and below ground cable ducts; and
any other equipment as may be necessary or expedient in connection with the above,
subject to the chamber, valve and associated works not exceeding approximately 2 metres in height in any case.
Work No. 2J — Works to construct a partially buried concrete chamber containing a valve, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheets 33 and 103 of the Works Plans, such associated works to include—
fencing;
up to two personnel gates;
below ground pipework;
above ground control boxes and below ground cable ducts; and
any other equipment as may be necessary or expedient in connection with the above,
subject to the chamber, valve and associated works not exceeding approximately 2 metres in height in any case.
In the County of Surrey
Work No. 2K — Works to construct a partially buried concrete chamber containing a valve, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheets 36 and 112 of the Works Plans, such associated works to include—
fencing;
up to two personnel gates;
below ground pipework;
above ground control boxes and below ground cable ducts; and
any other equipment as may be necessary or expedient in connection with the above,
subject to the chamber, valve and associated works not exceeding approximately 2 metres in height in any case.
Work No. 2L — Works to construct a partially buried concrete chamber containing a valve, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheet 41 of the Works Plans, such associated works to include—
fencing;
up to two personnel gates;
below ground pipework;
above ground control boxes and below ground cable ducts; and
any other equipment as may be necessary or expedient in connection with the above,
subject to the chamber, valve and associated works not exceeding approximately 2 metres in height in any case.
Work No. 2M — Works to construct a partially buried concrete chamber containing a valve, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheet 43 of the Works Plans, such associated works to include—
fencing;
up to two personnel gates;
below ground pipework;
above ground control boxes and below ground cable ducts; and
any other equipment as may be necessary or expedient in connection with the above,
subject to the chamber, valve and associated works not exceeding approximately 2 metres in height in any case.
Work No. 2N — Works to construct a partially buried concrete chamber containing a valve, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheet 47 of the Works Plans, such associated works to include—
fencing;
two personnel gates;
below ground pipework;
above ground control boxes and below ground cable ducts; and
any other equipment as may be necessary or expedient in connection with the above,
subject to the chamber, valve and associated works not exceeding approximately 2 metres in height in any case.
Work No. 2O — Works to construct a partially buried concrete chamber containing a valve, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheets 51 and 124 of the Works Plans, such associated works to include—
fencing;
up to two personnel gates;
below ground pipework;
above ground control boxes and below ground cable ducts; and
any other equipment as may be necessary or expedient in connection with the above,
subject to the chamber, valve and associated works not exceeding approximately 2 metres in height in any case.
In the County of Hampshire
Work No. 3A — Works to construct an Above Ground Installation at Boorley Green (“the Boorley Green AGI”), being a secure compound with an approximate area of 23 metres by 30 metres and a maximum height of 3 metres, comprising equipment for the reception and launching of pipeline inspection gauges in connection with pipeline inspection, cleansing and monitoring, at the indicative point shown on Sheet 2 of the Works Plans, to include—
fencing (to an approximate height of 3 metres);
a double entrance gate;
up to two personnel gates;
below ground pipework;
above ground pipework, vessels, valves and instrumentation;
above ground control boxes and below ground cable ducts;
an internal access road;
changes to ground levels as may be necessary, including the provision of drainage works and the laying of hard standing; and
permanent widening of an access track off Netherhill Lane, and an extension of the access track to join the Boorley Green AGI.
Work No. 3B — Works to construct pipework, valves, pumps and any associated equipment, at the existing Alton Pumping Station, at the indicative point shown on Sheet 23 of the Works Plans.
In the London Borough of Hounslow
Work No. 3C — Works to construct pipework, valves, vessels and equipment for the reception and launching of pipeline inspection gauges in connection with pipeline inspection, cleansing and monitoring, together with any associated equipment, at the existing West London Terminal Above Ground Installation, at the indicative point shown on Sheets 53 and 123 of the Works Plans.
In the County of Hampshire
Work No. 4A — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 42 metres by 51 metres, at the indicative point shown on Sheet 1 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4B — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 60 metres by 62 metres, at the indicative point shown on Sheet 2 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
a plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4C — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 75 metres by 32 metres, at the indicative point shown on Sheet 2 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4D — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 69 metres by 44 metres, at the indicative point shown on Sheet 4 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4E — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 49 metres by 56 metres, at the indicative point shown on Sheet 4 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4F — Work No. not used.
Work No. 4G — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 50 metres by 48 metres, at the indicative point shown on Sheet 9 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4H — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 42 metres by 53 metres, at the indicative point shown on Sheet 9 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4I — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 43 metres by 52 metres, at the indicative point shown on Sheet 11 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4J — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 53 metres by 43 metres, at the indicative point shown on Sheet 11 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4K — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 53 metres by 42 metres, at the indicative point shown on Sheet 12 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4L — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 50 metres by 40 metres, at the indicative point shown on Sheet 15 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4M — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 32 metres by 42 metres, at the indicative point shown on Sheet 16 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4N — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 37 metres by 56 metres, at the indicative point shown on Sheet 19 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4O — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 66 metres by 52 metres, at the indicative point shown on Sheet 20 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4P — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 40 metres by 53 metres, at the indicative point shown on Sheet 21 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4Q — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 51 metres by 38 metres, at the indicative point shown on Sheet 23 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4R — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 107 metres by 80 metres, at the indicative point shown on Sheet 23 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4S — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 34 metres by 52 metres, at the indicative point shown on Sheet 24 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4T — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 66 metres by 52 metres, at the indicative point shown on Sheet 25 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4U — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 53 metres by 41 metres, at the indicative point shown on Sheet 28 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4V — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 68 metres by 50 metres, at the indicative point shown on Sheet 29 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4W — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 68 metres by 39 metres, at the indicative point shown on Sheet 29 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4X — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 60 metres by 42 metres, at the indicative point shown on Sheet 30 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4Y — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 67 metres by 48 metres, at the indicative point shown on Sheet 30 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4Z — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 42 metres by 59 metres, at the indicative point shown on Sheets 31 and 102 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4AA — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 39 metres by 25 metres, at the indicative point shown on Sheet 32 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4AB — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 52 metres by 24 metres, at the indicative point shown on Sheet 33 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4AC — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 32 metres by 52 metres, at the indicative point shown on Sheet 33 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4AD — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 29 metres by 62 metres, at the indicative point shown on Sheets 34 and 104 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 4AE — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 25 metres by 25 metres, at the indicative point shown on Sheets 34 and 105 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
In the County of Surrey
Work No. 5A — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 43 metres by 43 metres, at the indicative point shown on Sheets 36 and 112 of the Works Plans, and including―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas;
fencing and gating (to an approximate height of 2.4 metres).
Work No. 5B — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 72 metres by 22 metres, at the indicative point shown on Sheets 36 and 112 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 5C — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 55 metres by 40 metres, at the indicative point shown on Sheets 36 and 113 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 5D — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 95 metres by 10 metres, at the indicative point shown on Sheet 38 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 5E — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 64 metres by 45 metres, at the indicative point shown on Sheet 41 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 5F — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 59 metres by 42 metres, at the indicative point shown on Sheet 42 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 5G — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 73 metres by 32 metres, at the indicative point shown on Sheet 43 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management area; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 5H — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 40 metres by 20 metres, at the indicative points shown on Sheet 43 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 5I — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 80 metres by 40 metres, at the indicative points shown on Sheet 44 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 5J — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 75 metres by 42 metres, at the indicative point shown on Sheet 45 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 5K — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 30 metres by 24 metre, at the indicative point shown on Sheet 46 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 5L — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 47 metres by 45 metres, at the indicative point shown on Sheet 47 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 5M — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 51 metres by 31 metres, at the indicative point shown on Sheet 47 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 5N — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 53 metres by 45 metres, at the indicative point shown on Sheet 49 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 5O — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 47 metres by 50 metres, at the indicative point shown on Sheet 50 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 5P — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 48 metres by 50 metres, at the indicative point shown on Sheet 50 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 5Q — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 93 metres by 113 metres, at the indicative point shown on Sheets 52 and 121 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 5R — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 57 metres by 30 metres, at the indicative point shown on Sheets 53 and 123 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 5S — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 47 metres by 35 metres, at the indicative point shown on Sheets 53 and 123 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 5T — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 53 metres by 33 metres, at the indicative point shown on Sheets 53 and 123 of the Works Plans, to include―
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
Work No. 5U — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 149 metres by 19 metres, at the indicative point shown on Sheet 37 of the Works Plans, to include—
office, welfare and security facilities;
a parking area for staff;
power supplies and temporary lighting;
pipe equipment and fittings storage;
plant storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas; and
fencing and gating (to an approximate height of 2.4 metres).
In the County of Hampshire
Work No. 6A — Work No. not used.
Work No. 6B — Works to construct a temporary logistics and construction materials storage hub for use during the construction of the authorised development , comprising an area approximately 200 metres by 100 metres, at the indicative point shown on Sheet 59 of the Works Plans, to include—
office, welfare and security facilities;
lighting situated on lighting columns (at an approximate height of 4 metres);
close circuit television cameras situated on columns (at an approximate maximum height of 4 metres);
security monitoring systems;
a parking area for staff;
power supplies;
pipeline equipment and fittings storage;
construction equipment for trenchless crossings;
plant and material storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas;
installation of drainage, drainage attenuation and land drainage, including outfalls; and
fencing and gating (to an approximate height of 3 metres).
Work No. 6C — Works to construct a temporary logistics and construction materials storage hub for use during the construction of the authorised development, comprising an area approximately 150 metres by 150 metres, at the indicative point shown on Sheet 56 of the Works Plans, to include—
office, welfare and security facilities;
lighting situated on lighting columns (at an approximate maximum height of 4 metres);
close circuit television cameras situated on columns (at an approximate height of 4 metres);
security monitoring systems;
a parking area for staff;
power supplies;
pipeline equipment and fittings storage;
construction equipment for trenchless crossings;
plant and material storage;
a fabrication area;
a plant wheel wash area;
waste processing and management areas;
installation of drainage, drainage attenuation and land drainage, including outfalls; and
fencing and gating (to an approximate height of 3 metres).
In the County of Surrey
Work No. 7A — Work No. not used.
Work No. 7B — Work No. not used.
Work No. 7C — Work No. not used.
In the County of Hampshire
Work No. 8A — Works to construct a temporary construction access to the south of Maddoxford Lane, in the indicative location shown on Sheet 1 of the Works Plans.
Work No. 8B — Works to construct a temporary construction access to the north of Maddoxford Lane, in the indicative location shown on Sheet 1 of the Works Plans.
Work No. 8C — Works to construct a temporary construction access to the west of Netherhill Lane, in the indicative location shown on Sheet 1 of the Works Plans.
Work No. 8D — Works to construct a temporary construction access to the south of Gregory Lane, in the indicative location shown on Sheet 2 of the Works Plans.
Work No. 8E — Works to construct a temporary construction access to the north of Gregory Lane, in the indicative location shown on Sheet 2 of the Works Plans.
Work No. 8F — Works to construct a temporary construction access to the west of Mincingfield Lane, in the indicative location shown on Sheet 3 of the Works Plans.
Work No. 8G — Works to construct a temporary construction access to the east of Mincingfield Lane, in the indicative location shown on Sheet 3 of the Works Plans.
Work No. 8H — Works to construct a temporary construction access to the south of Wintershill, in the indicative location shown on Sheet 4 of the Works Plans.
Work No. 8I — Works to construct a temporary construction access to the north of Wintershill, in the indicative location shown on Sheet 4 of the Works Plans.
Work No. 8J — Works to construct a temporary construction access to the south of the B2177 Winchester Road, in the indicative location shown on Sheet 4 of the Works Plans.
Work No. 8K — Works to construct a temporary construction access to the north of the B2177 Winchester Road, in the indicative location shown on Sheet 4 of the Works Plans.
Work No. 8L — Works to construct a temporary construction access to the south of Bigpath Lane, in the indicative location shown on Sheet 6 of the Works Plans.
Work No. 8M — Works to construct a temporary construction access to the north of Bigpath Lane, in the indicative location shown on Sheet 6 of the Works Plans.
Work No. 8N — Works to construct a temporary construction access to the north of Bigpath Lane and west of Belmore, in the indicative location shown on Sheet 6 of the Works Plans.
Work No. 8O — Works to construct a temporary construction access to the east of Belmore and to the north of Bigpath Lane, in the indicative location shown on Sheet 6 of the Works Plans.
Work No. 8P — Works to construct a temporary construction access to the west of Stake’s Lane, in the indicative location shown on Sheet 6 of the Works Plans.
Work No. 8Q — Works to construct a temporary construction access to the east of Stake’s Lane, in the indicative location shown on Sheet 6 of the Works Plans.
Work No. 8R — Works to construct a temporary construction access to the south of Wheely Down Farm Road, in the indicative location shown on Sheet 9 of the Works Plans.
Work No. 8S — Works to construct a temporary construction access to the north of Wheely Down Farm Road, in the indicative location shown on Sheet 9 of the Works Plans.
Work No. 8T — Works to construct a temporary construction access to the south of Kilmeston Road, in the indicative location shown on Sheet 9 of the Works Plans.
Work No. 8U — Works to construct a temporary construction access to the north of Kilmeston Road, in the indicative location shown on Sheet 9 of the Works Plans.
Work No. 8V — Work No. not used.
Work No. 8W — Work No. not used.
Work No. 8X — Work No. not used.
Work No. 8Y — Works to construct a temporary construction access to the south of the A272, in the indicative location shown on Sheet 11 of the Works Plans.
Work No. 8Z — Works to construct a temporary construction access to the north of the A272/Tithelands Lane, in the indicative location shown on Sheet 12 of the Works Plans.
Work No. 8AA — Works to construct a temporary construction access to the west of Tithelands Lane, in the indicative location shown on Sheet 12 of the Works Plans.
Work No. 8AB — Works to construct a temporary construction access to the east of Tithelands Lane, in the indicative location shown on Sheet 12 of the Works Plans.
Work No. 8AC — Works to construct a temporary construction access to the west of Stapley Lane, in the indicative location shown on Sheet 14 of the Works Plans.
Work No. 8AD — Works to construct a temporary construction access to the east of Stapley Lane, in the indicative location shown on Sheet 14 of the Works Plans.
Work No. 8AE — Works to construct a temporary construction access to the south of Smugglers Lane, in the indicative location shown on Sheet 15 of the Works Plans.
Work No. 8AF — Works to construct a temporary construction access to the north of Smugglers Lane, in the indicative location shown on Sheet 15 of the Works Plans.
Work No. 8AG — Works to construct a temporary construction access to the south of Petersfield Road, in the indicative location shown on Sheet 15 of the Works Plans.
Work No. 8AH — Works to construct a temporary construction access to the north of Petersfield Road, in the indicative location shown on Sheet 15 of the Works Plans.
Work No. 8AI — Works to construct a temporary construction access to the south of Kitwood Lane, in the indicative location shown on Sheet 16 of the Works Plans.
Work No. 8AJ — Works to construct a temporary construction access to the north of Kitwood Lane, in the indicative location shown on Sheet 16 of the Works Plans.
Work No. 8AK — Works to construct a temporary construction access to the south of Hawthorn Road, in the indicative location shown on Sheet 16 of the Works Plans.
Work No. 8AL — Works to construct a temporary construction access to the north of Hawthorn Road, in the indicative location shown on Sheet 16 of the Works Plans.
Work No. 8AM — Works to construct a temporary construction access to the west of Headmore Lane, in the indicative location shown on Sheet 17 of the Works Plans.
Work No. 8AN — Works to construct a temporary construction access to the east of Headmore Lane, in the indicative location shown on Sheet 17 of the Works Plans.
Work No. 8AO — Works to construct a temporary construction access to the south of Brightstone Lane, in the indicative location shown on Sheet 17 of the Works Plans.
Work No. 8AP — Works to construct a temporary construction access to the north of Brightstone Lane, in the indicative location shown on Sheet 17 of the Works Plans.
Work No. 8AQ — Works to construct a temporary construction access to the south of Woodside Lane, in the indicative location shown on Sheet 18 of the Works Plans.
Work No. 8AR — Works to construct a temporary construction access to the north of Woodside Lane, in the indicative location shown on Sheet 18 of the Works Plans.
Work No. 8AS — Works to construct a temporary construction access to the west of the A32, in the indicative location shown on Sheet 19 of the Works Plans.
Work No. 8AT — Works to construct a temporary construction access to the east of the A32, opposite Woodside Lane, in the indicative location shown on Sheet 19 of the Works Plans.
Work No. 8AU — Works to construct a temporary construction access to the south of the B3006 Selbourne Road, in the indicative location shown on Sheet 20 of the Works Plans.
Work No. 8AV — Works to construct a temporary construction access to the north of the B3006 Selbourne Road, in the indicative location shown on Sheet 20 of the Works Plans.
Work No. 8AW — Works to construct a temporary construction access to the south of the B3004 Cakers Lane, in the indicative location shown on Sheet 21 of the Works Plans.
Work No. 8AX — Works to construct a temporary construction access to the north of the B3004 Cakers Lane, in the indicative location shown on Sheet 21 of the Works Plans.
Work No. 8AY — Works to construct a temporary construction access to the south of Binsted Road, in the indicative location shown on Sheet 23 of the Works Plans.
Work No. 8AZ — Works to construct a temporary construction access to the north of Binsted Road, in the indicative location shown on Sheet 23 of the Works Plans.
Work No. 8BA — Works to construct a temporary construction access in proximity to the A31 south bound slip road, in the indicative location shown on Sheet 23 of the Works Plans.
Work No. 8BB — Works to construct a temporary construction access to the west of the unnamed road leading from the A31 to Ryebridge Road, in the indicative location shown on Sheet 24 of the Works Plans.
Work No. 8BC — Works to construct a temporary construction access to the east of the unnamed road leading from the A31 to Ryebridge Road, in the indicative location shown on Sheet 24 of the Works Plans.
Work No. 8BD — Works to construct a temporary construction access to the south of Gid Lane, in the indicative location shown on Sheet 24 of the Works Plans.
Work No. 8BE — Works to construct a temporary construction access to the north of Gid Lane, in the indicative location shown on Sheet 24 of the Works Plans.
Work No. 8BF — Works to construct a temporary construction access to the west of Froyle Road, in the indicative location shown on Sheet 25 of the Works Plans.
Work No. 8BG — Works to construct a temporary construction access to the east of Froyle Road, in the indicative location shown on Sheet 25 of the Works Plans.
Work No. 8BH — Works to construct a temporary construction access to the west of Hole Lane, in the indicative location shown on Sheet 26 of the Works Plans.
Work No. 8BI — Works to construct a temporary construction access to the east of Hole Lane, in the indicative location shown on Sheet 26 of the Works Plans.
Work No. 8BJ — Works to construct a temporary construction access to the south of Dippenhall Road, in the indicative location shown on Sheet 27 of the Works Plans.
Work No. 8BK — Works to construct a temporary construction access to the north of Dippenhall Road, in the indicative location shown on Sheet 27 of the Works Plans.
Work No. 8BL — Works to construct a temporary construction access to the west of Dippenhall Street, in the indicative location shown on Sheet 28 of the Works Plans.
Work No. 8BM — Works to construct a temporary construction access to the east of Dippenhall Street, in the indicative location shown on Sheet 28 of the Works Plans.
Work No. 8BN — Works to construct a temporary construction access to the south of Heath Lane, in the indicative location shown on Sheet 29 of the Works Plans.
Work No. 8BO — Works to construct a temporary construction access to the north of Heath Lane, in the indicative location shown on Sheet 29 of the Works Plans.
Work No. 8BP — Works to construct a temporary construction access to the south of Redlands Lane, in the indicative location shown on Sheet 29 of the Works Plans.
Work No. 8BQ — Works to construct a temporary construction access to the north of Redlands Lane, in the indicative location shown on Sheet 29 of the Works Plans.
Work No. 8BR — Works to construct a temporary construction access to the south of the A287 Ewshot Hill, in the indicative location shown on Sheet 29 of the Works Plans.
Work No. 8BS — Works to construct a temporary construction access to the north of the A287 Ewshot Hill, in the indicative location shown on Sheet 29 of the Works Plans.
Work No. 8BT — Works to construct a temporary construction access to the north of the A287 Ewshot Hill, in the indicative location shown on Sheet 29 of the Works Plans.
Work No. 8BU — Works to construct a temporary construction access to the south of Ewshot Lane, in the indicative location shown on Sheet 30 of the Works Plans.
Work No. 8BV — Works to construct a temporary construction access to the north of Ewshot Lane, in the indicative location shown on Sheet 30 of the Works Plans.
Work No. 8BW — Works to construct a temporary construction access to the west of Naishes Lane, in the indicative location shown on Sheet 30 of the Works Plans.
Work No. 8BX — Works to construct a temporary construction access to the east of Naishes Lane, in the indicative location shown on Sheet 30 of the Works Plans.
Work No. 8BY — Works to construct a temporary construction access to the east of Naishes Lane, south of Jubilee Drive, in the indicative location shown on Sheets 30 and 101 of the Works Plans.
Work No. 8BZ — Works to construct a temporary construction access to the east of Naishes Lane, west of Wakefords Copse, in the indicative location shown on Sheets 30 and 101 of the Works Plans.
Work No. 8CA — Works to construct a temporary construction access to the west of the B3013 Beacon Hill Road, south of Sandy Lane, in the indicative location shown on Sheets 30 and 102 of the Works Plans.
Work No. 8CB — Works to construct a temporary construction access to the east of the B3013 Beacon Hill Road, south of Bourley Road, in the indicative location shown on Sheets 31 and 102 of the Works Plans.
Work No. 8CC — Works to construct a temporary construction access to the south of Bourley Road, in the indicative location shown on Sheets 31 and 102 of the Works Plans.
Work No. 8CD — Works to construct a temporary construction access to the north of Bourley Road, in the indicative location shown on Sheets 31 and 102 of the Works Plans.
Work No. 8CE — Works to construct a temporary construction access to the south of Aldershot Road, in the indicative location shown on Sheet 31 of the Works Plans.
Work No. 8CF — Works to construct a temporary construction access to the north of Aldershot Road, in the indicative location shown on Sheet 31 of the Works Plans.
Work No. 8CG — Works to construct a temporary construction access to the east of Concorde Road, in the indicative location shown on Sheets 33 and 103 of the Works Plans.
Work No. 8CH — Works to construct a temporary construction access to the south of Ively Road, in the indicative location shown on Sheet 33 of the Works Plans.
Work No. 8CI — Works to construct a temporary construction access to the north of Ively Road, in the indicative location shown on Sheet 33 of the Works Plans.
Work No. 8CJ — Works to construct a temporary construction access to the west of the A327 Ively Road, in the indicative location shown on Sheet 33 of the Works Plans.
Work No. 8CK — Works to construct a temporary construction access to the east of the A327 Ively Road, in the indicative location shown on Sheet 33 of the Works Plans.
Work No. 8CL — Works to construct a temporary construction access to the east end of Grasmere Road, in the indicative location shown on Sheets 34 and 104 of the Works Plans.
Work No. 8CM — Works to construct a temporary construction access to the south of the B3014 Cove Road, in the indicative location shown on Sheets 34 and 104 of the Works Plans.
Work No. 8CN — Works to construct a temporary construction access to the west side of Cove Brook and to the south of West Heath Road, in the indicative location shown on Sheets 34 and 104 of the Works Plans.
Work No. 8CO — Works to construct a temporary construction access to the west side of Cove Brook and to the north of West Heath Road, in the indicative location shown on Sheets 34 and 104 of the Works Plans.
Work No. 8CP — Works to construct a temporary construction access to the east end of Cabrol Road, in the indicative location shown on Sheets 34 and 105 of the Works Plans.
Work No. 8CQ — Works to construct a temporary construction access to the east side of the A325 Farnborough Road, in the indicative location shown on Sheets 35 and 106 of the Works Plans.
Work No. 8CR — Works to construct a temporary construction access to the east side of Ship Lane, in the indicative location shown on Sheets 35, 107 and 108 of the Works Plans.
Work No. 8CS — Works to construct a temporary construction access to the east side of Farnborough Street, in the indicative location shown on Sheets 35 and 107 of the Works Plans.
Work No. 8CT — Works to construct a temporary construction access to the east of the A331 Frimley Bypass, in the indicative location shown on Sheets 35 and 108 of the Works Plans.
Work No. 8CU —Work No. not used.
Work No. 8CV — Works to construct a temporary construction access to the west of the A331 and to the north of Chapel Street, in the indicative location shown on Sheets 35 and 107 of the Works Plans.
Work No. 8CW — Work No. not used.
Work No. 8CX — Works to construct a temporary construction access to the east of Northfield Lane, in the indicative location shown on Sheet59 of the Works Plans.
Work No. 8CY — Works to construct a temporary construction access to the east of Bramshot Road, in the indicative location shown on Sheets 32 and 56 of the Works Plans.
Work No. 8CZ — Works to construct a temporary construction access to the west of the A325 Farnborough Road, in the indicative location shown on Sheet 35 of the Works Plans.
In the County of Surrey
Work No. 9A — Works to construct a temporary construction access to the east of the A331 and to the north of The Hatches, in the indicative location shown on Sheets 35 and 110 of the Works Plans.
Work No. 9B — Works to construct a temporary construction access to the west of the B3411 Frimley Green Road and to the south of the SC Johnson Factory, in the indicative location shown on Sheets 36 and 112 of the Works Plans.
Work No. 9C — Works to construct a temporary construction access to the west of the B3411 Frimley Green Road and to the north of the SC Johnson Factory, in the indicative location shown on Sheets 36 and 109 of the Works Plans.
Work No. 9D — Works to construct a temporary construction access to the east of St Catherines Road, in the indicative location shown on Sheets 36 and 113 of the Works Plans.
Work No. 9E — Works to construct a temporary construction access in proximity to Frith Hill Road off the B3015 Deepcut Bridge Road, in the indicative location shown on Sheet 37 of the Works Plans.
Work No. 9F — Work No. not used.
Work No. 9G — Works to construct a temporary construction access to the west of the B3015 Deepcut Bridge Road, to the south of Old Bisley Road, in the indicative location shown on Sheet 38 of the Works Plans.
Work No. 9H — Works to construct a temporary construction access to the east of the B3015 Deepcut Bridge Road, south of Old Bisley Road, in the indicative location shown on Sheet 38 of the Works Plans.
Work No. 9I — Works to construct a temporary construction access to the south of the B311 Red Road, west of Briar Avenue, in the indicative location shown on Sheet 40 of the Works Plans.
Work No. 9J — Works to construct a temporary construction access to the north of the B311 Red Road, west of Lightwater Road, in the indicative location shown on Sheet 40 of the Works Plans.
Work No. 9K — Works to construct a temporary construction access to the west of Guildford Road, south of Blackstroud Lane West, in the indicative location shown on Sheet 41 of the Works Plans.
Work No. 9L — Works to construct a temporary construction access to the east of Guildford Road, south of Blackstroud Lane West, in the indicative location shown on Sheet 41 of the Works Plans.
Work No. 9M — Works to construct a temporary construction access to the south of Blackstroud Lane East, in the indicative location shown on Sheet 41 of the Works Plans.
Work No. 9N — Works to construct a temporary construction access to the north of Blackstroud Lane East, in the indicative location shown on Sheet 41 of the Works Plans.
Work No. 9O — Works to construct a temporary construction access to the west of Halebourne Lane, in the indicative location shown on Sheet 42 of the Works Plans.
Work No. 9P — Works to construct a temporary construction access to the east of Halebourne Lane, in the indicative location shown on Sheet 42 of the Works Plans.
Work No. 9Q — Works to construct a temporary construction access to the south of Windlesham Road, opposite Woodcock Drive, in the indicative location shown on Sheets 42 and 114 of the Works Plans.
Work No. 9R — Works to construct a temporary construction access to the north of Windlesham Road, east of Woodcock Drive, in the indicative location shown on Sheets 42 and 114 of the Works Plans.
Work No. 9S — Works to construct a temporary construction access to the south of Steep Hill, in the indicative location shown on Sheet 43 of the Works Plans.
Work No. 9T — Works to construct a temporary construction access to the north of Steep Hill, in the indicative location shown on Sheet 43 of the Works Plans.
Work No. 9U — Works to construct a temporary construction access to the west of the B383 Windsor Road, south of Staple Hill, in the indicative location shown on Sheet 43 of the Works Plans.
Work No. 9V — Works to construct a temporary construction access to the east of the B383 Windsor Road, south of Staple Hill, in the indicative location shown on Sheet 43 of the Works Plans.
Work No. 9W — Works to construct a temporary construction access to the west of Accommodation Road, in the indicative location shown on Sheet 45 of the Works Plans.
Work No. 9X — Works to construct a temporary construction access to the east of Accommodation Road, in the indicative location shown on Sheet 45 of the Works Plans.
Work No. 9Y — Works to construct a temporary construction access to the south of the B386 Longcross Road, east of Accommodation Road, in the indicative location shown on Sheet 45 of the Works Plans.
Work No. 9Z — Works to construct a temporary construction access to the south of the B386 Longcross Road, west of Lyne Lane, in the indicative location shown on Sheet 46 of the Works Plans.
Work No. 9AA — Works to construct a temporary construction access to the north of the B386 Longcross Road, east of Lyne Lane, in the indicative location shown on Sheets 46 and 115 of the Works Plans.
Work No. 9AB — Works to construct a temporary construction access to the west of Hardwick Lane, in the indicative location shown on Sheet 58 of the Works Plans.
Work No. 9AC — Works to construct a temporary construction access to the west of the A320 Guildford Road, in the indicative location shown on Sheet 47 of the Works Plans.
Work No. 9AD — Works to construct a temporary construction access to the east of the A320 Guildford Road, using the entrance to Salesian School, in the indicative location shown on Sheet 47 of the Works Plans.
Work No. 9AE — Works to construct a temporary construction access in proximity to The Knoll/Hanworth Lane, in the indicative location shown on Sheet 47 of the Works Plans.
Work No. 9AF — Works to construct a temporary construction access in proximity to Green Lane and the Abbey Moor Golf Club, in the indicative location shown on Sheet 47 of the Works Plans.
Work No. 9AG — Works to construct a temporary construction access to the east of the A317 Chertsey Road, in proximity to Chertsey High School, in the indicative location shown on Sheets 48 and 116 of the Works Plans.
Work No. 9AH — Works to construct a temporary construction access to the south of Mead Lane, in the indicative location shown on Sheets 48 and 49 of the Works Plans.
Work No. 9AI — Works to construct a temporary construction access to the west of Old Littleton Lane, in the indicative location shown on Sheets 49 and 117 of the Works Plans.
Work No. 9AJ — Works to construct a temporary construction access to the west of Littleton Lane, using the entrance to the Brett Aggregates Industrial Estate, in the indicative location shown on Sheets 49 and 118 of the Works Plans.
Work No. 9AK — Works to construct a temporary construction access to the south of the B276 Shepperton Road, in the indicative location shown on Sheet 50 of the Works Plans.
Work No. 9AL — Works to construct a temporary construction access to the north of the B276 Shepperton Road, in the indicative location shown on Sheet 50 of the Works Plans.
Work No. 9AM — Works to construct a temporary construction access to the east of the B377 The Broadway, south of the Queen Mary Intake Channel, in the indicative location shown on Sheet 51 of the Works Plans.
Work No. 9AN — Works to construct a temporary construction access to the west of the B377 Ashford Road, at the junction of Kingston Road and Ashford Road, in the indicative location shown on Sheets 51 and 120 of the Works Plans.
Work No. 9AO — Works to construct a temporary construction access to the north of the B377 Ashford Road, east of Kingston Road, in the indicative location shown on Sheets 51 and 120 of the Works Plans.
Work No. 9AP — Works to construct a temporary construction access to the north end of Celia Crescent, in the indicative location shown on Sheets 52 and 120 of the Works Plans.
Work No. 9AQ — Works to construct a temporary construction access to the south of Ferndale Road, in the indicative location shown on Sheets 52 and 120 of the Works Plans.
Work No. 9AR — Works to construct a temporary construction access to the north of Village Way, using the entrance to Clarendon School, in the indicative location shown on Sheets 52 and 122 of the Works Plans.
Work No. 9AS — Works to construct a temporary construction access to the north of the B378 Stanwell Road, using the entrance to St James School, in the indicative location shown on Sheets 52, 121 and 122 of the Works Plans.
Work No. 9AT — Works to construct a temporary construction access to the west of Short Lane, in the indicative location shown on Sheets 53 and 123 of the Works Plans.
Work No. 9AU — Works to construct a temporary construction access to the east of Short Lane, in the indicative location shown on Sheets 53 and 123 of the Works Plans.
Work No. 9AV — Work No. not used.
In the County of Hampshire
Work No. 10A — Works to construct a permanent access to Work No. 2A, together with provision for vehicular parking, off the unnamed road in proximity to Netherhill Lane, in the indicative location shown on Sheet 2 of the Works Plans.
Work No. 10B — Works to construct a permanent access to Work No. 2B, together with provision for vehicular parking, off Cross Lane, in the indicative location shown on Sheet 4 of the Works Plans.
Work No. 10C — Works to construct a permanent access to Work No. 2C, together with provision for vehicular parking, off Lower Preshaw Lane and the private means of access to Betty Mundy’s Cottage, in the indicative location shown on Sheet 7 of the Works Plans.
Work No. 10D — Works to construct a permanent access to Work No. 2D, together with provision for vehicular parking, off Uncle Bill’s Lane, in the indicative location shown on Sheet 12 of the Works Plans.
Work No. 10E — Works to construct a permanent access to Work No. 2E, together with provision for vehicular parking, off Kitwood Lane, in the indicative location shown on Sheet 16 of the Works Plans.
Work No. 10F — Works to construct a permanent access to Work No. 2F, together with provision for vehicular parking, off Headmore Lane, in the indicative location shown on Sheet 17 of the Works Plans.
Work No. 10G — Works to construct a permanent access to Work No. 2G, together with provision for vehicular parking, off the B3006 Selbourne Road, in the indicative location shown on Sheet 20 of the Works Plans.
Work No. 10H — Works to construct a permanent access to Work No. 2H, off the access road to Alton Pumping Station, in the indicative location shown on Sheet 23 of the Works Plans.
Work No. 10I — Works to construct a permanent access to Work No. 2I, off Bourley Road (at Tweseldown Racecourse) in the indicative location shown on Sheets 31 and 102 of the Works Plans.
Work No. 10J — Works to construct a permanent access to Work No. 2J, off Concord Road/Whittle Roundabout, in the indicative location shown on Sheets 33 and 103 of the Works Plans.
In the County of Surrey
Work No. 11A — Works to construct a permanent access to Work No. 2K, together with provision for vehicular parking, along the access road to the SC Johnson Factory, off Frimley Green Road, in the indicative location shown on Sheets 36 and 112 of the Works Plans.
Work No. 11B — Works to construct a permanent access to Work No. 2L, off Guildford Road, in the indicative location shown on Sheet 41 of the Works Plans.
Work No. 11C — Works to construct a permanent access to Work No. 2M, together with provision for vehicular parking, off Steep Hill Lane, in the indicative location shown on Sheet 43 of the Works Plans.
Work No. 11D — Works to construct a permanent access to Work No. 2N, together with provision for vehicular parking, off The Knoll/Hanworth Lane, in the indicative location shown on Sheet 47 of the Works Plans.
Work No. 11E — Works to construct a permanent access to Work No. 2O, together with provision for vehicular parking off the B377 Ashford Road, in the indicative location shown on Sheets 51 and 124 of the Works Plans.
In connection with the construction of any of those works, further development within the Order limits which does not give rise to any materially new or materially different environmental effects to those assessed in the environmental statement consisting of—
site preparation works, site clearance (including fencing, vegetation removal, demolition of existing structures and the creation of alternative footpaths); earthworks (including soil stripping and storage and site levelling) and pre-construction drainage works;
installation of wires, cables, conductors, pipes and ducts;
establishment of winching points and installation of temporary scaffolding;
in relation to Works Nos. 1A to 1H (inclusive), 2A to 2O (inclusive) and 3A to 3C (inclusive), construction works including—
surveying and setting out;
works to enable power supplies and temporary lighting;
establishment of temporary working areas;
installation of demarcation fencing/stockproof fencing/heras fencing or similar;
trenchless works, drive and reception pits, hydraulic rams, rollers and brackets, pipe thrusters and winch;
topsoil and subsoil stripping and storage;
archaeological surveys/investigations and watching brief;
pipeline installation including pipe stringing, pipe bending, end preparation, front end welding, back end welding, fabrication welding, pipeline coating, pipeline trench excavation, dewatering activities, lower and lay, sand padding, backfilling, pipeline tie-ins, re-grading of soil, post construction drainage, cross-ripping and reinstatement of top-soil;
filling, testing and dewatering test sections;
aerial markers, cathodic protection test posts, cathodic protection rectifier cabinets, sacrificial anodes and field boundary markers;
reinstating test locations;
removing demarcation fencing;
reinstating boundary walls, hedges and fencing;
final gauge plate and calliper surveys;
drying and commissioning pipelines; and
demobilisation from site;
the carrying out of works to alter the layout of streets pursuant to article 10 (power to alter layout, etc. of streets) and of works to streets pursuant to article 11 (street works), as well as kerbing and paving, the provision of signals, road markings, traffic management measures and temporary roads;
works required for the strengthening, improvement, maintenance, or reconstruction of any street;
works to place, alter, remove or maintain street furniture;
the construction of ramps, means of access, non-motorised links, footpaths, footways, bridleways, cycle tracks and crossing facilities;
the construction of embankments, abutments, shafts, foundations, retaining walls, drainage, outfalls, ditches, pollution control devices, highway lighting, fencing and culverts;
works to place, alter, divert, relocate, remove or maintain the position of apparatus, services, plant and other equipment in a street, or in other land, including mains, sewers, drains, pipes, lights and cables;
works to alter the course of, or otherwise interfere with a watercourse, drainage works, attenuation ponds and temporary culverts;
works to rebuild recreational playground facilities, garden sheds, fences and other buildings and structures;
landscaping, noise barriers, works associated with the provision of ecological mitigation and other works to mitigate any adverse effects of the construction, maintenance or operation of the authorised development;
works for the benefit or protection of land, structures, apparatus or equipment affected by the authorised development;
the felling, planting and maintenance of trees and hedgerows;
establishment of site construction compounds, storage areas, temporary vehicle parking, construction fencing, perimeter enclosure, security fencing, construction related buildings, welfare facilities, construction lighting, haulage roads and other machinery, apparatus, works and conveniences; and
such other works, including scaffolding, working sites storage areas, works of demolition or works of whatever nature, as may be necessary or expedient for the purposes of, or for purposes associated with or ancillary to, the construction, operation or maintenance of the authorised development.