# The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014, Paragraph 2

Extent: E+W

In this Part of this Schedule—
“approval” in relation to specified works means approval of the engineer appointed by LRSL, such approval not to be unnecessarily withheld or delayed;
“construction” shall include reconstruction, altering, replacing, relaying, removal, maintenance and repair of the specified works;
“designated works” means Work No 17b authorised by this Order (construction of pier to relocate Blackfriars Millennium Pier);
“engineer” means the engineer appointed by LRSL;
“LRSL” means London River Services Limited, a company limited by shares and incorporated under the Companies Act 1985 whose registered number is 03485723;
“Non-River DCO Works” means the authorised development and associated development and any ancillary works to be constructed on any land located outside of the River Areas;
“plans” includes sections, designs, drawings, specifications, soil reports, staging proposals, programmes, calculations, methods of construction, risk assessments and details of the extent, timing and duration of any proposed occupation of the piers and “approved plans” means plans approved or deemed to be approved or settled by arbitration in accordance with the provisions of this Part of this Schedule;
“the piers” means Blackfriars Millennium Pier, Embankment Pier and Putney Pier and any works, apparatus and equipment connected therewith;
“River Areas” means the areas comprising the rivers known as the River Thames and Deptford Creek and such areas include the bed, banks, sub-soil, foreshore and river walls of the River Thames and Deptford Creek but do not include works to the surface of structures over the River Areas;
“River DCO Works” means that part of the authorised development consisting of any works of excavation, piling, sinking or boreholes, tunnelling or other works including those associated with the temporary relocation of the residential house boat carried out within the River Areas;
“the specified works” means
(a)so much of any Non-River DCO Works as may be situated within 15 metres (measured in any direction) of, or may in any way affect, the designated access route to the piers; and
(b)so much of any River DCO Works as may be situated within, 50 metres (measured in any direction) of, or may in any way affect the piers.
and includes the construction and maintenance of the designated works and the decommission and removal of Blackfriars and Millennium Pier.

---
Source: https://www.legislation.gov.uk/uksi/2014/2384/schedule/16/part/4/chapter/2/paragraph/2 (the official version)
Page: https://openlegislation.uk/thames-water-utilities-limited-thames-tideway-tunnel-order-2014/schedule-16/part-4/chapter-2/paragraph-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.