# The Steeple Renewables Project Order 2026, Schedule 12: DOCUMENTS TO BE CERTIFIED


(1) Document name
(2) Document reference
(3) Version
(4) Date
Site location plan
1.1
2
November 2025
Land plans
2.1
4
January 2026
Works plans
2.2
3
December 2025
Access and public rights of way plan
2.3
2
July 2025
Book of reference
4.3
3
April 2026
Environmental Statement: Non Technical Summary
6.1
2
March 2026
Environmental Statement: Chapter 0 Contents
6.2.0
1
April 2025
Environmental Statement: Chapter 1 Introduction
6.2.1
1
April 2025
Environmental Statement: Chapter 2 EIA Methodology & Public Consultation
6.2.2
1
April 2025
Environmental Statement: Chapter 3 Site Description, Site Selection and Iterative Design Process
6.2.3
1
April 2025
Environmental Statement: Chapter 4 Proposed Development
6.2.4
1
April 2025
Environmental Statement: Chapter 5 Planning Policy
6.2.5
1
April 2025
Environmental Statement: Chapter 6 Landscape and Visual Impact and Residential Amenity
6.2.6
1
April 2025
Environmental Statement: Chapter 7 Ecology and Biodiversity
6.2.7
3
April 2026
Environmental Statement: Chapter 8 Hydrology, Hydrogeology, Flood Risk and Drainage
6.2.8
2
January 2026
Environmental Statement: Chapter 9 Cultural Heritage
6.2.9
1
April 2025
Environmental Statement: Chapter 10 Socio Economics
6.2.10
1
April 2025
Environmental Statement: Chapter 11 Noise and Vibration
6.2.11
1
April 2025
Environmental Statement: Chapter 12 Climate Change
6.2.12
1
April 2025
Environmental Statement: Chapter 13 Transport and Access
6.2.13
1
April 2025
Environmental Statement: Chapter 14 Air Quality
6.2.14
2
January 2026
Environmental Statement: Chapter 16 Land Use and Agriculture
6.2.15
2
March 2026
Environmental Statement: Chapter 16 Glint and Glare
6.2.16
1
April 2025
Environmental Statement: Chapter 17 Miscellaneous Issues
6.2.17
1
April 2025
Environmental Statement: Chapter 18 Summary
6.2.18
2
March 2026
Environmental Statement: Chapter 19 Glossary
6.2.19
1
April 2025
Environmental Statement: Appendix 1.1 Steeple Project Environment Impact Assessment Scoping Report
6.3.1, Appendix 1.1
1
April 2025
Environmental Statement: Appendix 1.2 EIA Scoping Opinion
6.3.1, Appendix 1.2
1
April 2025
Environmental Statement: Appendix 1.3 Environment Agency EIA Scoping Response
6.3.1, Appendix 1.3
1
April 2025
Environmental Statement: Appendix 1.4 EIA Statement of Competence
6.3.1, Appendix 1.4
1
April 2025
Environmental Statement: Appendix 2.1 Schedule 4 Requirements of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 as amended
6.3.2 Appendix 2.1
1
April 2025
Environmental Statement: ES Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report
6.3.2 Appendix 2.2
2
December 2025
Environmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 1
6.3.2, Appendix 2.2 Part 1
2
December 2025
Environmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 2
6.3.2, Appendix 2.2 Part 2
2
December 2025
Environmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 3
6.3.2, Appendix 2.2 Part 3
2
December 2025
Environmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 4
6.3.2, Appendix 2.2 Part 4
2
January 2026
Environmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 5
6.3.2, Appendix 2.2 Part 5
2
January 2026
Environmental Statement: Appendix 2.3 Cumulative Sites Long List and Short List
6.3.2, Appendix 2.3
1
April 2025
Environmental Statement: Appendix 4.1 Outline construction environmental management plan
6.3.4, Appendix 4.1
3
March 2026
Environmental Statement: Appendix 4.2 Outline decommissioning plan
6.3.4, Appendix 4.2
3
March 2026
Environmental Statement: Appendix 4.3 Outline fire risk management plan
6.3.4, Appendix 4.3
3
March 2026
Environmental Statement: Appendix 4.4 Outline operational environmental management plan
6.3.4, Appendix 4.4
3
March 2026
Environmental Statement: Appendix 4.5 Outline design principles
6.3.4, Appendix 4.5
2
January 2026
Environmental Statement: Appendix 4.6 Crossings Schedule
6.3.4, Appendix 4.6
1
April 2025
Environmental Statement: Appendix 6.1 Viewpoint Photograph Record – Cumulative Annotations Part A and Part B
6.3.6, Appendix 6.1
1
January 2026
Environmental Statement: Appendix 6.2 Photomontages Part 1 – Summer
6.3.6, Appendix 6.2
1
April 2025
Environmental Statement: Appendix 6.2 Photomontages Part 1 – Summer with Cumulative Annotations
6.3.6, Appendix 6.2
1
January 2026
Environmental Statement: Appendix 6.2 Photomontages Part 2 – Winter
6.3.6, Appendix 6.2
1
April 2025
Environmental Statement: Appendix 6.2 Photomontages Part 2 – Winter With Cumulative Annotations
6.3.6, Appendix 6.2
1
January 2026
Environmental Statement: Appendix 6.3 Viewpoint Assessment
6.3.6, Appendix 6.3
2
March 2026
Environmental Statement: Appendix 6.4 – Residential Visual Amenity Assessment
6.3.6, Appendix 6.4
1
April 2025
Environmental Statement: Appendix 6.5 Arboricultural impact assessment
6.3.6, Appendix 6.5
1
April 2025
Environmental Statement: Appendix 6.6 Assessment of Public Rights of Way
6.3.6 Appendix 6.6
2
March 2026
Environmental Statement: Appendix 7.1 Legislation and Policy
6.3.7 Appendix 7.1
1
April 2025
Environmental Statement: Appendix 7.2 Designated Sites
6.3.7 Appendix 7.2
1
April 2025
Environmental Statement: Appendix 7.3 Habitat Report
6.3.7 Appendix 7.3
1
April 2025
Environmental Statement: Appendix 7.4 Breeding Bird Report
6.3.7 Appendix 7.4
1
April 2025
Environmental Statement: Appendix 7.5 Barn Owl Report (Confidential)
6.3.7 Appendix 7.5
1
April 2025
Environmental Statement: Appendix 7.6 Wintering Bird Report
6.3.7 Appendix 7.6
1
April 2025
Environmental Statement: Appendix 7.7 Bat Report
6.3.7 Appendix 7.7
1
April 2025
Environmental Statement: Appendix 7.8 Badger Report (Confidential)
6.3.7 Appendix 7.8
1
April 2025
Environmental Statement: Appendix 7.9 Otter and Water Vole Report
6.3.7 Appendix 7.9
1
April 2025
Environmental Statement: Appendix 7.10 Great Crested Newt Report
6.3.7 Appendix 7.10
1
April 2025
Environmental Statement: Appendix 7.11 Aquatic Invertebrates Report
6.3.7 Appendix 7.11
1
April 2025
Environmental Statement: Appendix 7.12 Biodiversity Net Gain
6.3.7 Appendix 7.12
1
April 2025
Environmental Statement: Appendix 7.13 Skylark Mitigation Strategy
6.3.7 Appendix 7.13
1
April 2025
Environmental Statement: Appendix 7.14 Outline landscape ecology management plan
6.3.7 Appendix 7.14
2
April 2026
Environmental Statement: Appendix 8.1 Flood Risk Assessment Part 1
6.3.8 Appendix 8.1 Part 1
4
March 2026
Environmental Statement: Appendix 8.1 Flood Risk Assessment Part 1 Rev 2 Appendix E update
6.3.8 Appendix 8.1 Part 1
1
January 2026
Environmental Statement: Appendix 8.1 Flood Risk Assessment Part 2
6.3.8 Appendix 8.1 Part 2
1
April 2025
Environmental Statement: Appendix 8.1 Flood Risk Assessment Part 3
6.3.8 Appendix 8.1 Part 3
2
January 2026
Environmental Statement: Appendix 8.1 Flood Risk Assessment Part 3 Appendix G update only
6.3.8 Appendix 8.1 Part 3
1
January 2026
Environmental Statement: Appendix 8.2 Surface water drainage strategy
6.3.8 Appendix 8.2
4
March 2026
Environmental Statement: Appendix 8.2 Surface Water Drainage Strategy Rev 2 Appendix B update only
6.3.8 Appendix 8.2
2
January 2026
Environmental Statement: Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix G update only
6.3.8 Appendix 8.2
1
January 2026
Environmental Statement: Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix H update only
6.3.8 Appendix 8.2
1
January 2026
Environmental Statement: 6.3.8 Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix H update only
6.3.8 Appendix 8.2
1
January 2026
Environmental Statement: 6.3.8 Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix L (New)
6.3.8 Appendix 8.2
1
January 2026
Environmental Statement: 6.3.8 Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix M (New)
6.3.8 Appendix 8.2
1
January 2026
Environmental Statement: Appendix 8.3 Water Framework Directive Assessment
6.3.8, Appendix 8.3
2
January 2026
Environmental Statement: Appendix 9.1 Cultural Heritage Technical Baseline
6.3.9 Appendix 9.1
1
April 2025
Environmental Statement: Appendix 9.2 Magnitude Surveys Geophysical Survey Report
6.3.9 Appendix 9.2
2
March 2026
Environmental Statement: Appendix 9.3 Archaeological Mitigation Statement
6.3.9 Appendix 9.3
1
April 2025
Environmental Statement: Appendix 9.4 Outline written scheme of investigation for pre-determination trial trenching
6.3.9 Appendix 9.4
1
April 2025
Environmental Statement: Appendix 9.5 Outline written scheme of investigation for post consent archaeological works
6.3.9 Appendix 9.5
2
April 2026
Environmental Statement: Appendix 10.1 Outline supply chain, employment and skills plan
6.3.10 Appendix 10.1
2
January 2026
Environmental Statement: Appendix 13.1 Transport Assessment
6.3.13 Appendix 13.1
1
April 2025
Environmental Statement: Appendix 13.2 Outline construction traffic management plan
6.3.13 Appendix 13.2
2
March 2026
Environmental Statement: Appendix 14.1 Air Quality Appendices
6.3.14 Appendix 14.1
1
April 2025
Environmental Statement: Appendix 15.1 Agricultural Land Classification Report
6.3.15 Appendix 15.1
1
April 2025
Environmental Statement: Appendix 15.2 Outline soil management plan
6.3.15 Appendix 15.2
2
January 2026
Environmental Statement: Appendix 16.1 Solar
6.3.16 Appendix 16.1
1
April 2025
Environmental Statement: Appendix 17.1 Utilities Report Part 1
6.3.17 Appendix 17.1 Part 1
1
April 2025
Environmental Statement: Appendix 17.1 Utilities Report Part 2
6.3.17 Appendix 17.1 Part 2
1
April 2025
Environmental Statement: Appendix 17.1 Utilities Report Part 3
6.3.17 Appendix 17.1 Part 3
1
April 2025
Environmental Statement: Appendix 17.1 Utilities Report Part 4
6.3.17 Appendix 17.1 Part 4
1
April 2025
Environmental Statement: Appendix 17.1 Utilities Report Part 5
6.3.17 Appendix 17.1 Part 5
1
April 2025
Environmental Statement: Appendix 17.1 Utilities Report Part 6
6.3.17 Appendix 17.1 Part 6
1
April 2025
Figure 1.1 Site Location Plan
6.4.1, Figure 1.1
2
July 2025
Figure 2.1 Indicative Site Layout
6.4.2, Figure 2.1
2
July 2025
Figure 2.2 Cumulative Schemes Plan
6.4.2, Figure 2.2
1
April 2025
Figure 3.1 Site Constraints Plan
6.4.3, Figure 3.1
1
April 2025
Figure 3.2 Topographical Survey
6.4.3. Figure 3.2
2
July 2025
Figure 3.3 Public Rights of Way Plan
6.4.3, Figure 3.3
1
April 2025
Figure 3.4 Alternative Sites
6.4.3, Figure 3.4
1
April 2025
Figure 6.1 Site Location Plan
6.4.6, Figure 6.1
1
April 2025
Figure 6.2 Landscape Designations
6.4.6, Figure 6.2
1
April 2025
Figure 6.3 Topography
6.4.6, Figure 6.3
1
April 2025
Figure 6.4 Landscape Character Areas
6.4.6, Figure 6.4
1
April 2025
Figure 6.5a Visual Receptors (Settlements, A Roads, B Roads and Long-Distance Routes) Revision D
6.4.6, Figure 6.5a
1
June 2025
Figure 6.5b Visual Receptors (Settlements, A Roads, B Roads and PROW)
6.4.6, Figure 6.5b
1
April 2025
Figure 6.5c Visual Receptors (Settlements, A Roads, B Roads and Minor Roads)
6.4.6, Figure 6.5c
1
April 2025
Figure 6.6a Screened Zone of Theoretical Visibility (SZTV) and viewpoint (VP) Locations (10km radius)
6.4.6, Figure 6.6a
1
April 2025
Figure 6.6b SZTV and VP Locations (5km radius)
6.4.6, Figure 6.6b
1
April 2025
Figure 6.6c SZTV and VP Locations (2km radius)
6.4.6, Figure 6.6c
1
April 2025
Figure 6.7 SZTV and Landscape Character
6.4.6, Figure 6.7
1
April 2025
Figure 6.8a SZTV and Visual Receptors (Settlements, A Roads, B Roads and Long Distance Routes)
6.4.6, Figure 6.8a
1
April 2025
Figure 6.8b SZTV and Visual Receptors (Settlements, A Roads, B Roads and PROW)
6.4.6, Figure 6.8b
1
April 2025
Figure 6.8c SZTV and Visual Receptors (Settlements, A Roads, B Roads and Minor Roads)
6.4.6, Figure 6.8c
1
April 2025
Figure 6.9 Outline Landscape and Ecology Mitigation Strategy
6.4.6, Figure 6.9
1
April 2025
6.4.8 Figure 8.1 Watercourses
6.4.8, Figure 8.1
1
April 2025
6.4.8 Figure 8.2 Environment Agency Flood Zones
6.4.8, Figure 8.2
1
April 2025
6.4.8 Figure 8.3 Environment Agency Surface Water Flood Extents
6.4.8, Figure 8.3
1
April 2025
6.4.8 Figure 8.4 Groundwater and Surface Water Abstractions
6.4.8, Figure 8.4
1
April 2025
6.4.9 Figure 9.1 Heritage Assets Considered Within The Environmental Statement
6.4.9, Figure 9.1
1
April 2025
6.4.9 Figure 9.2 Designated Heritage Assets Within Relevant Study Area
6.4.9, Figure 9.2
1
April 2025
6.4.9 Figure 9.3 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area
6.4.9, Figure 9.3
1
April 2025
6.4.9 Figure 9.4 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area
6.4.9, Figure 9.4
1
April 2025
6.4.9 Figure 9.5 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area
6.4.9, Figure 9.5
1
April 2025
6.4.9 Figure 9.6 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area
6.4.9, Figure 9.6
1
April 2025
6.4.9 Figure 9.7 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area
6.4.9, Figure 9.7
1
April 2025
6.4.9 Figure 9.8 Important Hedgerows (Heritage)
6.4.9, Figure 9.8
1
April 2025
6.4.10 Figure 10.1 Primary Impact Zone
6.4.10, Figure 10.1
1
April 2025
6.4.10 Figure 10.2 Secondary Impact Zone
6.4.10, Figure 10.2
1
April 2025
6.4.11 Figure 11.1 Assessment Locations and Daytime Specific Sound Levels
6.4.11, Figure 11.1
1
April 2025
6.4.11 Figure 11.2 Assessment Locations and Night-time Specific Sound Levels
6.4.11, Figure 11.2
1
April 2025
6.4.17 Figure 17.2 Utilities Plan
6.4.17, Figure 17.2
1
April 2025
West Burton Power Station plan
8.61
1
April 2026

---
Source: https://www.legislation.gov.uk/uksi/2026/1086/schedule/12 (the official version)
Page: https://openlegislation.uk/steeple-renewables-project-order-2026/schedule-12
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

