  "url": "https://openlegislation.uk/stonestreet-green-solar-order-2025/schedule-10",
  "json_url": "https://openlegislation.uk/stonestreet-green-solar-order-2025/schedule-10.json",
  "legislation": "uksi/2025/1175",
  "legislation_title": "The Stonestreet Green Solar Order 2025",
  "legislation_url": "https://openlegislation.uk/stonestreet-green-solar-order-2025",
  "path": "schedule/10",
  "kind": "schedule",
  "number": "10",
  "heading": "LAND IN RESPECT OF WHICH ONLY RIGHTS ETC MAY BE ACQUIRED",
  "text": "(1) Plot reference (as shown on the land plans)\n(2) Work No.\n(3) Purposes for which rights over land may be acquired and restrictive covenants imposed\n3/13, 3/18, 3/21, 3/24, 4/11\nNo Work No.\nSite Wide Works\n(a) site preparation works and site clearance, including vegetation removal;\n(b) remediation of contamination;\n(c) alteration to locations of services and utilities infrastructure;\n(d) works for the benefit or protection of land affected by the authorised development;\n(e) landscaping and biodiversity mitigation and enhancement measures including planting to the extent not undertaken under Work No. 8;\n(f) sustainable drainage system ponds, depression storage, runoff outfalls, general drainage and irrigation infrastructure, including bunds, embankments, trenching, and swales, systems and improvements, maintenance or extensions to existing drainage and irrigation systems;\n(g) laying down of public rights of way diversions, signage and information boards and extinguishment of existing public rights of way;\n(h) works to alter, maintain and repair streets and access roads, including relocation, removal or provision of street signage and furniture in, under or above a street and works to facilitate traffic management;\n(i) alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and road widening and to remove impediments (including vegetation) to such access;\n(j) install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures;\n(k) remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and\n(l) restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development.\n3/50, 3/51, 5/5, 5/6, 5/7, 5/10, 5/11, 5/12, 5/14, 5/16, 5/17, 5/18, 5/19\nWork No. 4 and Site Wide Works\n(a) laying of electrical cables to connect Work No. 3 to Sellindge Substation, including tunnelling, boring, open cut trenching and horizontal directional drilling works for trenchless crossings;\n(b) works to allow electrical cable crossings of non-navigable rivers, other watercourses and drains, permissive paths, public rights of way and other highways;\n(c) works to allow installation of bridge crossings over non-navigable rivers and other watercourses and drains;\n(d) crossing of Network Rail infrastructure either—\n(i) using existing electrical ducts; or\n(ii) through the installation of new cable ducts;\n(e) laying down of internal access tracks, ramps, means of access, footpaths, roads, landscaping and vegetation management, signage, information boards and temporary secured construction laydown areas;\n(f) extension of the Sellindge Substation including—\n(i) installation of new or amended structures, including outdoor air insulated switchgear or indoor gas insulated switchgear, circuit breakers, disconnectors, earth switches, bus-bars, steel supports and ancillary electrical infrastructure;\n(ii) laying down of access tracks, ramps, means of access, footpaths and roads;\n(iii) construction of a retaining wall, landscaping and vegetation management, signage, information boards and temporary construction laydown areas;\n(iv) fencing, gates, boundary treatment and other means of enclosure;\n(v) provision of security and monitoring measures such as CCTV columns, lighting columns and lighting, cameras, and communication infrastructure; and\n(vi) drainage works;\n(g) site preparation works and site clearance, including vegetation removal;\n(h) earthworks;\n(i) remediation of contamination;\n(j) alteration to locations of services and utilities infrastructure;\n(k) works for the benefit or protection of land affected by the authorised development;\n(l) landscaping and biodiversity mitigation and enhancement measures including planting to the extent not undertaken under Work No. 8;\n(m) sustainable drainage system ponds, depression storage, runoff outfalls, general drainage and irrigation infrastructure, including bunds, embankments, trenching, and swales, systems and improvements, maintenance or extensions to existing drainage and irrigation systems;\n(n) laying down of public rights of way diversions, signage and information boards and extinguishment of existing public rights of way;\n(o) works to alter, maintain and repair streets and access roads, including relocation, removal or provision of street signage and furniture in, under or above a street and works to facilitate traffic management;\n(p) alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and road widening and to remove impediments (including vegetation) to such access;\n(q) install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures;\n(r) remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and\n(s) restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development.\n5/8, 5/9, 5/13, 5/15\nWork No. 4 and Site Wide Works\n(a) laying of electrical cables to connect Work No. 3 to Sellindge Substation, including tunnelling, boring, open cut trenching and horizontal directional drilling works for trenchless crossings;\n(b) works to allow electrical cable crossings of non-navigable rivers, other watercourses and drains, permissive paths, public rights of way and other highways;\n(c) works to allow installation of bridge crossings over non-navigable rivers and other watercourses and drains;\n(d) crossing of Network Rail infrastructure either—\n(i) using existing electrical ducts; or\n(ii) through the installation of new cable ducts;\n(e) laying down of internal access tracks, ramps, means of access, footpaths, roads, landscaping and vegetation management, signage, information boards and temporary secured construction laydown areas;\n(f) extension of the Sellindge Substation including—\n(i) installation of new or amended structures, including outdoor air insulated switchgear or indoor gas insulated switchgear, circuit breakers, disconnectors, earth switches, bus-bars, steel supports and ancillary electrical infrastructure;\n(ii) laying down of access tracks, ramps, means of access, footpaths and roads;\n(iii) construction of a retaining wall, landscaping and vegetation management, signage, information boards and temporary construction laydown areas;\n(iv) fencing, gates, boundary treatment and other means of enclosure;\n(v) provision of security and monitoring measures such as CCTV columns, lighting columns and lighting, cameras, and communication infrastructure; and\n(vi) drainage works;\n(g) site preparation works and site clearance, including vegetation removal;\n(h) earthworks;\n(i) remediation of contamination;\n(j) alteration to locations of services and utilities infrastructure;\n(k) works for the benefit or protection of land affected by the authorised development;\n(l) landscaping and biodiversity mitigation and enhancement measures including planting to the extent not undertaken under Work No. 8;\n(m) sustainable drainage system ponds, depression storage, runoff outfalls, general drainage and irrigation infrastructure, including bunds, embankments, trenching, and swales, systems and improvements, maintenance or extensions to existing drainage and irrigation systems;\n(n) laying down of public rights of way diversions, signage and information boards and extinguishment of existing public rights of way;\n(o) works to alter, maintain and repair streets and access roads, including relocation, removal or provision of street signage and furniture in, under or above a street and works to facilitate traffic management;\n(p) alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and road widening and to remove impediments (including vegetation) to such access;\n(q) install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures;\n(r) remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development;\n(s) restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development;\n(t) install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures and to connect such cables and services to the Sellindge Substation;\n(u) install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain watercourses, public sewers and drains and drainage apparatus and equipment;\n(v) restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development; and\n(w) install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain soft landscaping and biodiversity measures.\n3/8, 3/23, 4/5, 4/6, 4/7, 4/8\nWork No. 5 and Site Wide Works\n(a) fencing, gates, boundary treatment and other means of enclosure;\n(b) provision of security and monitoring measures such as CCTV columns, lighting columns and lighting, a fence detection system, cameras, weather stations, and communication infrastructure;\n(c) laying of electrical cables, including but not limited to electrical cables connecting Work No. 1, Work No. 2 and Work No. 3, including works to allow electrical cables crossings of non-navigable rivers, other watercourses and drains, permissive paths, public rights of way and other highways;\n(d) works to allow installation of bridge crossings over non-navigable rivers and other watercourses and drains;\n(e) laying down of internal access tracks (including fire access tracks), improvement of existing tracks, ramps, means of access, and roads, including construction signage and information boards;\n(f) provision of water tanks and pipework connection to hydrants located at inverter stations where BESS installed;\n(g) equipment and materials storage during construction and decommissioning phases;\n(h) site preparation works and site clearance, including vegetation removal;\n(i) earthworks;\n(j) remediation of contamination;\n(k) alteration to locations of services and utilities infrastructure;\n(l) works for the benefit or protection of land affected by the authorised development;\n(m) landscaping and biodiversity mitigation and enhancement measures including planting to the extent not undertaken under Work No. 8;\n(n) sustainable drainage system ponds, depression storage, runoff outfalls, general drainage and irrigation infrastructure, including bunds, embankments, trenching, and swales, systems and improvements, maintenance or extensions to existing drainage and irrigation systems;\n(o) laying down of public rights of way diversions, signage and information boards and extinguishment of existing public rights of way;\n(p) works to alter, maintain and repair streets and access roads, including relocation, removal or provision of street signage and furniture in, under or above a street and works to facilitate traffic management;\n(q) alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and road widening and to remove impediments (including vegetation) to such access;\n(r) install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures;\n(s) remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and\n(t) restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development.\n3/2, 3/4\nWork No. 8 and Site Wide Works\n(a) landscape and biodiversity enhancement measures, including habitat creation and management and seating;\n(b) mitigation and biodiversity enhancement planting;\n(c) landscape reinforcement works;\n(d) works to allow installation of bridge crossings over non-navigable rivers and other watercourses and drains;\n(e) works to alter, maintain, repair or replace existing crossing structures over non-navigable rivers and other watercourses and drains;\n(f) site preparation works and site clearance, including vegetation removal;\n(g) remediation of contamination;\n(h) works for the benefit or protection of land affected by the authorised development;\n(i) landscaping and biodiversity mitigation and enhancement measures including planting to the extent not undertaken under Work No. 8;\n(j) alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and road widening and to remove impediments (including vegetation) to such access;\n(k) install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures;\n(l) remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and\n(m) restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development.\n5/1, 5/2, 5/3, 5/4\nWork No. 4, Work No. 6 and Site Wide Works\n(a) laying of electrical cables to connect Work No. 3 to Sellindge Substation, including tunnelling, boring, open cut trenching and horizontal directional drilling works for trenchless crossings;\n(b) works to allow electrical cable crossings of non-navigable rivers, other watercourses and drains, permissive paths, public rights of way and other highways;\n(c) works to allow installation of bridge crossings over non-navigable rivers and other watercourses and drains;\n(d) crossing of Network Rail infrastructure either—\n(i) using existing electrical ducts; or\n(ii) through the installation of new cable ducts;\n(e) laying down of internal access tracks, ramps, means of access, footpaths, roads, landscaping and vegetation management, signage, information boards and temporary secured construction laydown areas;\n(f) extension of the Sellindge Substation including—\n(i) installation of new or amended structures, including outdoor air insulated switchgear or indoor gas insulated switchgear, circuit breakers, disconnectors, earth switches, bus-bars, steel supports and ancillary electrical infrastructure;\n(ii) laying down of access tracks, ramps, means of access, footpaths and roads;\n(iii) construction of a retaining wall, landscaping and vegetation management, signage, information boards and temporary construction laydown areas;\n(iv) fencing, gates, boundary treatment and other means of enclosure;\n(v) provision of security and monitoring measures such as CCTV columns, lighting columns and lighting, cameras, and communication infrastructure; and\n(vi) drainage works;\n(g) creation of accesses from the highway;\n(h) creation of visibility splays;\n(i) upgrading and repairing of existing accesses;\n(j) highways improvements;\n(k) site preparation works and site clearance, including vegetation removal;\n(l) earthworks;\n(m) remediation of contamination;\n(n) alteration to locations of services and utilities infrastructure;\n(o) works for the benefit or protection of land affected by the authorised development;\n(p) landscaping and biodiversity mitigation and enhancement measures including planting to the extent not undertaken under Work No. 8;\n(q) sustainable drainage system ponds, depression storage, runoff outfalls, general drainage and irrigation infrastructure, including bunds, embankments, trenching, and swales, systems and improvements, maintenance or extensions to existing drainage and irrigation systems;\n(r) laying down of public rights of way diversions, signage and information boards and extinguishment of existing public rights of way;\n(s) works to alter, maintain and repair streets and access roads, including relocation, removal or provision of street signage and furniture in, under or above a street and works to facilitate traffic management;\n(t) alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and road widening and to remove impediments (including vegetation) to such access;\n(u) install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures;\n(v) remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and\n(w) restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development.\n3/35, 3/40, 3/46\nWork No. 8 and Site Wide Works\n(a) landscape and biodiversity enhancement measures, including habitat creation and management and seating;\n(b) mitigation and biodiversity enhancement planting;\n(c) landscape reinforcement works;\n(d) works to allow installation of bridge crossings over non-navigable rivers and other watercourses and drains;\n(e) works to alter, maintain, repair or replace existing crossing structures over non-navigable rivers and other watercourses and drains;\n(f) site preparation works and site clearance, including vegetation removal;\n(g) remediation of contamination;\n(h) works for the benefit or protection of land affected by the authorised development;\n(i) landscaping and biodiversity mitigation and enhancement measures including planting to the extent not undertaken under Work No. 8;\n(j) earthworks;\n(k) sustainable drainage system ponds, depression storage, runoff outfalls, general drainage and irrigation infrastructure, including bunds, embankments, trenching, and swales, systems and improvements, maintenance or extensions to existing drainage and irrigation systems;\n(l) alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and road widening and to remove impediments (including vegetation) to such access;\n(m) install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures;\n(n) remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and\n(o) restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development.\n3/45\nWork No. 4, Work No. 8 and Site Wide Works\n(a) laying of electrical cables to connect Work No. 3 to Sellindge Substation, including tunnelling, boring, open cut trenching and horizontal directional drilling works for trenchless crossings;\n(b) works to allow electrical cable crossings of non-navigable rivers, other watercourses and drains, permissive paths, public rights of way and other highways;\n(c) works to allow installation of bridge crossings over non-navigable rivers and other watercourses and drains;\n(d) crossing of Network Rail infrastructure either—\n(i) using existing electrical ducts; or\n(ii) through the installation of new cable ducts;\n(e) laying down of internal access tracks, ramps, means of access, footpaths, roads, landscaping and vegetation management, signage, information boards and temporary secured construction laydown areas;\n(f) extension of the Sellindge Substation including—\n(i) installation of new or amended structures, including outdoor air insulated switchgear or indoor gas insulated switchgear, circuit breakers, disconnectors, earth switches, bus-bars, steel supports and ancillary electrical infrastructure;\n(ii) laying down of access tracks, ramps, means of access, footpaths and roads;\n(iii) construction of a retaining wall, landscaping and vegetation management, signage, information boards and temporary construction laydown areas;\n(iv) fencing, gates, boundary treatment and other means of enclosure;\n(v) provision of security and monitoring measures such as CCTV columns, lighting columns and lighting, cameras, and communication infrastructure; and\n(vi) drainage works;\n(g) landscape and biodiversity enhancement measures, including habitat creation and management and seating;\n(h) mitigation and biodiversity enhancement planting;\n(i) landscape reinforcement works;\n(j) works to allow installation of bridge crossings over non-navigable rivers and other watercourses and drains;\n(k) works to alter, maintain, repair or replace existing crossing structures over non-navigable rivers and other watercourses and drains;\n(l) site preparation works and site clearance, including vegetation removal;\n(m) remediation of contamination;\n(n) works for the benefit or protection of land affected by the authorised development;\n(o) landscaping and biodiversity mitigation and enhancement measures including planting to the extent not undertaken under Work No. 8;\n(p) sustainable drainage system ponds, depression storage, runoff outfalls, general drainage and irrigation infrastructure, including bunds, embankments, trenching, and swales, systems and improvements, maintenance or extensions to existing drainage and irrigation systems;\n(q) alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and road widening and to remove impediments (including vegetation) to such access;\n(r) install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures;\n(s) remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and\n(t) restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development.\n3/49\nWork No. 4, Work No. 8 and Site Wide Works\n(a) laying of electrical cables to connect Work No. 3 to Sellindge Substation, including tunnelling, boring, open cut trenching and horizontal directional drilling works for trenchless crossings;\n(b) works to allow electrical cable crossings of non-navigable rivers, other watercourses and drains, permissive paths, public rights of way and other highways;\n(c) works to allow installation of bridge crossings over non-navigable rivers and other watercourses and drains;\n(d) crossing of Network Rail infrastructure either—\n(i) using existing electrical ducts; or\n(ii) through the installation of new cable ducts;\n(e) laying down of internal access tracks, ramps, means of access, footpaths, roads, landscaping and vegetation management, signage, information boards and temporary secured construction laydown areas;\n(f) extension of the Sellindge Substation including—\n(i) installation of new or amended structures, including outdoor air insulated switchgear or indoor gas insulated switchgear, circuit breakers, disconnectors, earth switches, bus-bars, steel supports and ancillary electrical infrastructure;\n(ii) laying down of access tracks, ramps, means of access, footpaths and roads;\n(iii) construction of a retaining wall, landscaping and vegetation management, signage, information boards and temporary construction laydown areas;\n(iv) fencing, gates, boundary treatment and other means of enclosure;\n(v) provision of security and monitoring measures such as CCTV columns, lighting columns and lighting, cameras, and communication infrastructure; and\n(vi) drainage works;\n(g) landscape and biodiversity enhancement measures, including habitat creation and management and seating;\n(h) mitigation and biodiversity enhancement planting;\n(i) landscape reinforcement works;\n(j) works to allow installation of bridge crossings over non-navigable rivers and other watercourses and drains;\n(k) works to alter, maintain, repair or replace existing crossing structures over non-navigable rivers and other watercourses and drains;\n(l) site preparation works and site clearance, including vegetation removal;\n(m) earthworks;\n(n) remediation of contamination;\n(o) alteration to locations of services and utilities infrastructure;\n(p) works for the benefit or protection of land affected by the authorised development;\n(q) landscaping and biodiversity mitigation and enhancement measures including planting to the extent not undertaken under Work No. 8;\n(r) sustainable drainage system ponds, depression storage, runoff outfalls, general drainage and irrigation infrastructure, including bunds, embankments, trenching, and swales, systems and improvements, maintenance or extensions to existing drainage and irrigation systems;\n(s) alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and road widening and to remove impediments (including vegetation) to such access;\n(t) install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures;\n(u) remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and\n(v) restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development.\n1/5, 4/1, 4/2, 4/3\nWork No. 5, Work No. 6 and Site Wide Works\n(a) fencing, gates, boundary treatment and other means of enclosure;\n(b) provision of security and monitoring measures such as CCTV columns, lighting columns and lighting, a fence detection system, cameras, weather stations, and communication infrastructure;\n(c) laying of electrical cables, including but not limited to electrical cables connecting Work No. 1, Work No. 2 and Work No. 3, including works to allow electrical cables crossings of non-navigable rivers, other watercourses and drains, permissive paths, public rights of way and other highways;\n(d) works to allow installation of bridge crossings over non-navigable rivers and other watercourses and drains;\n(e) laying down of internal access tracks (including fire access tracks), improvement of existing tracks, ramps, means of access, and roads, including construction signage and information boards;\n(f) provision of water tanks and pipework connection to hydrants located at inverter stations where BESS installed;\n(g) equipment and materials storage during construction and decommissioning phases;\n(h) creation of accesses from the highway;\n(i) creation of visibility splays;\n(j) upgrading and repairing of existing accesses;\n(k) highways improvements;\n(l) site preparation works and site clearance, including vegetation removal;\n(m) earthworks;\n(n) remediation of contamination;\n(o) alteration to locations of services and utilities infrastructure;\n(p) works for the benefit or protection of land affected by the authorised development;\n(q) landscaping and biodiversity mitigation and enhancement measures including planting to the extent not undertaken under Work No. 8;\n(r) sustainable drainage system ponds, depression storage, runoff outfalls, general drainage and irrigation infrastructure, including bunds, embankments, trenching, and swales, systems and improvements, maintenance or extensions to existing drainage and irrigation systems;\n(s) laying down of public rights of way diversions, signage and information boards and extinguishment of existing public rights of way;\n(t) works to alter, maintain and repair streets and access roads, including relocation, removal or provision of street signage and furniture in, under or above a street and works to facilitate traffic management;\n(u) alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and road widening and to remove impediments (including vegetation) to such access;\n(v) install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures;\n(w) remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and\n(x) restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development.\n3/20, 3/22\nWork No. 5, Work No. 7 and Site Wide Works\n(a) fencing, gates, boundary treatment and other means of enclosure;\n(b) provision of security and monitoring measures such as CCTV columns, lighting columns and lighting, a fence detection system, cameras, weather stations, and communication infrastructure;\n(c) laying of electrical cables, including but not limited to electrical cables connecting Work No. 1, Work No. 2 and Work No. 3, including works to allow electrical cables crossings of non-navigable rivers, other watercourses and drains, permissive paths, public rights of way and other highways;\n(d) works to allow installation of bridge crossings over non-navigable rivers and other watercourses and drains;\n(e) laying down of internal access tracks (including fire access tracks), improvement of existing tracks, ramps, means of access, and roads, including construction signage and information boards;\n(f) provision of water tanks and pipework connection to hydrants located at inverter stations where BESS installed;\n(g) equipment and materials storage during construction and decommissioning phases;\n(h) compound areas including hardstanding, turning and loading areas, car parking, offices/welfare facilities, storage areas, waste skip areas, solar PV panel testing area, bunded area for storage of fuels and hydrocarbons, security fencing and hoarding;\n(i) an internal haulage road comprising temporary permeable ground protection mats including passing bays, means of access, and signage;\n(j) site preparation works and site clearance, including vegetation removal;\n(k) earthworks;\n(l) remediation of contamination;\n(m) alteration to locations of services and utilities infrastructure;\n(n) works for the benefit or protection of land affected by the authorised development;\n(o) landscaping and biodiversity mitigation and enhancement measures including planting to the extent not undertaken under Work No. 8;\n(p) sustainable drainage system ponds, depression storage, runoff outfalls, general drainage and irrigation infrastructure, including bunds, embankments, trenching, and swales, systems and improvements, maintenance or extensions to existing drainage and irrigation systems;\n(q) laying down of public rights of way diversions, signage and information boards and extinguishment of existing public rights of way;\n(r) works to alter, maintain and repair streets and access roads, including relocation, removal or provision of street signage and furniture in, under or above a street and works to facilitate traffic management;\n(s) alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and road widening and to remove impediments (including vegetation) to such access;\n(t) install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures;\n(u) remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and\n(v) restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development.\n3/1, 3/6\nWork No. 5, Work No. 8 and Site Wide Works\n(a) fencing, gates, boundary treatment and other means of enclosure;\n(b) provision of security and monitoring measures such as CCTV columns, lighting columns and lighting, a fence detection system, cameras, weather stations, and communication infrastructure;\n(c) laying of electrical cables, including but not limited to electrical cables connecting Work No. 1, Work No. 2 and Work No. 3, including works to allow electrical cables crossings of non-navigable rivers, other watercourses and drains, permissive paths, public rights of way and other highways;\n(d) works to allow installation of bridge crossings over non-navigable rivers and other watercourses and drains;\n(e) laying down of internal access tracks (including fire access tracks), improvement of existing tracks, ramps, means of access, and roads, including construction signage and information boards;\n(f) provision of water tanks and pipework connection to hydrants located at inverter stations where BESS installed;\n(g) equipment and materials storage during construction and decommissioning phases;\n(h) landscape and biodiversity enhancement measures, including habitat creation and management and seating;\n(i) mitigation and biodiversity enhancement planting;\n(j) landscape reinforcement works;\n(k) works to allow installation of bridge crossings over non-navigable rivers and other watercourses and drains;\n(l) works to alter, maintain, repair or replace existing crossing structures over non-navigable rivers and other watercourses and drains;\n(m) site preparation works and site clearance, including vegetation removal;\n(n) earthworks;\n(o) remediation of contamination;\n(p) alteration to locations of services and utilities infrastructure;\n(q) works for the benefit or protection of land affected by the authorised development;\n(r) landscaping and biodiversity mitigation and enhancement measures including planting to the extent not undertaken under Work No. 8;\n(s) sustainable drainage system ponds, depression storage, runoff outfalls, general drainage and irrigation infrastructure, including bunds, embankments, trenching, and swales, systems and improvements, maintenance or extensions to existing drainage and irrigation systems;\n(t) laying down of public rights of way diversions, signage and information boards and extinguishment of existing public rights of way;\n(u) works to alter, maintain and repair streets and access roads, including relocation, removal or provision of street signage and furniture in, under or above a street and works to facilitate traffic management;\n(v) alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and road widening and to remove impediments (including vegetation) to such access;\n(w) install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures;\n(x) remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and\n(y) restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development.\n1/18, 3/14, 3/15, 3/16, 3/17\nWork No. 5, Work No. 6, Work No. 7 and Site Wide Works\n(a) fencing, gates, boundary treatment and other means of enclosure;\n(b) provision of security and monitoring measures such as CCTV columns, lighting columns and lighting, a fence detection system, cameras, weather stations, and communication infrastructure;\n(c) laying of electrical cables, including but not limited to electrical cables connecting Work No. 1, Work No. 2 and Work No. 3, including works to allow electrical cables crossings of non-navigable rivers, other watercourses and drains, permissive paths, public rights of way and other highways;\n(d) works to allow installation of bridge crossings over non-navigable rivers and other watercourses and drains;\n(e) laying down of internal access tracks (including fire access tracks), improvement of existing tracks, ramps, means of access, and roads, including construction signage and information boards;\n(f) provision of water tanks and pipework connection to hydrants located at inverter stations where BESS installed;\n(g) equipment and materials storage during construction and decommissioning phases;\n(h) creation of accesses from the highway;\n(i) creation of visibility splays;\n(j) upgrading and repairing of existing accesses;\n(k) highways improvements;\n(l) compound areas including hardstanding, turning and loading areas, car parking, offices/welfare facilities, storage areas, waste skip areas, solar PV panel testing area, bunded area for storage of fuels and hydrocarbons, security fencing and hoarding;\n(m) an internal haulage road comprising temporary permeable ground protection mats including passing bays, means of access, and signage;\n(n) site preparation works and site clearance, including vegetation removal;\n(o) earthworks;\n(p) remediation of contamination;\n(q) alteration to locations of services and utilities infrastructure;\n(r) works for the benefit or protection of land affected by the authorised development;\n(s) landscaping and biodiversity mitigation and enhancement measures including planting to the extent not undertaken under Work No. 8;\n(t) sustainable drainage system ponds, depression storage, runoff outfalls, general drainage and irrigation infrastructure, including bunds, embankments, trenching, and swales, systems and improvements, maintenance or extensions to existing drainage and irrigation systems;\n(u) laying down of public rights of way diversions, signage and information boards and extinguishment of existing public rights of way;\n(v) works to alter, maintain and repair streets and access roads, including relocation, removal or provision of street signage and furniture in, under or above a street and works to facilitate traffic management;\n(w) alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and road widening and to remove impediments (including vegetation) to such access;\n(x) install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures;\n(y) remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and\n(z) restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development.\n1/6, 1/13, 1/15\nWork No. 5, Work No. 6, Work No. 8 and Site Wide Works\n(a) fencing, gates, boundary treatment and other means of enclosure;\n(b) provision of security and monitoring measures such as CCTV columns, lighting columns and lighting, a fence detection system, cameras, weather stations, and communication infrastructure;\n(c) laying of electrical cables, including but not limited to electrical cables connecting Work No. 1, Work No. 2 and Work No. 3, including works to allow electrical cables crossings of non-navigable rivers, other watercourses and drains, permissive paths, public rights of way and other highways;\n(d) works to allow installation of bridge crossings over non-navigable rivers and other watercourses and drains;\n(e) laying down of internal access tracks (including fire access tracks), improvement of existing tracks, ramps, means of access, and roads, including construction signage and information boards;\n(f) provision of water tanks and pipework connection to hydrants located at inverter stations where BESS installed;\n(g) equipment and materials storage during construction and decommissioning phases;\n(h) creation of accesses from the highway;\n(i) creation of visibility splays;\n(j) upgrading and repairing of existing accesses;\n(k) highways improvements;\n(l) landscape and biodiversity enhancement measures, including habitat creation and management and seating;\n(m) mitigation and biodiversity enhancement planting;\n(n) landscape reinforcement works;\n(o) works to allow installation of bridge crossings over non-navigable rivers and other watercourses and drains;\n(p) works to alter, maintain, repair or replace existing crossing structures over non-navigable rivers and other watercourses and drains;\n(q) site preparation works and site clearance, including vegetation removal;\n(r) earthworks;\n(s) remediation of contamination;\n(t) alteration to locations of services and utilities infrastructure;\n(u) works for the benefit or protection of land affected by the authorised development;\n(v) landscaping and biodiversity mitigation and enhancement measures including planting to the extent not undertaken under Work No. 8;\n(w) sustainable drainage system ponds, depression storage, runoff outfalls, general drainage and irrigation infrastructure, including bunds, embankments, trenching, and swales, systems and improvements, maintenance or extensions to existing drainage and irrigation systems;\n(x) laying down of public rights of way diversions, signage and information boards and extinguishment of existing public rights of way;\n(y) works to alter, maintain and repair streets and access roads, including relocation, removal or provision of street signage and furniture in, under or above a street and works to facilitate traffic management;\n(z) alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and road widening and to remove impediments (including vegetation) to such access;\n(aa) install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures;\n(bb) remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and\n(cc) restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development.\n2/13, 3/7, 3/9, 3/11, 4/9\nWork No. 5, Work No. 7, Work No. 8 and Site Wide Works\n(a) fencing, gates, boundary treatment and other means of enclosure;\n(b) provision of security and monitoring measures such as CCTV columns, lighting columns and lighting, a fence detection system, cameras, weather stations, and communication infrastructure;\n(c) laying of electrical cables, including but not limited to electrical cables connecting Work No. 1, Work No. 2 and Work No. 3, including works to allow electrical cables crossings of non-navigable rivers, other watercourses and drains, permissive paths, public rights of way and other highways;\n(d) works to allow installation of bridge crossings over non-navigable rivers and other watercourses and drains;\n(e) laying down of internal access tracks (including fire access tracks), improvement of existing tracks, ramps, means of access, and roads, including construction signage and information boards;\n(f) provision of water tanks and pipework connection to hydrants located at inverter stations where BESS installed;\n(g) equipment and materials storage during construction and decommissioning phases;\n(h) compound areas including hardstanding, turning and loading areas, car parking, offices/welfare facilities, storage areas, waste skip areas, solar PV panel testing area, bunded area for storage of fuels and hydrocarbons, security fencing and hoarding;\n(i) an internal haulage road comprising temporary permeable ground protection mats including passing bays, means of access, and signage;\n(j) landscape and biodiversity enhancement measures, including habitat creation and management and seating;\n(k) mitigation and biodiversity enhancement planting;\n(l) landscape reinforcement works;\n(m) works to allow installation of bridge crossings over non-navigable rivers and other watercourses and drains;\n(n) works to alter, maintain, repair or replace existing crossing structures over non-navigable rivers and other watercourses and drains;\n(o) site preparation works and site clearance, including vegetation removal;\n(p) earthworks;\n(q) remediation of contamination;\n(r) alteration to locations of services and utilities infrastructure;\n(s) works for the benefit or protection of land affected by the authorised development;\n(t) landscaping and biodiversity mitigation and enhancement measures including planting to the extent not undertaken under Work No. 8;\n(u) sustainable drainage system ponds, depression storage, runoff outfalls, general drainage and irrigation infrastructure, including bunds, embankments, trenching, and swales, systems and improvements, maintenance or extensions to existing drainage and irrigation systems;\n(v) laying down of public rights of way diversions, signage and information boards and extinguishment of existing public rights of way;\n(w) works to alter, maintain and repair streets and access roads, including relocation, removal or provision of street signage and furniture in, under or above a street and works to facilitate traffic management;\n(x) alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and road widening and to remove impediments (including vegetation) to such access;\n(y) install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures;\n(z) remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and\n(aa) restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development.\n2/11, 4/4\nWork No. 5, Work No. 6, Work No. 7, Work No. 8 and Site Wide Works\n(a) fencing, gates, boundary treatment and other means of enclosure;\n(b) provision of security and monitoring measures such as CCTV columns, lighting columns and lighting, a fence detection system, cameras, weather stations, and communication infrastructure;\n(c) laying of electrical cables, including but not limited to electrical cables connecting Work No. 1, Work No. 2 and Work No. 3, including works to allow electrical cables crossings of non-navigable rivers, other watercourses and drains, permissive paths, public rights of way and other highways;\n(d) works to allow installation of bridge crossings over non-navigable rivers and other watercourses and drains;\n(e) laying down of internal access tracks (including fire access tracks), improvement of existing tracks, ramps, means of access, and roads, including construction signage and information boards;\n(f) provision of water tanks and pipework connection to hydrants located at inverter stations where BESS installed;\n(g) equipment and materials storage during construction and decommissioning phases;\n(h) creation of accesses from the highway;\n(i) creation of visibility splays;\n(j) upgrading and repairing of existing accesses;\n(k) highways improvements;\n(l) compound areas including hardstanding, turning and loading areas, car parking, offices/welfare facilities, storage areas, waste skip areas, solar PV panel testing area, bunded area for storage of fuels and hydrocarbons, security fencing and hoarding;\n(m) an internal haulage road comprising temporary permeable ground protection mats including passing bays, means of access, and signage;\n(n) landscape and biodiversity enhancement measures, including habitat creation and management and seating;\n(o) mitigation and biodiversity enhancement planting;\n(p) landscape reinforcement works;\n(q) works to allow installation of bridge crossings over non-navigable rivers and other watercourses and drains;\n(r) works to alter, maintain, repair or replace existing crossing structures over non-navigable rivers and other watercourses and drains;\n(s) site preparation works and site clearance, including vegetation removal;\n(t) earthworks;\n(u) remediation of contamination;\n(v) alteration to locations of services and utilities infrastructure;\n(w) works for the benefit or protection of land affected by the authorised development;\n(x) landscaping and biodiversity mitigation and enhancement measures including planting to the extent not undertaken under Work No. 8;\n(y) sustainable drainage system ponds, depression storage, runoff outfalls, general drainage and irrigation infrastructure, including bunds, embankments, trenching, and swales, systems and improvements, maintenance or extensions to existing drainage and irrigation systems;\n(z) laying down of public rights of way diversions, signage and information boards and extinguishment of existing public rights of way;\n(aa) works to alter, maintain and repair streets and access roads, including relocation, removal or provision of street signage and furniture in, under or above a street and works to facilitate traffic management;\n(bb) alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and road widening and to remove impediments (including vegetation) to such access;\n(cc) install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures;\n(dd) remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and\n(ee) restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 10 in force at 13.11.2025, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2025/1175/schedule/10",
    "retrieved_at": "2026-10-28T21:09:52.508378+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}