# The Thames Water Utilities Limited (Thames Tideway Tunnel) (Amendment) Order 2018, Article 3: Certification of substituted plan


(1) The undertaker must, as soon as practicable after the making of this Order, submit copies of the substituted plan referred to in the third column of the table in the Schedule to the Secretary of State for certification in accordance with paragraph (2).
(2) The Secretary of State may certify copies submitted under paragraph (1) as true copies of the substituted plan.
(3) A plan so certified by the Secretary of State is admissible in any proceedings as evidence of the contents of the document of which it is a copy.
(4) In paragraph (1), “undertaker” has the same meaning as in article 2(1) of the 2014 Order.

---
Source: https://www.legislation.gov.uk/uksi/2018/1262/article/3 (the official version)
Page: https://openlegislation.uk/thames-water-utilities-limited-thames-tideway-tunnel-amendment-order-2018/article-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

