# The Sunnica Energy Farm Order 2024, Schedule 10: DOCUMENTS AND PLANS TO BE CERTIFIED

Extent: E+W

(1)
Document name
(2)
Document reference
(3)
Revision number
(4)
Date
access and rights of way plans
2.3
7
27/11/2025
arboricultural impact assessment
8.46
2
03/03/2023
book of reference
4.3
10
27/11/2025
Campus plan
8.88
1
21/03/2023
crash site exclusion area plan
8.89
0
03/02/2023
Deed of Obligation
8.123
0
24/03/2023
design principles
8.87
0
30/01/2023
detailed archaeology mitigation strategy
8.79
1
24/03/2023
drainage technical note
8.83
1
24/03/2023
environmental statement
environmental statement 6.1 (excluding chapters 0, 3 and 16), 6.2 (excluding appendix 7H, 8M, 9C, 10I, 13C, 16C, 16D, 16E and 16F), 6.3 (excluding figures 3-1, 3-2, 3-17a-e, 3-20, 3-25a-d, 3-28a, 3-28b, 3-29, 3-30a, 3-30b, 3-31, 3-32, 9-1, 10-11a-f, 10-12) and 6.4
0
18/11/2021
environmental statement 6.1 (chapter 0)
1
30/08/2022
environmental statement 6.1 (chapter 3)
2
11/11/2022
environmental statement 6.1 (chapter 16)
1
11/11/2022
environmental statement 6.2 (appendix 7H)
1
13/07/2022
environmental statement 6.2 (appendix 8M)
2
13/01/2023
environmental statement 6.3 (figure 3-17a-e)
1
03/03/2023
environmental statement 6.3 (figures 3-1, 3-2)
2
24/03/2023
environmental statement 6.3 (figures 3-28a, 3-28b, 3-30a, 3-30b)
1
14/09/2022
environmental statement 6.3 (figures 3-31, 3-32)
0
30/08/2022
environmental statement 6.3 (figures 3-20, 3-25a-d, 3-29)
1
30/08/2022
environmental statement 6.3 (figure 9-1)
1
21/01/2022
environmental statement 6.3 (figures 10-11a-f, 10-12)
1
19/10/2022
flood risk assessment
Appendix 9C contained in volume 2 of the environmental statement (document reference 6.2) – Part 1
2
24/03/2023
Appendix 9C contained in volume 2 of the environmental statement (document reference 6.2) – Parts 2-4
1
21/01/2022
Appendix 9C flood risk assessment addendum – Part 1
1
24/03/2023
drainage technical note
1
24/03/2023
FRA clarification document in light of proposed Scheme changes
2
24/03/2023
framework construction environmental management plan
Appendix 16C contained in volume 2 of the environmental statement (document reference 6.2)
8
13/09/2023
framework construction traffic management plan and travel plan
Appendix 13C contained in volume 2 of the environmental statement (document reference 6.2)
5
03/03/2023
unplanned atmospheric emissions from battery energy storage systems
Appendix 16D contained in volume 2 of the environmental statement (document reference 6.2)
1
11/11/2022
framework decommissioning environmental management plan
Appendix 16E contained in volume 2 of the environmental statement (document reference 6.2)
4
13/03/2023
framework operational environmental management plan
Appendix 16F contained in volume 2 of the environmental statement (document reference 6.2)
5
24/03/2023
land and Crown land plans – sheets 1–19 and 21–22
2.1
6
30/01/2023
land and Crown land plans – sheet 20
2.1
7
27/11/2025
outline battery fire safety management plan
7.6
4
24/03/2023
outline landscape and ecology management plan
Appendix 10I contained in volume 2 of the environmental statement (document reference 6.2)
5
13/09/2023
outline skills, supply chain and employment plan
7.7
4
24/03/2022
potential expanded crash site exclusion area plan
8.90
0
03/02/2023
restoration overlap plan
2.9
0
18/11/2021
traffic regulation measures plans – temporary measures
2.4
3
30/01/2023
traffic regulation measures plans – temporary road closures
2.4
4
27/11/2025
tree preservation order trees location plans
8.48
2
24/03/2023
works plans
2.2
6
27/11/2025

---
Source: https://www.legislation.gov.uk/uksi/2024/802/schedule/10 (the official version)