{
  "url": "https://openlegislation.uk/thames-water-utilities-limited-thames-tideway-tunnel-order-2014/schedule-5",
  "json_url": "https://openlegislation.uk/thames-water-utilities-limited-thames-tideway-tunnel-order-2014/schedule-5.json",
  "legislation": "uksi/2014/2384",
  "legislation_title": "The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014",
  "legislation_url": "https://openlegislation.uk/thames-water-utilities-limited-thames-tideway-tunnel-order-2014",
  "path": "schedule/5",
  "kind": "schedule",
  "number": "5",
  "heading": "STREETS SUBJECT TO ALTERATION OF LAYOUT",
  "text": "Borough\nStreet to be altered\nDescription of alteration\nRelevant Site\nLondon Borough of Ealing\nCanham Road\nWorks to provide site access, temporary removal of on street parking, introduction of temporary waiting restrictions and footway widening works.\nActon Storm Tanks\nLondon Borough of Ealing\nWarple Way\nWorks to provide site access, temporary removal of on street parking and introduction of temporary waiting restrictions\nActon Storm Tanks\nLondon Borough of Ealing\nStanley Gardens\nWorks associated with the temporary modification to kerb line, temporary removal of on street parking and introduction of temporary waiting restrictions\nActon Storm Tanks\nLondon Borough of Hammersmith and Fulham\nDistillery Road\nWorks to provide site accesses\nHammersmith Pumping Station\nLondon Borough of Hammersmith and Fulham\nChancellor’s Road\nTemporary removal of on street parking and introduction of temporary waiting restrictions. Modification to kerb line on its junction with Distillery Road\nHammersmith Pumping Station\nLondon Borough of Wandsworth\nThe Embankment\nWorks to provide site access, temporary removal of on street parking, the introduction of temporary waiting restrictions, formation of access to temporary slipway, temporary suspension of one-way, kerb line modifications and temporary removal of traffic island\nPutney Embankment Foreshore\nWorks associated with environmental enhancement including footway surfacing and street furniture\nLondon Borough of Wandsworth\nGlendarvon Street\nTemporary removal of on street parking and introduction of waiting restrictions\nPutney Embankment Foreshore\nLondon Borough of Wandsworth\nLower Richmond Road\nInstallation of ducting within carriageway and pedestrian site access gate\nPutney Embankment Foreshore\nLondon Borough of Wandsworth\nPutney High Street/Putney Bridge\nInstallation of vent column\nPutney Embankment Foreshore\nHammersmith and Fulham\nCarnwath Road\nWorks to provide site access, temporary removal of on street parking and introduction of temporary waiting restrictions, footway and junction modifications at its junction with Wandsworth Bridge Road\nCarnwath Road Riverside\nHammersmith and Fulham\nWandsworth Bridge Road\nModification to traffic signalised junction\nCarnwath Road Riverside\nLondon Borough of Wandsworth\nDormay Street\nWorks to provide site access\nDormay Street\nLondon Borough of Wandsworth\nThe Causeway\nWorks to provide site access\nTemporary removal of on street parking and introduction of temporary waiting restrictions\nDormay Street\nLondon Borough of Wandsworth\nArmoury Way\nTemporary kerb line and junction modifications\nDormay Street\nLondon Borough of Wandsworth\nNeville Gill Close\nProvision of construction access, temporary modification to kerb lines and pedestrian refuge\nKing George’s Park\nLondon Borough of Wandsworth\nBuckhold Road\nModification to kerb lines, pedestrian refuge and park entrance\nKing George’s Park\nLondon Borough of Wandsworth\nYork Road\nWorks to provide site accesses and works associated with the relocation of bus stop facilities\nFalconbrook Pumping Station\nLondon Borough of Wandsworth\nYork Gardens\nWoks to provide site access and temporary removal of parking\nFalconbrook Pumping Station\nRoyal Borough of Kensington and Chelsea\nLots Road\nWorks to provide site access, temporary removal of on street parking and introduction of temporary waiting restrictions\nCremorne Wharf Depot\nRoyal Borough of Kensington and Chelsea\nChelsea Embankment\nWorks to provide site accesses\nWorks to facilitate the provision of traffic management including provision of a temporary formal crossing, temporary removal of traffic island, provision of site hoarding\nWorks associated with environmental enhancement including footway surfacing and street furniture\nChelsea Embankment Foreshore\nRoyal Borough of Kensington and Chelsea\nThe Bull Ring\nWorks associated with environmental enhancement including footway and carriageway surfacing and street furniture\nChelsea Embankment Foreshore\nLondon Borough of Wandsworth\nKirtling Street\nWorks to provide site access, the provision of traffic management, temporary removal of on street parking and introduction of temporary waiting restrictions\nWorks to undertake environmental enhancements\nKirtling Street\nLondon Borough of Wandsworth\nCringle Street\nWorks to provide site access\nWorks to undertake carriageway crossing for services\nWorks associated with environmental enhancement including footway surfacing and street furniture\nKirtling Street\nLondon Borough of Wandsworth\nNine Elms Lane\nWorks to provide site access\nWorks associated with environmental enhancement including footway surfacing, tree planting, and street furniture\nHeathwall Pumping Station\nLondon Borough of Lambeth\nAlbert Embankment\nWorks to provide site access\nAlbert Embankment Foreshore\nCity of Westminster\nVictoria Embankment\nWorks to provide site access.\nWorks to facilitate the provision of traffic management, modification to waiting restrictions, removal of central carriageway reserve, provision of site hoarding, removal of cycle parking station\nWorks to facilitate the provision of access to boat moorings\nWorks associated with environmental enhancement including footway surfacing and street furniture\nWorks to construct a ramp and stairs on the footway\nVictoria Embankment Foreshore\nCity of London\nVictoria Embankment / Blackfriars Underpass / Blackfriars Bridge head / Blackfriars Bridge\nWorks to provide site access.\nProvision of traffic management including modification to waiting restrictions/loading bays, provision of site hoarding\nWorks to facilitate the temporary and permanent provision of access to boat moorings\nWorks associated with environmental enhancement including footway surfacing, step access from Blackfriars Bridge, lift access from Blackfriars Bridge, and street furniture\nWorks to construct a ramp and stairs on the footway\nBlackfriars Bridge Foreshore\nCity of London\nNew Bridge Street / Blackfriars Bridge / Blackfriars Bridge head\nProvision of Temporary traffic management\nProvision of pedestrian lift\nBlackfriars Bridge Foreshore\nCity of London\nWhite Lion Hill\nModification of kerb, boundary wall, railing and provision of loading bay\nBlackfriars Bridge Foreshore\nLondon Borough of Southwark\nMaguire Street and Shad Thames\nWorks to provide site access\nWorks for the provision of traffic management, provision of temporary turning head, temporary removal of on street parking, introduction of temporary waiting restrictions and works for the provision of chambers, pipeline and ducts\nShad Thames Pumping Station\nLondon Borough of Southwark\nGainsford Street\nWorks for the provision of in sewer equipment\nShad Thames Pumping Station\nLondon Borough of Southwark\nChambers Street\nWorks to provide site access\nThe temporary removal of on street parking and introduction of temporary waiting restrictions\nChambers Wharf\nLondon Borough of Southwark\nLoftie Street\nWorks to provide site access\nChambers Wharf\nLondon Borough of Southwark\nBevington Street\nThe temporary removal of on street parking and introduction of temporary waiting restrictions, provision of temporary pedestrian refuge\nChambers Wharf\nLondon Borough of Southwark\nCroft Street\nThe temporary removal of on street parking and introduction of temporary waiting restrictions modification to traffic calming features\nService connection to existing sewer\nEarl Pumping Station\nLondon Borough of Southwark\nChilton Grove\nWorks to provide site access and service connections to existing sewer, temporary removal of traffic calming, on street parking and introduction of temporary waiting restrictions\nEarl Pumping Station\nLondon Borough of Lewisham\nCroft Street\nWorks to provide site access\nThe temporary removal of on street parking and introduction of temporary waiting restrictions, modification to traffic calming features.\nService connection to existing sewer\nEarl Pumping Station\nLondon Borough of Lewisham\nYeoman Street\nWorks to provide site access, service connections to existing sewer, temporary removal of traffic calming, on street parking and introduction of temporary waiting restrictions\nEarl Pumping Station\nLondon Borough of Lewisham\nChilton Grove\nWorks to provide site access, service connections to existing sewer, temporary removal of traffic calming, on street parking and introduction of temporary waiting restrictions\nEarl Pumping Station\nLondon Borough of Lewisham\nDeptford Church Street\nWorks associated with the temporary suspension of the pedestrian crossing, provision of temporary pedestrian crossing, temporary removal of central carriageway divide, temporary removal of bus lanes. Temporary relocation of bus stops introduction of temporary waiting restrictions\nWorks associated with environmental enhancement including footway surfacing and street furniture\nDeptford Church Street\nLondon Borough of Lewisham\nCoffey Street\nWorks to provide site access\nTemporary removal of on street parking and introduction of temporary waiting restrictions\nWorks associated with temporary one way use, including associated signs\nWorks associated with environmental enhancement including footway surfacing and street furniture\nDeptford Church Street\nLondon Borough of Lewisham\nCrossfield Street\nWorks to provide site access\nTemporary removal of on street parking and introduction of temporary waiting restrictions.\nWorks associated with temporary one way use, including associated signs\nWorks to form a temporary traffic management system and emergency evacuation point\nWorks associated with the provision of a temporary section of carriageway linking Crossfield Road to Coffey Street\nWorks associated with environmental enhancement including footway surfacing and street furniture\nDeptford Church Street\nRoyal Borough of Greenwich\nNorman Road\nWorks to provide site access\nGreenwich Pumping Station\nRoyal Borough of Greenwich\nGreenwich High Road\nWorks to provide site access\nGreenwich Pumping Station\nRoyal Borough of Greenwich\nUnnamed pedestrian/cycle route between Norman Road and Creekside\nTemporary diversion of route and associated works\nGreenwich Pumping Station\nLondon Borough of Tower Hamlets\nGlamis Road\nWorks to provide site access\nTemporary removal of on street parking and introduction of temporary waiting restrictions, modification to traffic signal stop lines\nKing Edward Memorial Park Foreshore\nLondon Borough of Tower Hamlets\nBekesbourne Street\nTemporary removal of on street parking and introduction of temporary waiting restrictions, provision of construction area, provision of plant (control kiosk)\nBekesbourne Street\nLondon Borough of Tower Hamlets\nRatcliffe Lane\nProvision of construction area, provision of plant (vent pipe), temporary removal of on street parking and introduction of temporary waiting restrictions\nBekesbourne Street\nLondon Borough of Newham\nGay Road\nWorks to provide site access, temporary removal of on street parking, and the introduction of temporary waiting restrictions\nAbbey Mills Pumping Station\nLondon Borough of Newham\nAbbey Lane\nTemporary removal of on street parking and introduction of temporary waiting restrictions\nAbbey Mills Pumping Station\nLondon Borough of Newham\nJenkins Lane\nWorks to provide construction / permanent site access\nBeckton Sewage Treatment Works",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Words in Sch. 5 Table substituted (24.11.2022) by The Thames Water Utilities Limited (Thames Tideway Tunnel) (Amendment) Order 2022 (S.I. 2022/1242), art. 1(1), Sch. 4 Table"
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 5 in force at 24.9.2014, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2014/2384/schedule/5",
    "retrieved_at": "2026-10-29T00:03:40.087761+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}