  "heading": "Work No. 4",
  "text": "Works to lay high voltage electrical cables and to extend Sellindge Substation to facilitate grid connection including—\n(a) laying of electrical cables to connect Work No. 3 to Sellindge Substation, including tunnelling, boring, open cut trenching and horizontal directional drilling works for trenchless crossings;\n(b) works to allow electrical cable crossings of non-navigable rivers, other watercourses and drains, permissive paths, public rights of way and other highways;\n(c) works to allow installation of bridge crossings over non-navigable rivers and other watercourses and drains;\n(d) crossing of Network Rail infrastructure either—\n(i) using existing electrical ducts; or\n(ii) through the installation of new cable ducts;\n(e) laying down of internal access tracks, ramps, means of access, footpaths, roads, landscaping and vegetation management, signage, information boards and temporary secured construction laydown areas; and\n(f) extension of the Sellindge Substation including—\n(i) installation of new or amended structures, including outdoor air insulated switchgear or indoor gas insulated switchgear, circuit breakers, disconnectors, earth switches, bus-bars, steel supports and ancillary electrical infrastructure;\n(ii) laying down of access tracks, ramps, means of access, footpaths and roads;\n(iii) construction of a retaining wall, landscaping and vegetation management, signage, information boards and temporary construction laydown areas;\n(iv) fencing, gates, boundary treatment and other means of enclosure;\n(v) provision of security and monitoring measures such as CCTV columns, lighting columns and lighting, cameras, and communication infrastructure; and\n(vi) drainage works;",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 1 para. 4 in force at 13.11.2025, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2025/1175/schedule/1/paragraph/4",
    "retrieved_at": "2026-10-28T21:09:52.508378+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}