# The Thames Water Utilities Limited (Thames Tideway Tunnel) (Amendment) Order 2020, Article 3: Certification of substituted plans, etc.


(1) The undertaker must, as soon as practicable after the making of this Order, submit copies of—
(a) the addendum to the book of reference dated January 2020, and
(b) the substituted plans referred to in the third column of the table in the Schedule
to the Secretary of State for certification in accordance with paragraph (2).
(2) The Secretary of State may certify copies submitted under paragraph (1) as true copies of the plan or document.
(3) A plan or document so certified by the Secretary of State is admissible in any proceedings as evidence of the contents of the document of which it is a copy.
(4) In paragraph (1), “undertaker” has the same meaning as in article 2(1) of the 2014 Order.

---
Source: https://www.legislation.gov.uk/uksi/2020/268/article/3 (the official version)