Appendix THE SCHEDULE TO THE SCHEME PLAN AND SPECIFICATIONS OF THE NEW WEAR BRIDGE

Original text. Later amendments are not shown.

The location and general design of the Bridge are shown on the plans numbered 8132/107 and 8132/705 marked The Sunderland City Council (Sunderland Strategic Transport Corridor – Temporary Works New Wear Bridge) Scheme 2009.

  • POINTS OF COMMENCEMENT AND TERMINATION

    From a point on the South Bank of the River Wear 155 metres east of the centre of the roundabout junction between A1231 Wessington Way and Castletown Way located on the north bank.

    To a point on the North Bank of the River Wear 30 metres east of the centre of the roundabout junction between A1231 Wessington Way and Castletown Way.

  • SPAN

    Multiple spans of between 9 metres and 32 metres with 336 metres overall.

  • HEADWAY

    Not less than 12.9 metres above the mean high water spring tide level (MHWS) of 2.5 metres AOD.

  • WATERWAY

    A minimum clear navigable waterway of 27 metres.

  • OVERALL DIMENSIONS

    The Bridge will be in 2 parts. The first will be a series of trestles of 18 metres width at spans of 18 metres to 32 metres over which will be launched the permanent bridge deck of 25.2 metres width overall. The second part is a bridge of 152 metres length from the south bank consisting of spans of 9 metres to 12 metres with a steel deck of 12 metres width situated 10 metres downstream of the permanent location.