OpenLegislation

Part II DESCRIPTION OF PIPE-LINES

Original text. Later amendments are not shown.

(1)(2)(3)(4)
Route of pipe-linesNominal diameter in inchesDate brought into use
FromTo

Note

In this Schedule—

  • “Argyll Base Manifold” means the seabed manifold installed above the Argyll oilfield in 1974.

Argyll Base ManifoldArgyll Single Point Mooring101.6.75
Argyll Subsea Well 30/24—5Argyll Base Manifold626.8.82
Argyll Subsea Well 30/24—18Argyll Base Manifold625.12.82