{
  "url": "https://openlegislation.uk/sunnica-energy-farm-order-2024/schedule-12/paragraph-98",
  "json_url": "https://openlegislation.uk/sunnica-energy-farm-order-2024/schedule-12/paragraph-98.json",
  "legislation": "uksi/2024/802",
  "legislation_title": "The Sunnica Energy Farm Order 2024",
  "legislation_url": "https://openlegislation.uk/sunnica-energy-farm-order-2024",
  "path": "schedule/12/paragraph/98",
  "kind": "paragraph",
  "number": "98",
  "heading": "Interpretation",
  "text": "(1) Where the terms defined in article 2 (interpretation) of this Order are inconsistent with sub-paragraph (2) below the latter prevail.\n(2) In this Schedule—\n“administration fee” means the fee payable pursuant to the provisions of this Part of this Schedule that represent the internal costs of National Highways in administering the implementation of the specified work and charged as a flat fee based on the value of the specified works only;\n“as built information” means one digital copy of the following information—\n(a) as constructed drawings in both PDF and Auto CAD DWG formats for anything designed by the undertaker; in compliance with GG184 (Specification for the use of Computer Aided Design) or any successor document;\n(b) list of suppliers and materials used and test results and (where in the opinion of National Highways, following due diligence and assessment while acting reasonably, the carrying out of a specified work may have a materially adverse effect on any part of the highways drainage system maintained by National Highways) CCTV surveys;\n(c) product data sheets and technical specifications for all materials used;\n(d) as constructed information for any utilities discovered or moved during the works;\n(e) method statements for the works carried out;\n(f) in relation to road lighting, signs, and traffic signals any information required by Series 1300 and 1400 of the Specification for Highway Works or any replacement or modification of it;\n(g) organisation and methods manuals for all products used;\n(h) as constructed programme;\n(i) test results and records as required by the detailed design information and during construction phase of the project;\n(j) the health and safety file to include the geotechnical feedback report required under CD622; and\n(k) other such information as is required by National Highways to be used to update all relevant databases and to ensure compliance with National Highway’s Asset Data Management Manual as is in operation at the relevant time,\nprovided that the items referred to in sub-paragraphs (c) and (g) above will only be required to be submitted if the relevant specified work would require any of the works of a description referred to in article 13(1)(a) to (d) (agreements with street authorities) of this Order to be carried out in relation to any highway for which National Highways is the highways authority;\n“condition survey” means a survey of the condition of National Highways structures and assets (including, but not limited to pavements, lighting, soft estates, signals, barriers, drainage and cabling) within the Order limits that in the reasonable opinion of National Highways may be affected by a specified work, and further to include, where the undertaker, following due diligence and assessment, identifies a specified part of the highways drainage system maintained by National Highways that National Highways reasonably considers may be materially and adversely affected by a specified work. A CCTV survey of specified drains will only form part of a condition survey where the authority, following due diligence and assessment, identifies a specified part of the highways drainage system maintained by National Highways that National Highways reasonably considers may be materially and adversely affected by a specified work;\n“contractor” means any contractor or sub-contractor appointed by the undertaker to carry out a specified work;\n“detailed design information” means drawings specifications and calculations as appropriate for the following—\n(a) regime of California Bearing Ratio testing;\n(b) earthworks including supporting geotechnical assessments required by CD622 (Managing geotechnical risk) of the DMRB or any successor document and any required strengthened earthworks appraisal form certification;\n(c) proposed departures from DMRB standards;\n(d) utilities diversions;\n(e) topographical survey;\n(f) health and safety information including any asbestos survey required by GG105 (asbestos management) or any successor document; and\n(g) other such information that may be reasonably required by National Highways to inform the detailed design of a specified work.\n“DMRB” means the Design Manual for Roads and Bridges or any replacement, revision or modification of it;\n“the framework contract” means the contract between National Highways and the highway operations and maintenance contractor for the maintenance and operation of parts of the trunk road which are within the Order limits or any successor or replacement contract that may be current at the relevant time;\n“the highway operations and maintenance contractor” means the contractor appointed by National Highways under the framework contract;\n“highways structure” means structures or installations within the scope of the DMRB and that are situated under, over or adjacent to a motorway or other trunk road;\n“initial deposit” means the sum calculated by National Highways (acting reasonably) payable to National Highways to cover all initial stages of work until such time as the cost of the specified work and the NH costs payable under paragraph 102 of this Part can be estimated;\n“nominated persons” means the undertaker’s representatives or the contractor’s representatives on site during the carrying out of a specified work as notified to National Highways from time to time;\n“programme of works” means a document setting out the sequence and timetabling of a specified work;\n“road space booking” means road space bookings in accordance with National Highways’ Asset Management Operational Requirements (AMOR) including Network Occupancy Management System (NOMS) used to manage road space bookings and network occupancy;\n“specified work” means so much of any work authorised by this Order, including any maintenance of that work, as is in or under the trunk road and in particular means the crossing under the A11 north of junction 38 as shown in the indicative location on sheet 10 of the work plans; and\n“trunk road” for the purpose of these protective provisions means any highway for which National Highways is the highway authority.",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 12 para. 98 in force at 3.8.2024, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2024/802/schedule/12/paragraph/98",
    "retrieved_at": "2026-10-28T21:27:58.279529+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}