In a case where works are initiated by an authority and are done by the authority, an undertaker whose apparatus is moved by an authority at the request of the undertaker solely because of a change in the type of highway construction (not involving an alteration in the depth of cover to a depth less or, as the case may be, greater than the acceptable depth referred to in Appendix B to the Code) shall be liable to pay to the authority a sum equal to the whole of the allowable costs incurred by the authority in moving the apparatus:—