# The Thames Water Utilities Limited (Thames Tideway Tunnel) (Correction) Order 2015, Introduction: Introductory text

Extent: E+W+S

Infrastructure Planning
Made 12th March 2015
Coming into force 17th March 2015
The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 contains correctable errors, as defined in paragraph (1)3 of Schedule 4 to the Planning Act 2008.
Before the end of the relevant period, the Secretary of State received a written request from Thames Water Utilities Limited to correct the correctable errors.
In accordance with paragraph 1(7) of Schedule 4 to the Act, the Secretary of State has informed the relevant local planning authorities that the request has been received.
The Secretary of State makes this Order in exercise of the power conferred by paragraph 1(4) of Schedule 4 to the Planning Act 2008.

---
Source: https://www.legislation.gov.uk/uksi/2015/723/introduction (the official version)
Page: https://openlegislation.uk/thames-water-utilities-limited-thames-tideway-tunnel-correction-order-2015/introduction
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.