# The Sutton Harbour Revision Order 1988, Article 4: Power to construct works


(1) Subject to the provisions of this Order, the Company may when they have acquired the necessary lands or obtained sufficient interests therein and within the limits of deviation construct and maintain the following works in the harbour, that is to say:—
A quay of solid or open construction in steel, timber or concrete, including a strengthening or reconstruction of Bayly’s Wharf, commencing by a junction with the north side of the East Pier at a point 22 metres or thereabouts measured from its western extremity, thence proceeding first in a northerly and thereafter in an easterly direction along the face of Bayly’s Wharf and terminating at the eastern extremity of that Wharf.
(2) Subject to the provisions of this Order, the Company may within the limits of deviation for the works extend, enlarge, alter, replace or relay the same.
(3) The Company may by means of the works enclose and reclaim from the foreshore and bed of the sea and may hold and use as part of the undertaking so much of the foreshore and bed of the sea as is situate within the limits of deviation and is required for or in connection with the works.
(4) The works shall for all purposes form part of the undertaking.

---
Source: https://www.legislation.gov.uk/uksi/1988/1928/article/4 (the official version)
Page: https://openlegislation.uk/sutton-harbour-revision-order-1988/article-4
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.