Schedule 2 PROVISIONS OF THE THIRD SCHEDULE APPLIED

Original text. Later amendments are not shown.

(1)(2)
Provisions AppliedModifications
Section 2 (Permissible limits of deviation)—
Section 4 (General power to construct subsidiary works)

The words “and to any other provisions of the special Act limiting the powers of the undertakers to abstract water” shall be omitted and for the words “any land for the time being held by them in connection with their water undertaking” there shall be substituted the words “the land described in the special Act”.

Section 6 (Penalty for obstructing construction of works)—
Part IV (Minerals Underlying Waterworks)

In section 12 for the words “after this section is incorporated with their enactments” there shall be substituted the words “under the special Act”; for the words “all existing pipes or other conduits for the collection, passage or distribution of water and underground works belonging to them” there shall be substituted the words “all such pipes or other conduits or underground works” and the words “for the time being belonging to them” shall be omitted.

Section 19 (Power to lay mains)—
Section 94 (Copies of special Act to be kept by undertakers in their office, and deposited with certain officers)

In subsection (1)f1 for the words from “metropolitan district” to the end of the subsection there shall be substituted the words “and non-metropolitan district affected by the special Act.”.

Annotations

Footnotes

f1

Section 94(1) was amended by S.I. 1986/1.