# The Sustainable Drainage (Approval and Adoption Procedure) (Wales) Regulations 2018, Regulation 12: Registration and designation following voluntary adoption


Within 4 weeks beginning on the first working day after giving a notification under paragraph 24(2) of Schedule 3, an approving body must arrange for—
(a) the lead local flood authority to include the drainage system in the register maintained under section 21 of the Act, and
(b) a designating authority to make a provisional designation under paragraph 7 of Schedule 1 of any part of the drainage system (whether an adopted part or not) which is eligible for designation and is not owned by the approving body.

---