  "url": "https://openlegislation.uk/thames-water-utilities-limited-thames-tideway-tunnel-order-2014/schedule-14",
  "json_url": "https://openlegislation.uk/thames-water-utilities-limited-thames-tideway-tunnel-order-2014/schedule-14.json",
  "legislation": "uksi/2014/2384",
  "legislation_title": "The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014",
  "legislation_url": "https://openlegislation.uk/thames-water-utilities-limited-thames-tideway-tunnel-order-2014",
  "path": "schedule/14",
  "kind": "schedule",
  "number": "14",
  "heading": "LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN",
  "text": "Borough\nNumber of land shown on land plan\nPurpose of which temporary possession may be taken\nRelevant site or part of the authorised project\nLondon Borough of Ealing\n1, 2, 3, 5, 8, 9, 10, 18, 19, 20, 22, 23, 24, 26, 28, 31, 31a, 32, 32a, 36\nAreas required for shaft construction; CSO interception works construction; ventilation equipment and structure construction; tunnel secondary lining; utility supplies, cranage, enclosures, concrete batching plant, workshops and stores, office, parking and welfare facilities, and vehicle and pedestrian circulation areas. Highway works to Canham Road, Stanley Gardens and Warple Way (part of Work No. 2b). Purposes ancillary or incidental to the above purposes.\nActon Storm Tanks\nLondon Borough of Hammersmith & Fulham\n101, 104, 105, 106, 107, 108, 109, 111, 112, 114, 115, 116, 117, 118\nAreas required for CSO drop shaft construction; Hammersmith connection tunnel construction; CSO interception works construction; utility supplies, cranage, enclosures, concrete batching plant, workshop and stores, office, parking and welfare facilities, and vehicle and pedestrian circulation areas. Highway works to Chancellor’s Road and Distillery Road. Utility works in Chancellor’s Road (part of Work No. 3c). Purposes ancillary or incidental to the above purposes.\nHammersmith Pumping Station\nLondon Borough of Richmond Upon Thames\n65, 65a, 65b, 66, 67, 68, 70, 72, 73, 76, 79, 85\nAreas required for CSO drop shaft construction; West Putney connection tunnel construction; CSO interception works construction; access road, utility supplies, cranage, enclosures, concrete batching plant, workshop and stores, office, parking and welfare facilities, and vehicle and pedestrian circulation areas. Highway works at junction of Queen Elizabeth Walk and private access road (part of Work No. 4c). Purposes ancillary or incidental to the above purposes.\nBarn Elms\nLondon Borough of Wandsworth\n8, 9, 9a, 10, 11, 12, 12a, 12b, 12c, 13, 13a, 14, 14a, 15, 16, 20, 23, 25, 25a, 25b, 25c, 30, 32, 33, 34, 35, 36, 39, 40, 42, 44, 45, 46, 46a, 47, 47a, 48, 50\nAreas required for CSO drop shaft construction; Putney Bridge connection tunnel construction; CSO interception works construction; secondary lining; utility supplies, working area in the foreshore, temporary campshed, cranage, enclosures, concrete batching plant, workshop and stores, office, parking and welfare facilities, vehicle and pedestrian circulation areas, and relocation of houseboat. Separate area required for temporary slipway construction, use and removal, and works to existing river wall (part of Work No. 5d). Highway and utility works to Lower Richmond Road and the Embankment (part of Work No. 5c). Purposes ancillary or incidental to the above purposes.\nPutney Embankment Foreshore\nLondon Borough of Hammersmith & Fulham\n124, 125, 127, 127a, 129, 130, 131, 132, 137, 138, 139, 140, 141, 141a, 142, 143, 144, 145, 146, 147, 147a, 147b, 148, 149, 150, 151, 152, 153, 154, 155, 156, 157, 158, 159, 160, 161, 162, 163, 173, 174, 176, 177\nAreas required for shaft construction; main tunnel construction; ventilation equipment and structure construction; tunnel secondary lining (part of Work No. 1b) and strengthening or replacing river walls including utility supplies, temporary jetty or campshed, cranage, enclosures, concrete batching plant, acoustic enclosure, other enclosures, workshop and stores, office, parking and welfare facilities, and vehicle and pedestrian circulation areas. Highway works to Carnwath Road and at the junction of Carnwath Road and Wandsworth Bridge Road. Utility works to Carnwath Road (part of Work No. 6b). Purposes ancillary or incidental to the above purposes.\nCarnwath Road Riverside\nLondon Borough of Wandsworth\n75, 76, 77, 78, 79, 80, 81, 82, 84, 85, 86, 87, 88, 89, 91, 92, 95, 97, 99a, 100, 103, 104, 109, 110, 111, 117, 118, 119, 120, 121\nAreas required for CSO drop shaft construction; Frogmore connection tunnel construction; CSO interception works construction; strengthening and altering or replacing river walls, protection or relocation of sub-station including utility supplies, cranage, enclosures, concrete batching plant, temporary bridge, workshop and stores, office, parking and welfare facilities, utility supplies and vehicle and pedestrian circulation areas. Use of the Causeway (private road). Highway works to Dormay Street and at the junction of Dormay Street, the Causeway and Armoury Way. Utility works to the Causeway (part of Work No. 8c). Purposes ancillary or incidental to the above purposes.\nDormay Street\nLondon Borough of Wandsworth\n172, 173, 177, 179, 180\nAreas required for CSO drop shaft construction; CSO interception works construction; including utility supplies, cranage, enclosures, concrete batching plant, workshop and stores, office, parking and welfare facilities, and vehicle and pedestrian circulation areas. Highway and utility works to the junction of Buckhold Road and Neville Gill Close (part of Work No. 9b). Purposes ancillary or incidental to the above purposes.\nKing George’s Park\nLondon Borough of Wandsworth\n194, 196, 197, 198, 203, 204, 205, 206, 213, 214, 215, 216, 217, 218, 220, 222, 223\nAreas required for CSO drop shaft construction; Falconbrook connection tunnel construction; CSO interception works construction; including utility supplies, cranage, enclosures, concrete batching plant, workshop and stores, office, parking and welfare facilities, and vehicle and pedestrian circulation areas. Highway and utility works to York Road (part of Work No. 10c). Purposes ancillary or incidental to the above purposes.\nFalconbrook Pumping Station\nRoyal Borough of Kensington & Chelsea\n2, 3, 4, 9, 10, 11, 12, 13, 14, 15, 16, 18\nAreas required for CSO drop shaft construction; Lots Road connection tunnel construction; CSO interception works construction; including utility supplies, temporary campshed, cranage, enclosures, concrete batching plant, workshop and stores, office, parking and welfare facilities, and vehicle and pedestrian circulation areas. Highway works to Lots Road (part of Work No. 11c). Purposes ancillary or incidental to the above purposes.\nCremorne Wharf Depot\nRoyal Borough of Kensington & Chelsea\n27, 28, 29, 31, 33, 40, 41, 45, 46, 47\nAreas required for CSO drop shaft construction; Ranelagh connection tunnel construction; CSO interception works construction; Low Level Sewer connection works construction; including temporary campshed, working area in the foreshore, cranage, enclosures, concrete batching plant, workshop and stores, office, parking and welfare facilities, and vehicle and pedestrian circulation areas. Highway and utility works to Chelsea Embankment (part of Work No. 12c). Purposes ancillary or incidental to the above purposes.\nChelsea Embankment Foreshore\nLondon Borough of Wandsworth\n234, 237a, 237b, 241, 242, 243, 244, 245, 246, 247, 248, 249, 252, 253, 254, 255, 256, 257, 258, 264, 265, 267, 268, 273, 274, 275, 276, 277, 278, 279, 280, 281, 282, 283, 284, 285, 286, 287, 288, 289, 290, 291, 292, 293, 294, 295, 296\nAreas required for shaft construction; main tunnel construction in two directions; ventilation equipment and structure construction, river wall works including utility supplies, temporary jetty, cranage, noise enclosures, other enclosures, concrete batching plant, workshop and stores, office, parking and welfare facilities, and vehicle and pedestrian circulation areas. Highway and utility works to Cringle Street and Kirtling Street (part of Work No. 13b). Purposes ancillary or incidental to the above purposes.\nKirtling Street\nLondon Borough of Wandsworth\n297, 299, 300, 301, 302, 308, 310a, 311a, 315, 316, 318, 319, 323, 324\nAreas required for CSO drop shaft construction; Heathwall/SWSR connection tunnel construction; two CSO interception works construction; working area in the foreshore; and river wall works including utility supplies, working area in the foreshore, provision of temporary campshed, cranage, enclosures, concrete batching plant, workshop and stores, office, parking and welfare facilities, and vehicle and pedestrian circulation areas. Areas for construction works associated with the temporary relocation of the Battersea Barge. Highway works to Nine Elms Lane (part of Work No. 14c). Purposes ancillary or incidental to the above purposes.\nHeathwall Pumping Station\nLondon Borough of Lambeth\n5, 5a, 6, 7, 8, 9, 10, 10a, 11, 11a, 11b, 11c, 12, 13, 16, 18, 21, 24, 25, 26, 26a, 27, 31, 32, 34, 34a, 35, 40, 41, 42, 43, 44, 47, 49, 50, 51\nAreas required for CSO drop shaft construction; Clapham/Brixton connection tunnel construction; two CSO interception works construction; and protective works to slipway and walls including utility supplies, working areas in the foreshore, temporary campshed, cranage, enclosures, concrete batching plant, workshop and stores, office, parking and welfare facilities, accessways, and vehicle and pedestrian circulation areas. Highway works to Albert Embankment (part of Work No. 15c). Purposes ancillary or incidental to the above purposes.\nAlbert Embankment Foreshore\nCity of Westminster\n13a, 14, 15, 16, 17, 17b, 19a, 21, 22, 23, 23a, 25, 26, 27, 28\nAreas required for CSO drop shaft construction; Regent Street connection tunnel construction; CSO interception works construction; Low Level Sewer connection works construction; working area in the foreshore, provision of temporary campshed, cranage, workshop and stores, office, parking and welfare facilities, and vehicle and pedestrian circulation areas. Areas for construction works associated with the relocation of Tattershall Castle. Highway and utility works to Victoria Embankment (part of Work No. 16c).\nVictoria Embankment Foreshore\nCity of London\n2, 3, 4, 5, 15a, 19, 19a, 23, 32, 34, 35, 39, 40, 45, 46\nAreas required for CSO drop shaft construction; CSO interception works construction; Low Level Sewer connection works construction; working area in the foreshore; provision of temporary campshed, cranage; workshop and stores, office, parking and welfare facilities, and vehicle and pedestrian circulation areas. Areas for construction works associated with the relocation of Blackfriars Millennium Pier. Areas for construction works associated with the relocation of the President. Highway and utility works to Victoria Embankment (part of Work No. 17b).\nBlackfriars Bridge Foreshore\nLondon Borough of Southwark\n289, 290, 291, 292, 293, 297, 299, 300, 302\nAreas required for construction of drain down pumping station; connection chamber; flow measurement chamber; electrical switchgear and facilities building and associated pipework; including cranage, storage and welfare facilities. Highway and utility works in Maguire Street and Gainsford Street (part of Work No. 18). Purposes ancillary or incidental to the above purposes.\nShad Thames Pumping Station\nLondon Borough of Southwark\n15, 16, 17, 18, 21, 22, 24, 26, 27, 28, 31, 39, 40, 41, 42, 44, 45, 46, 47, 48, 49, 50, 51, 52, 61\nAreas required for shaft construction; main tunnel construction; and flood wall works including utility supplies, working area in the foreshore, cranage, acoustic and other enclosures, concrete batching plant, workshop and stores, office, parking and welfare facilities, and vehicle and pedestrian circulation areas. Highway works to Bevington Street. Utility works in Loftie Street, Chambers Street and East Lane (part of Work No. 19b). Purposes ancillary or incidental to the above purposes.\nChambers Wharf\nLondon Borough of Southwark\n286, 287, 288\nAreas required for CSO drop shaft construction; CSO interception works construction; including utility supplies, cranage, enclosures, concrete batching plant, workshop and stores, office, parking and welfare facilities, and vehicle and pedestrian circulation areas. Highway and utility works to Chilton Grove, Yeoman Street and Croft Street (part of Work No. 21b). Purposes ancillary or incidental to the above purposes.\nEarl Pumping Station\nLondon Borough of Lewisham\n2, 4, 5, 7, 8, 9, 10, 15, 16, 20, 21, 22, 23, 24\nAreas required for CSO drop shaft construction; CSO interception works construction; including utility supplies, cranage, enclosures, concrete batching plant, workshop and stores, office, parking and welfare facilities, and vehicle and pedestrian circulation areas. Highway and utility works to Chilton Grove, Yeoman Street and Croft Street (part of Work No. 21b). Purposes ancillary or incidental to the above purposes.\nEarl Pumping Station\nLondon Borough of Lewisham\n150, 151, 152, 153, 154, 158, 164, 165, 166, 167, 168, 169, 170, 172, 174, 175, 177, 180, 181, 182\nAreas required for CSO drop shaft construction; CSO interception works construction including cranage, enclosure, concrete batching plant, workshop and stores, office, parking and welfare facilities, vehicle and pedestrian circulation areas and fire assembly points. Areas for two fire assembly points for school. Highway works to Crossfield Street and Coffey Street. Highway and utility works to Deptford Church Street (part of Work No. 22b). Purposes ancillary or incidental to the above purposes.\nDeptford Church Street\nRoyal Borough of Greenwich\n1, 2, 3, 4\nAreas required for CSO drop shaft construction; CSO interception works construction; construction including cranage, enclosure, concrete batching plant, workshop and stores, office, parking and welfare facilities, vehicle and pedestrian circulation areas and fire assembly points. Areas for two fire assembly points for school. Highway works to Crossfield Street and Coffey Street. Highway and utility works in Deptford Church Street (part of Work No. 22b). Purposes ancillary or incidental to the above purposes.\nDeptford Church Street\nRoyal Borough of Greenwich\n11, 12, 15, 16, 18, 18a, 19, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 46, 47, 48, 49\nAreas required for CSO drop shaft construction; Greenwich connection tunnel construction; CSO interception works construction; tunnel secondary lining; and river wall works including utility supplies, cranage, acoustic and other enclosures, concrete batching plant, workshop and stores, office, parking and welfare facilities, and vehicle and pedestrian circulation areas. Highway works to Norman Road (part of Work No. 23b). Purposes ancillary or incidental to the above purposes.\nGreenwich Pumping Station\nLondon Borough of Tower Hamlets\n21, 21a, 22, 22a, 23, 23a, 24, 25, 32, 33, 34, 35, 36, 36a, 37\nAreas required for CSO drop shaft construction; CSO interception works construction; river wall works and replacement or refurbishment of park facilities including utility supplies, working area in the foreshore, campshed, cranage, enclosures, concrete batching plant, workshop and stores, office, parking and welfare facilities, vehicle and pedestrian circulation areas. Highway works to Glamis Road. Utility works in Glamis Road and The Highway (part of Work No. 24b). Purposes ancillary or incidental to the above purposes.\nKing Edward Memorial Park Foreshore\nLondon Borough of Tower Hamlets\n210, 212, 213, 218, 219, 220, 221, 222, 224, 225\nAreas required for construction of chamber, kiosk, ventilation column and associated pipework; cranage; storage and welfare facilities. Highway and utility works in Ratcliffe Lane (part of Work No. 25). Purposes ancillary or incidental to the above purposes.\nBekesbourne Street\nLondon Borough of Newham\n21, 22, 23, 24, 25, 26, 28, 33\nAreas required for shaft construction; ventilation equipment and structure construction; tunnel secondary lining; including utility supplies, cross-river footbridge, cranage, enclosures, concrete batching plant, workshop and stores, office, parking and welfare facilities, and vehicle and pedestrian circulation areas. Purposes ancillary or incidental to the above purposes.\nAbbey Mills Pumping Station\nLondon Borough of Newham\n34, 35, 36, 37, 38, 39, 48, 52, 53, 58, 59, 60, 61, 62, 63, 64, 65, 66, 66a, 67, 68, 69, 70, 71, 72, 78, 79, 82\nAreas required for siphon tunnel construction; shafts construction; other permanent works construction; including utility supplies, cranage, enclosures, concrete batching plant, workshop and stores, office, parking and welfare facilities, and vehicle and pedestrian circulation areas. Purposes ancillary or incidental to the above purposes.\nBeckton Sewage Treatment Works",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 14 in force at 24.9.2014, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2014/2384/schedule/14",
    "retrieved_at": "2026-10-29T00:03:40.087761+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}