The following provisions do not apply in so far as they relate to the construction of any numbered work or the carrying out of any operation required for the purpose of, or in connection with, the construction, operation, maintenance or decommissioning of the authorised development and so far as the provisions still in force are incompatible with the powers contained within this Order—
(a) Bedford Level Act 1663;
(b) Hundred Foot River and Ouse: Bedford Level Act 1756;
(c) Bedford Level: Drainage Act 1757;
(d) Isle of Ely, Suffolk, Norfolk Drainage Act 1759;
(e) Bedford Level Act 1789;
(f) Bedford Level (Cam, Ouse and Mildenhall Rivers) Drainage Act 1800;
(g) Bedford Level (Mildenhall River) Drainage Act 1807;
(h) Isle of Ely (Mildenhall River) Drainage Act 1807;
(i) Bedford Level Drainage and Ouse Navigation Act 1819;
(j) Fen Drainage Act 1823;
(k) Bedford Level Drainage Act 1827;
(l) Norfolk Drainage Act 1834;
(m) Burwell Drainage and Lodes Navigation Act 1841;
(n) Fen Lands Drainage Act 1843
(o) South Level and Eau Brink Act 1893;
(p) Canal Tolls and Charges (Burwell Fen &c.) Order Confirmation Act 1896;
(q) River Great Ouse (Flood Protection) Act 1949;
(r) Ely Ouse-Essex Water Act 1968;
(s) Anglian Water Authority Act 1977; and
(t) Swaffham Internal Drainage Board Byelaws.

---
Source: https://www.legislation.gov.uk/uksi/2024/802/schedule/3/paragraph/1 (the official version)
Page: https://openlegislation.uk/sunnica-energy-farm-order-2024/schedule-3/paragraph-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.