  "url": "https://openlegislation.uk/thames-water-utilities-limited-thames-tideway-tunnel-order-2014/schedule-11",
  "json_url": "https://openlegislation.uk/thames-water-utilities-limited-thames-tideway-tunnel-order-2014/schedule-11.json",
  "legislation": "uksi/2014/2384",
  "legislation_title": "The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014",
  "legislation_url": "https://openlegislation.uk/thames-water-utilities-limited-thames-tideway-tunnel-order-2014",
  "path": "schedule/11",
  "kind": "schedule",
  "number": "11",
  "heading": "PROTECTIVE WORKS",
  "text": "Part of Work No. 5(c)— works to protect the existing river wall.\nWork No. 5(d)— works to strengthen or support the existing river wall landward of the Putney Embankment Foreshore temporary slipway.\nWork No. 6(b)(iii)— strengthening and alteration of existing river wall to the south of Whiffin Wharf, and strengthening or replacing the existing river wall to the south of Hurlingham Wharf and Carnwath Road Industrial Estate.\nWork No. 8(b)(ii)— strengthening and alteration of the existing river wall to the south of Bell Lane Creek and works to protect and or strengthen the river wall on the north side of Bell Lane Creek.\nWork No. 11(c)(iii)— replacement or other works to protect or strengthen the existing flood defence on the western boundary of the site.\nPart of Work No. 12(c)— works to protect the existing river wall.\nPart of Work No. 13(b)(iii)— works to protect or strengthen the existing river wall.\nPart of Work No. 14(c)(ii)— works to protect or strengthen the existing river wall to east and west of Work No. 14(c)(i) and the existing Middle Wharf jetty.\nWork No. 15(c)(ii)— works to protect and strengthen the existing slipway and existing river wall.\nPart of Work No. 16(c)— works to protect the existing river wall and adjoining structures.\nPart of Work No. 17(b)— works to protect the existing river wall and adjoining structures.\nPart of Work No. 18— works to replace or protect the boundary wall on the west side of the existing facilities building.\nPart of Work No. 19(b)— works to protect or strengthen the river wall and adjoining structures at the western end of the site.\nPart of Work No. 19(b)(i)— works to replace, protect or strengthen the existing river wall to the west of Fountain Green Square.\nPart of Work No. 23(b)— works to protect or strengthen the existing Docklands Light Railway viaduct.\nPart of Work No. 23(b)(i)— works to protect or strengthen the existing river wall.\nPart of Work No. 24(b)— works to protect or strengthen the existing river wall.\nWork No. 24(b)(v)— works to protect or strengthen the existing river wall.",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 11 in force at 24.9.2014, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2014/2384/schedule/11",
    "retrieved_at": "2026-10-29T00:03:40.087761+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}