# The Strategic Planning (Composition of Panels and Qualifying Expenditure) (Wales) Regulations 2016, Regulation 11: Validity of actions of panel


The validity of anything done by a panel is not affected by a failure by a panel or a constituent local planning authority to comply with any obligation or requirement imposed on them (as the case may be) by—
(a) regulations 3 and 4(2) (panel composition requirements);
(b) regulation 6 (duty to review composition requirements);
(c) regulation 7 (reporting requirements);
(d) regulation 8 (notification of failure to comply with reporting requirements);
(e) regulation 9(3) (powers in the event of failure to comply).

---
Source: https://www.legislation.gov.uk/wsi/2016/18/regulation/11 (the official version)
Page: https://openlegislation.uk/strategic-planning-composition-of-panels-and-qualifying-expenditure-wales-regulations-2016/regulation-11
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

