# The Thames Water Utilities Limited (Thames Tideway Tunnel) (Amendment) Order 2017, Schedule: Amendments to the 2014 Order


Provision to be amended
Text to be omitted
Text to be substituted
Article 6(1), in the words before sub-paragraph (a)
“16b and 20”
“16b, 20 and the tunnel comprised in Work No.27(v)”
Schedule 1, Part 1, under the heading “BECKTON SEWAGE TREATMENT WORKS”, “Work No.27”, paragraph (iii)
“9 metres and which has a depth (to invert level) of 32 metres”
“up to 10.5 metres and which has a depth (to invert level) of up to 24 metres”
Schedule 1, Part 1, under the heading “BECKTON SEWAGE TREATMENT WORKS”, “Work No.27”, paragraph (iv)
“7 metres (which extends 3 metres above the proposed ground level) and which has a depth (to invert level) of 31 metres”
“up to 7 metres (which extends 3 metres above the proposed ground level) and which has a depth (to invert level) of up to 23 metres”
Schedule 2, Part 1 (works plans), Table 1, column 3 (drawing number)
“DCO-WP-000- ZZZZZ-010057 – rev 1”
“DCO-WP-000-ZZZZZ-010057 – rev 2”
“DCO-WP-000-ZZZZZ-010058”
“DCO-WP-000-ZZZZZ-0100058 – rev 1”
“DCO-WP-000-ZZZZ-0100059 – rev 1”
“DCO-WP-000-ZZZZZ-010059 – rev 2”
“DCO-WP-000-ZZZZZ-010060 – rev 1”
“DCO-WP-000-ZZZZZ-010060 – rev 2”
Schedule 2, Part 4 (approved plans), Table 1, column 3 (drawing number)
“DCO-PP-27X- BESTW- 280003 – rev 1”
“DCO-PP-27X-BESTW- 280003 – rev 2”

---
Source: https://www.legislation.gov.uk/uksi/2017/659/schedule (the official version)
Page: https://openlegislation.uk/thames-water-utilities-limited-thames-tideway-tunnel-amendment-order-2017/schedule
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.