| 20th December 2002 | Tidal Stream Technology Development | Lunar Energy Ltd |
| 14th February 2003 | Pelamis Full Scale Demonstration | Ocean Power Delivery Limited |
| 19th August 2003 | Drying in the Woodfuel Supply Chain | Econergy Limited |
| 1st December 2003 | Metering and Monitoring of Domestic Embedded Generation | BEAMA Power Limited |
| 12th May 2004 | An Automotive Class MEA | Johnson Matthey PLC |
| 16th July 2004 | Cost Effective Improvements in DFIG Performance for Offshore Applications under Fault Conditions | Econnect Limited |
| 19th July 2004 | BWEC Feasibility Study | WS Atkins Consultants Limited |
| 14th October 2004 | Improved performance of wind turbines using fibre optic structural monitoring | Insensys Ltd |
| 11th November 2004 | 100kWe Biomass fuelled indirect fired Micro Turbine | Talbotts Heating Limited |
| 1st December 2004 | Development of a Design Tool for Tidal Current Turbines | Garrad Hassan and Partners Limited |
| 15th December 2004 | Finite Element Modelling of Offshore Wind Turbine Support Structures | Garrad Hassan & Partners Limited |
| 21st December 2004 | Biofuel production from plant biomass derived sugars | TMO Renewables Limited |
| 17th January 2005 | Grid compliant AC connection of offshore windfarms using a STATCOM | National Grid Transco Ltd |
| 19th January 2005 | Power on Plastic | Kodak Limited |
| 28th January 2005 | Control of Wind Farm Grids with an HVDC Link | AREVA T&D UK Ltd |
| 1st February 2005 | Industrial research into multi fuel biomass boiler plant | Ashwell Engineering Services Ltd |
| 13th June 2005 | Low Cost 100x PV Concentrator | Whitfield Solar Ltd |
| 13th June 2005 | Low Cost 100x Pv Concentrator | NaREC (New and Renewable Energy Centre Limited) |
| 17th June 2005 | Advanced Automotive and Motive Power Fuel Cell Systems and Component Development | Intelligent Energy Limited |
| 9th November 2005 | High Added Value Modules for BIPV | NaREC (New and Renewable Energy Centre Limited) |
| 9th January 2006 | Pelamis WEC Cost Reduction & Performance Enhancement Programme | Ocean Power Delivery Limited |
| 2nd February 2006 | Fault Level Monitor Stage Two | EA Technology Limited |
| 6th December 2006 | Technology Support for 2nd Generation BIGCC Plant | Originally Alstom Ltd, now Siemens Industrial Turbomachinery Ltd |
| 19th January 2007 | Deepwater Offshore Windfarm Demonstrator Project | Talisman Energy UK Ltd |
| 14th March 2007 | Low Cost 100x Pv Concentrator | University of Warwick |