# The Special Road Schemes and Highways Orders (Procedure) Regulations 1993, Regulation 4: Centre lines


(1) The centre line of–
(a) a special road authorised by a scheme under section 16, or
(b) a proposed highway directed by an order under section 10 to become a trunk road,
shall be indicated by a black band not more than 1.5 millimetres wide on a plan on a scale of not less than 1/10,000 showing up-to-date details of the area within 67 metres each side of the centre line.
(2) The centre line of a new highway to be constructed in pursuance of an order under section 14 or 18 shall be indicated on a plan on a scale of not less than 1/2500.

---
Source: https://www.legislation.gov.uk/uksi/1993/169/regulation/4 (the official version)
Page: https://openlegislation.uk/special-road-schemes-and-highways-orders-procedure-regulations-1993/regulation-4
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

