# The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014, Paragraph 2

Extent: E+W

In this Part of this Schedule—
“approval” in relation to specified works means approval of the engineer appointed by TfL, such approval not to be unreasonably withheld or delayed;
“construction” shall include reconstruction, altering, replacing, relaying, removal, maintenance and repair of the specified works;
“designated works” means—
the construction of Work No. 1a beneath Great West Road at British Grove (A4);
the construction of Work No. 7 beneath Wandsworth Plain, Armoury Way and Wandsworth High Street (A3);
the construction of Work No. 10b beneath York Road (A3200);
the construction of Work No. 1b adjacent to Chelsea Embankment (A3212);
the construction of Work No. 1c beneath Kirtling St (A3205);
the construction of Work No. 1c, 15a, 15b and 15c (beneath Vauxhall Bridge (A202);
the construction of Work No. 1c beneath Lambeth and Westminster Bridges A3203 and A302;
the construction of Work No. 1c beneath Victoria Embankment (A3211);
the construction of Work No. 17b (low level sewer interception chamber at Blackfriars Bridge, works to Blackfriars bridgehead structure the North Western link from Blackfriars bridge down onto the A3211);
the construction of Work No. 1d beneath Limehouse Link (A1203), Commercial Road (A13), Burdett Road (A1205) & Blackwall Tunnel Northern Approach (A12); and
the construction of Work No. 20 (beneath Jamaica Road (A200);
Falconbrook Pumping Station (relocation of bus stops on York Road – part of Work no. 10c);
Kirtling Street (relocation of bus stops on Cringle Street – part of Work no. 13b);
Deptford Church Street (relocation of bus stops on Deptford Church Street – part of Work no. 22b)
“engineer” means the engineer appointed by TfL;
“LBSL” means London Bus Services Limited;
“plans” includes sections, designs, drawings, specifications, soil reports, staging proposals, programmes, calculations, methods of construction, risk assessments and details of the extent, timing and duration of any proposed occupation of protected property and “approved plans” means plans approved or deemed to be approved or settled by arbitration in accordance with the provisions of this Part of this Schedule;
“protected property” means any lands held or used by TfL for the purposes of its operational highway undertaking and any works, apparatus and equipment connected therewith for the maintenance or operation of which TfL is responsible when the relevant specified works are begun;
“the specified works” means so much of the designated works as may be situated within 50 metres (measured in any direction) of, or may in any way affect, protected property and includes the construction of any such work.
“TfL” means Transport for London and in paragraph 9 includes LBSL.

---
Source: https://www.legislation.gov.uk/uksi/2014/2384/schedule/16/part/4/chapter/3/paragraph/2 (the official version)
Page: https://openlegislation.uk/thames-water-utilities-limited-thames-tideway-tunnel-order-2014/schedule-16/part-4/chapter-3/paragraph-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.