# The Specified Risk Material Regulations 1997, Paragraph 5


The equipment used to render specified risk material shall include—
(a) measuring equipment to check temperature and, if necessary, pressure at critical points;
(b) recording devices to record continuously the results of measurements; and
(c) an adequate safety system to prevent insufficient heating.

---
Source: https://www.legislation.gov.uk/uksi/1997/2965/schedule/1/paragraph/5 (the official version)
Page: https://openlegislation.uk/specified-risk-material-regulations-1997/schedule-1/paragraph-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

