# The Stonestreet Green Solar Order 2025, Paragraph 9: Site Wide Works

Extent: E+W+S

In connection with and in addition to Work Nos. 1 to 8, further associated development comprising such other works as may be necessary or expedient for the purposes of or in connection with the authorised development and which are within the Order limits and fall within the scope of work assessed by the environmental statement including—
(a) site preparation works and site clearance, including vegetation removal;
(b) earthworks;
(c) remediation of contamination;
(d) alteration to locations of services and utilities infrastructure;
(e) works for the benefit or protection of land affected by the authorised development;
(f) landscaping and biodiversity mitigation and enhancement measures including planting to the extent not undertaken under Work No. 8;
(g) sustainable drainage system ponds, depression storage, runoff outfalls, general drainage and irrigation infrastructure, including bunds, embankments, trenching, and swales, systems and improvements, maintenance or extensions to existing drainage and irrigation systems;
(h) laying down of public rights of way diversions, signage and information boards and extinguishment of existing public rights of way; and
(i) works to alter, maintain and repair streets and access roads, including relocation, removal or provision of street signage and furniture in, under or above a street and works to facilitate traffic management.

---
Source: https://www.legislation.gov.uk/uksi/2025/1175/schedule/1/paragraph/9 (the official version)
Page: https://openlegislation.uk/stonestreet-green-solar-order-2025/schedule-1/paragraph-9
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.