  "heading": "DOCUMENTS TO BE CERTIFIED",
  "text": "(1) Document name\n(2) Document reference\n(3) Version\n(4) Date\nSite location plan\n1.1\n2\nNovember 2025\nLand plans\n2.1\n4\nJanuary 2026\nWorks plans\n2.2\n3\nDecember 2025\nAccess and public rights of way plan\n2.3\n2\nJuly 2025\nBook of reference\n4.3\n3\nApril 2026\nEnvironmental Statement: Non Technical Summary\n6.1\n2\nMarch 2026\nEnvironmental Statement: Chapter 0 Contents\n6.2.0\n1\nApril 2025\nEnvironmental Statement: Chapter 1 Introduction\n6.2.1\n1\nApril 2025\nEnvironmental Statement: Chapter 2 EIA Methodology & Public Consultation\n6.2.2\n1\nApril 2025\nEnvironmental Statement: Chapter 3 Site Description, Site Selection and Iterative Design Process\n6.2.3\n1\nApril 2025\nEnvironmental Statement: Chapter 4 Proposed Development\n6.2.4\n1\nApril 2025\nEnvironmental Statement: Chapter 5 Planning Policy\n6.2.5\n1\nApril 2025\nEnvironmental Statement: Chapter 6 Landscape and Visual Impact and Residential Amenity\n6.2.6\n1\nApril 2025\nEnvironmental Statement: Chapter 7 Ecology and Biodiversity\n6.2.7\n3\nApril 2026\nEnvironmental Statement: Chapter 8 Hydrology, Hydrogeology, Flood Risk and Drainage\n6.2.8\n2\nJanuary 2026\nEnvironmental Statement: Chapter 9 Cultural Heritage\n6.2.9\n1\nApril 2025\nEnvironmental Statement: Chapter 10 Socio Economics\n6.2.10\n1\nApril 2025\nEnvironmental Statement: Chapter 11 Noise and Vibration\n6.2.11\n1\nApril 2025\nEnvironmental Statement: Chapter 12 Climate Change\n6.2.12\n1\nApril 2025\nEnvironmental Statement: Chapter 13 Transport and Access\n6.2.13\n1\nApril 2025\nEnvironmental Statement: Chapter 14 Air Quality\n6.2.14\n2\nJanuary 2026\nEnvironmental Statement: Chapter 16 Land Use and Agriculture\n6.2.15\n2\nMarch 2026\nEnvironmental Statement: Chapter 16 Glint and Glare\n6.2.16\n1\nApril 2025\nEnvironmental Statement: Chapter 17 Miscellaneous Issues\n6.2.17\n1\nApril 2025\nEnvironmental Statement: Chapter 18 Summary\n6.2.18\n2\nMarch 2026\nEnvironmental Statement: Chapter 19 Glossary\n6.2.19\n1\nApril 2025\nEnvironmental Statement: Appendix 1.1 Steeple Project Environment Impact Assessment Scoping Report\n6.3.1, Appendix 1.1\n1\nApril 2025\nEnvironmental Statement: Appendix 1.2 EIA Scoping Opinion\n6.3.1, Appendix 1.2\n1\nApril 2025\nEnvironmental Statement: Appendix 1.3 Environment Agency EIA Scoping Response\n6.3.1, Appendix 1.3\n1\nApril 2025\nEnvironmental Statement: Appendix 1.4 EIA Statement of Competence\n6.3.1, Appendix 1.4\n1\nApril 2025\nEnvironmental Statement: Appendix 2.1 Schedule 4 Requirements of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 as amended\n6.3.2 Appendix 2.1\n1\nApril 2025\nEnvironmental Statement: ES Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report\n6.3.2 Appendix 2.2\n2\nDecember 2025\nEnvironmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 1\n6.3.2, Appendix 2.2 Part 1\n2\nDecember 2025\nEnvironmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 2\n6.3.2, Appendix 2.2 Part 2\n2\nDecember 2025\nEnvironmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 3\n6.3.2, Appendix 2.2 Part 3\n2\nDecember 2025\nEnvironmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 4\n6.3.2, Appendix 2.2 Part 4\n2\nJanuary 2026\nEnvironmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 5\n6.3.2, Appendix 2.2 Part 5\n2\nJanuary 2026\nEnvironmental Statement: Appendix 2.3 Cumulative Sites Long List and Short List\n6.3.2, Appendix 2.3\n1\nApril 2025\nEnvironmental Statement: Appendix 4.1 Outline construction environmental management plan\n6.3.4, Appendix 4.1\n3\nMarch 2026\nEnvironmental Statement: Appendix 4.2 Outline decommissioning plan\n6.3.4, Appendix 4.2\n3\nMarch 2026\nEnvironmental Statement: Appendix 4.3 Outline fire risk management plan\n6.3.4, Appendix 4.3\n3\nMarch 2026\nEnvironmental Statement: Appendix 4.4 Outline operational environmental management plan\n6.3.4, Appendix 4.4\n3\nMarch 2026\nEnvironmental Statement: Appendix 4.5 Outline design principles\n6.3.4, Appendix 4.5\n2\nJanuary 2026\nEnvironmental Statement: Appendix 4.6 Crossings Schedule\n6.3.4, Appendix 4.6\n1\nApril 2025\nEnvironmental Statement: Appendix 6.1 Viewpoint Photograph Record – Cumulative Annotations Part A and Part B\n6.3.6, Appendix 6.1\n1\nJanuary 2026\nEnvironmental Statement: Appendix 6.2 Photomontages Part 1 – Summer\n6.3.6, Appendix 6.2\n1\nApril 2025\nEnvironmental Statement: Appendix 6.2 Photomontages Part 1 – Summer with Cumulative Annotations\n6.3.6, Appendix 6.2\n1\nJanuary 2026\nEnvironmental Statement: Appendix 6.2 Photomontages Part 2 – Winter\n6.3.6, Appendix 6.2\n1\nApril 2025\nEnvironmental Statement: Appendix 6.2 Photomontages Part 2 – Winter With Cumulative Annotations\n6.3.6, Appendix 6.2\n1\nJanuary 2026\nEnvironmental Statement: Appendix 6.3 Viewpoint Assessment\n6.3.6, Appendix 6.3\n2\nMarch 2026\nEnvironmental Statement: Appendix 6.4 – Residential Visual Amenity Assessment\n6.3.6, Appendix 6.4\n1\nApril 2025\nEnvironmental Statement: Appendix 6.5 Arboricultural impact assessment\n6.3.6, Appendix 6.5\n1\nApril 2025\nEnvironmental Statement: Appendix 6.6 Assessment of Public Rights of Way\n6.3.6 Appendix 6.6\n2\nMarch 2026\nEnvironmental Statement: Appendix 7.1 Legislation and Policy\n6.3.7 Appendix 7.1\n1\nApril 2025\nEnvironmental Statement: Appendix 7.2 Designated Sites\n6.3.7 Appendix 7.2\n1\nApril 2025\nEnvironmental Statement: Appendix 7.3 Habitat Report\n6.3.7 Appendix 7.3\n1\nApril 2025\nEnvironmental Statement: Appendix 7.4 Breeding Bird Report\n6.3.7 Appendix 7.4\n1\nApril 2025\nEnvironmental Statement: Appendix 7.5 Barn Owl Report (Confidential)\n6.3.7 Appendix 7.5\n1\nApril 2025\nEnvironmental Statement: Appendix 7.6 Wintering Bird Report\n6.3.7 Appendix 7.6\n1\nApril 2025\nEnvironmental Statement: Appendix 7.7 Bat Report\n6.3.7 Appendix 7.7\n1\nApril 2025\nEnvironmental Statement: Appendix 7.8 Badger Report (Confidential)\n6.3.7 Appendix 7.8\n1\nApril 2025\nEnvironmental Statement: Appendix 7.9 Otter and Water Vole Report\n6.3.7 Appendix 7.9\n1\nApril 2025\nEnvironmental Statement: Appendix 7.10 Great Crested Newt Report\n6.3.7 Appendix 7.10\n1\nApril 2025\nEnvironmental Statement: Appendix 7.11 Aquatic Invertebrates Report\n6.3.7 Appendix 7.11\n1\nApril 2025\nEnvironmental Statement: Appendix 7.12 Biodiversity Net Gain\n6.3.7 Appendix 7.12\n1\nApril 2025\nEnvironmental Statement: Appendix 7.13 Skylark Mitigation Strategy\n6.3.7 Appendix 7.13\n1\nApril 2025\nEnvironmental Statement: Appendix 7.14 Outline landscape ecology management plan\n6.3.7 Appendix 7.14\n2\nApril 2026\nEnvironmental Statement: Appendix 8.1 Flood Risk Assessment Part 1\n6.3.8 Appendix 8.1 Part 1\n4\nMarch 2026\nEnvironmental Statement: Appendix 8.1 Flood Risk Assessment Part 1 Rev 2 Appendix E update\n6.3.8 Appendix 8.1 Part 1\n1\nJanuary 2026\nEnvironmental Statement: Appendix 8.1 Flood Risk Assessment Part 2\n6.3.8 Appendix 8.1 Part 2\n1\nApril 2025\nEnvironmental Statement: Appendix 8.1 Flood Risk Assessment Part 3\n6.3.8 Appendix 8.1 Part 3\n2\nJanuary 2026\nEnvironmental Statement: Appendix 8.1 Flood Risk Assessment Part 3 Appendix G update only\n6.3.8 Appendix 8.1 Part 3\n1\nJanuary 2026\nEnvironmental Statement: Appendix 8.2 Surface water drainage strategy\n6.3.8 Appendix 8.2\n4\nMarch 2026\nEnvironmental Statement: Appendix 8.2 Surface Water Drainage Strategy Rev 2 Appendix B update only\n6.3.8 Appendix 8.2\n2\nJanuary 2026\nEnvironmental Statement: Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix G update only\n6.3.8 Appendix 8.2\n1\nJanuary 2026\nEnvironmental Statement: Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix H update only\n6.3.8 Appendix 8.2\n1\nJanuary 2026\nEnvironmental Statement: 6.3.8 Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix H update only\n6.3.8 Appendix 8.2\n1\nJanuary 2026\nEnvironmental Statement: 6.3.8 Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix L (New)\n6.3.8 Appendix 8.2\n1\nJanuary 2026\nEnvironmental Statement: 6.3.8 Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix M (New)\n6.3.8 Appendix 8.2\n1\nJanuary 2026\nEnvironmental Statement: Appendix 8.3 Water Framework Directive Assessment\n6.3.8, Appendix 8.3\n2\nJanuary 2026\nEnvironmental Statement: Appendix 9.1 Cultural Heritage Technical Baseline\n6.3.9 Appendix 9.1\n1\nApril 2025\nEnvironmental Statement: Appendix 9.2 Magnitude Surveys Geophysical Survey Report\n6.3.9 Appendix 9.2\n2\nMarch 2026\nEnvironmental Statement: Appendix 9.3 Archaeological Mitigation Statement\n6.3.9 Appendix 9.3\n1\nApril 2025\nEnvironmental Statement: Appendix 9.4 Outline written scheme of investigation for pre-determination trial trenching\n6.3.9 Appendix 9.4\n1\nApril 2025\nEnvironmental Statement: Appendix 9.5 Outline written scheme of investigation for post consent archaeological works\n6.3.9 Appendix 9.5\n2\nApril 2026\nEnvironmental Statement: Appendix 10.1 Outline supply chain, employment and skills plan\n6.3.10 Appendix 10.1\n2\nJanuary 2026\nEnvironmental Statement: Appendix 13.1 Transport Assessment\n6.3.13 Appendix 13.1\n1\nApril 2025\nEnvironmental Statement: Appendix 13.2 Outline construction traffic management plan\n6.3.13 Appendix 13.2\n2\nMarch 2026\nEnvironmental Statement: Appendix 14.1 Air Quality Appendices\n6.3.14 Appendix 14.1\n1\nApril 2025\nEnvironmental Statement: Appendix 15.1 Agricultural Land Classification Report\n6.3.15 Appendix 15.1\n1\nApril 2025\nEnvironmental Statement: Appendix 15.2 Outline soil management plan\n6.3.15 Appendix 15.2\n2\nJanuary 2026\nEnvironmental Statement: Appendix 16.1 Solar\n6.3.16 Appendix 16.1\n1\nApril 2025\nEnvironmental Statement: Appendix 17.1 Utilities Report Part 1\n6.3.17 Appendix 17.1 Part 1\n1\nApril 2025\nEnvironmental Statement: Appendix 17.1 Utilities Report Part 2\n6.3.17 Appendix 17.1 Part 2\n1\nApril 2025\nEnvironmental Statement: Appendix 17.1 Utilities Report Part 3\n6.3.17 Appendix 17.1 Part 3\n1\nApril 2025\nEnvironmental Statement: Appendix 17.1 Utilities Report Part 4\n6.3.17 Appendix 17.1 Part 4\n1\nApril 2025\nEnvironmental Statement: Appendix 17.1 Utilities Report Part 5\n6.3.17 Appendix 17.1 Part 5\n1\nApril 2025\nEnvironmental Statement: Appendix 17.1 Utilities Report Part 6\n6.3.17 Appendix 17.1 Part 6\n1\nApril 2025\nFigure 1.1 Site Location Plan\n6.4.1, Figure 1.1\n2\nJuly 2025\nFigure 2.1 Indicative Site Layout\n6.4.2, Figure 2.1\n2\nJuly 2025\nFigure 2.2 Cumulative Schemes Plan\n6.4.2, Figure 2.2\n1\nApril 2025\nFigure 3.1 Site Constraints Plan\n6.4.3, Figure 3.1\n1\nApril 2025\nFigure 3.2 Topographical Survey\n6.4.3. Figure 3.2\n2\nJuly 2025\nFigure 3.3 Public Rights of Way Plan\n6.4.3, Figure 3.3\n1\nApril 2025\nFigure 3.4 Alternative Sites\n6.4.3, Figure 3.4\n1\nApril 2025\nFigure 6.1 Site Location Plan\n6.4.6, Figure 6.1\n1\nApril 2025\nFigure 6.2 Landscape Designations\n6.4.6, Figure 6.2\n1\nApril 2025\nFigure 6.3 Topography\n6.4.6, Figure 6.3\n1\nApril 2025\nFigure 6.4 Landscape Character Areas\n6.4.6, Figure 6.4\n1\nApril 2025\nFigure 6.5a Visual Receptors (Settlements, A Roads, B Roads and Long-Distance Routes) Revision D\n6.4.6, Figure 6.5a\n1\nJune 2025\nFigure 6.5b Visual Receptors (Settlements, A Roads, B Roads and PROW)\n6.4.6, Figure 6.5b\n1\nApril 2025\nFigure 6.5c Visual Receptors (Settlements, A Roads, B Roads and Minor Roads)\n6.4.6, Figure 6.5c\n1\nApril 2025\nFigure 6.6a Screened Zone of Theoretical Visibility (SZTV) and viewpoint (VP) Locations (10km radius)\n6.4.6, Figure 6.6a\n1\nApril 2025\nFigure 6.6b SZTV and VP Locations (5km radius)\n6.4.6, Figure 6.6b\n1\nApril 2025\nFigure 6.6c SZTV and VP Locations (2km radius)\n6.4.6, Figure 6.6c\n1\nApril 2025\nFigure 6.7 SZTV and Landscape Character\n6.4.6, Figure 6.7\n1\nApril 2025\nFigure 6.8a SZTV and Visual Receptors (Settlements, A Roads, B Roads and Long Distance Routes)\n6.4.6, Figure 6.8a\n1\nApril 2025\nFigure 6.8b SZTV and Visual Receptors (Settlements, A Roads, B Roads and PROW)\n6.4.6, Figure 6.8b\n1\nApril 2025\nFigure 6.8c SZTV and Visual Receptors (Settlements, A Roads, B Roads and Minor Roads)\n6.4.6, Figure 6.8c\n1\nApril 2025\nFigure 6.9 Outline Landscape and Ecology Mitigation Strategy\n6.4.6, Figure 6.9\n1\nApril 2025\n6.4.8 Figure 8.1 Watercourses\n6.4.8, Figure 8.1\n1\nApril 2025\n6.4.8 Figure 8.2 Environment Agency Flood Zones\n6.4.8, Figure 8.2\n1\nApril 2025\n6.4.8 Figure 8.3 Environment Agency Surface Water Flood Extents\n6.4.8, Figure 8.3\n1\nApril 2025\n6.4.8 Figure 8.4 Groundwater and Surface Water Abstractions\n6.4.8, Figure 8.4\n1\nApril 2025\n6.4.9 Figure 9.1 Heritage Assets Considered Within The Environmental Statement\n6.4.9, Figure 9.1\n1\nApril 2025\n6.4.9 Figure 9.2 Designated Heritage Assets Within Relevant Study Area\n6.4.9, Figure 9.2\n1\nApril 2025\n6.4.9 Figure 9.3 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area\n6.4.9, Figure 9.3\n1\nApril 2025\n6.4.9 Figure 9.4 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area\n6.4.9, Figure 9.4\n1\nApril 2025\n6.4.9 Figure 9.5 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area\n6.4.9, Figure 9.5\n1\nApril 2025\n6.4.9 Figure 9.6 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area\n6.4.9, Figure 9.6\n1\nApril 2025\n6.4.9 Figure 9.7 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area\n6.4.9, Figure 9.7\n1\nApril 2025\n6.4.9 Figure 9.8 Important Hedgerows (Heritage)\n6.4.9, Figure 9.8\n1\nApril 2025\n6.4.10 Figure 10.1 Primary Impact Zone\n6.4.10, Figure 10.1\n1\nApril 2025\n6.4.10 Figure 10.2 Secondary Impact Zone\n6.4.10, Figure 10.2\n1\nApril 2025\n6.4.11 Figure 11.1 Assessment Locations and Daytime Specific Sound Levels\n6.4.11, Figure 11.1\n1\nApril 2025\n6.4.11 Figure 11.2 Assessment Locations and Night-time Specific Sound Levels\n6.4.11, Figure 11.2\n1\nApril 2025\n6.4.17 Figure 17.2 Utilities Plan\n6.4.17, Figure 17.2\n1\nApril 2025\nWest Burton Power Station plan\n8.61\n1\nApril 2026",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2026/1086/schedule/12",
    "retrieved_at": "2026-10-31T10:33:45.735898+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}