# The Submarine Pipe-lines (Designated Owners) (No. 9) Order 1988, Part II: description of pipe-lines


(1)
(2)
(3)
(4)
(5)
Route of Pipe-lines
From
To
Number of pipe-lines lying along route
Nominal diameter in inches
Date brought into use
Note
In this Schedule—
“Argyll Base Manifold” means the seabed manifold installed above the Argyll oilfield in 1974;
“New Argyll Manifold” means the seabed manifold installed above the Argyll oilfield in 1984.
Argyll Base Manifold
Duncan Manifold
1
11
28.12.84
Argyll Base Manifold
Argyll Floating Production Facility
1
11
1.3.85
Argyll Base Manifold
New Argyll Manifold
1
11
28.12.84
Argyll Base Manifold
New Argyll Manifold
1
5.57
27.2.85
Argyll Base Manifold
Argyll Subsea Well 30/24—5
1
2.87
24.7.85
Argyll Base Manifold
Argyll Subsea Well 30/24—16
1
2.87
24.7.85
Argyll Base Manifold
Argyll Subsea Well 30/24—18
1
2.87
24.7.85
Argyll Base Manifold
Argyll Subsea Well 30/24—25
1
2.87
24.7.85
Argyll Base Manifold
Argyll Subsea Well 30/24—28
1
2.87
24.7.85
Argyll Floating Production Facility
New Argyll Manifold
1
4.56
12.7.85
Argyll Subsea Well 30/24—9
Argyll Base Manifold
1
4
27.9.82
Argyll Subsea Well 30/24—16
Argyll Base Manifold
1
6.13
28.2.86
Argyll Subsea Well 30/24—25
Argyll Base Manifold
1
6.13
21.11.83
Argyll Subsea Well 30/24—28
Argyll Base Manifold
1
4
28.9.84
Argyll Subsea Well 30/24—31
Argyll Base Manifold
1
6
3.10.85
Duncan Manifold
Argyll Base Manifold
1
10.91
15.12.83
Duncan Manifold
Argyll Base Manifold
1
8.5
23.11.83
Duncan Manifold
Duncan Subsea Well 30/24—21
1
8
1.3.85
Duncan Manifold
Duncan Subsea Well 30/24—29
1
8
27.2.85
Duncan Subsea Well 30/24—15
Duncan Manifold
1
6.13
23.11.83
Duncan Subsea Well 30/24—17
Duncan Manifold
1
6.13
27.1.84
Duncan Subsea Well 30/24—19
Duncan Manifold
1
6.13
15.12.83
Duncan Subsea Well 30/24—30
Duncan Manifold
1
6
19.12.85
Innes Floating Production Facility
Innes Subsea Well 30/24—4
1
6
25.12.85
Innes Subsea Well 30/24—24
Argyll Base Manifold
1
8
30.1.85
Innes Subsea Well 30/24—32
Innes Subsea Well 30/24—24
1
6.13
21.11.85
New Argyll Manifold
Argyll Base Manifold
2
12.75
20.11.85
New Argyll Manifold
Argyll Base Manifold
1
6
24.11.84
New Argyll Manifold
Argyll Base Manifold
5
6
20.11.84
New Argyll Manifold
Argyll Base Manifold
1
6
13.2.85
New Argyll Manifold
Argyll Base Manifold
1
8
20.11.84
New Argyll Manifold
Argyll Base Manifold
5
2.87
12.7.85
New Argyll Manifold
Argyll Floating Production Facility
1
4.5
19.12.84
New Argyll Manifold
Argyll Floating Production Facility
2
4.5
4.12.84
New Argyll Manifold
Argyll Floating Production Facility
1
4.5
20.11.84
New Argyll Manifold
Argyll Floating Production Facility
2
4.5
3.12.84
New Argyll Manifold
Argyll Floating Production Facility
1
6.625
3.12.84
New Argyll Manifold
Argyll Floating Production Facility
1
6.625
4.12.84
New Argyll Manifold
Argyll Floating Production Facility
2
3
25.7.87
New Argyll Manifold
Argyll Subsea Well 30/24—31
1
6.13
9.9.86
New Argyll Manifold
Duncan Subsea Well 30/24—17
1
1.5
10.8.87

---
Source: https://www.legislation.gov.uk/uksi/1988/912/schedule/part/II (the official version)