# The Submarine Pipe-lines (Designated Owners) (No. 6) Order 1992

S.I. 1992/890 · made 20 March 1992

This Order designates the companies listed in Part I of the Schedule as owners of the pipe-lines described in Part II of the Schedule. The pipe-lines lie above and between the Beryl, Linnhe and Ness oilfields south-east of the Shetland Islands.

Made under: Petroleum and Submarine Pipe-lines Act 1975 (repealed 15/02/1999) (Section 33)

## Introductory text

PIPE-LINES
Made 20th March 1992
Coming into force 16th April 1992
The Secretary of State, in exercise of the powers conferred on him by section 33(3) of the Petroleum and Submarine Pipe-lines Act 1975 (hereinafter referred to as “the Act”) and of all other powers enabling him in that behalf, and after giving those persons affected an opportunity of being heard with respect to the matter, hereby makes the following Order:—

## 1 

This Order may be cited as the Submarine Pipe-lines (Designated Owners) (No. 6) Order 1992 and shall come into force on 16th April 1992.

## 2 

For the purposes of Part III of the Act, each person specified in Part I of the Schedule hereto is hereby designated as the owner of the pipe-lines described in Part II of the Schedule hereto.

## Signature

Colin Moynihan
Parliamentary Under Secretary of State,
Department of Energy
20th March 1992

## I designated owners

Amerada Hess Ltd., whose registered office is at 2 Stephen Street, London W1P 1PL.
BG North Sea Holdings Limited whose registered office is at Rivermill House, 152 Grosvenor Road, London SW1V 3JL.
Enterprise Oil plc, whose registered office is at Grand Buildings, Trafalgar Square, London WC2N 5EJ.
Mobil North Sea Ltd., whose principal place of business in the United Kingdom is at Mobil Court, 3 Clements Inn, London WC2A 2EB.
OMV (U.K.) Limited whose registered office is at 14 Ryder Street, London SW1Y 6QB.

## II description of pipe-lines

Route of pipe-lines (1)
From (2)
To (3)
Number of pipelines lying along route (4)
Nominal diameter of pipes in inches (5)
Date brought into use
Ness II Subsea Well 9/13b-45z
Beryl B Platform
1
6
29.9.89
Ness II Subsea Well 9/13b-49
Beryl B Platform
1
6
18.9.90
Linnhe Subsea Well 9/13c-40z
Beryl B Platform
1
6
25.10.89
Beryl B Platform
Ness II Subsea Structure
4
0.5
24.11.89
Beryl B Platform
Ness II Subsea Structure
2
0.375
24.11.89
Linnhe Subsea Well
Beryl B Platform
1
6
Not yet in use
Beryl B Platform
Linnhe Subsea Well 9/13c-44z
1
6
26.11.89
Beryl B Platform
Linnhe Gas Lift Manifold
1
6
12.2.90
Beryl B Platform
Linnhe Subsea Structure
4
0.5
20.12.89
Beryl B Platform
Linnhe Subsea Structure
2
0.375
20.12.89

## Explanatory note

(This note is not part of the Order)
This Order designates the companies listed in Part I of the Schedule as owners of the pipe-lines described in Part II of the Schedule. The pipe-lines lie above and between the Beryl, Linnhe and Ness oilfields south-east of the Shetland Islands.

---
Source: https://www.legislation.gov.uk/uksi/1992/890 (the official version)
Page: https://openlegislation.uk/submarine-pipe-lines-designated-owners-no-6-order-1992
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.