# The Thurrock Flexible Generation Plant Development Consent Order 2022, Schedule 5: LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN AND IN WHICH ONLY RIGHTS ETC MAY BE ACQUIRED

Extent: E+W+S

(1)
Plot reference number shown on land plans
(2)
Rights over land which may be acquired
(3)
Relevant part of the authorised development for which temporary possession for construction can be taken
Land Plans – Sheet 1
01/09
Right to install, use, protect, retain, inspect, maintain, repair and replace electrical cables and associated infrastructure and to take vehicular access for the same. Imposition of a restrictive covenant for the protection of electrical cables and associated infrastructure installed in the land.
Work no.3
01/10
Right to install, use, protect, retain, inspect, maintain, repair and replace electrical cables and associated infrastructure and to take vehicular access for the same. Imposition of a restrictive covenant for the protection of electrical cables and associated infrastructure installed in the land.
Work no.3
01/14
Right of access, including vehicular access, to create and maintain replacement common land.
Work no.14
01/15
Right to install, use, protect, retain, inspect, maintain, repair and replace electrical cables and associated infrastructure and to take vehicular access for the same.
Imposition of a restrictive covenant for the protection of electrical cables and associated infrastructure installed in the land.
Work no.3
01/25
Right to install, use, protect, retain, inspect, maintain, repair and replace a gas pipeline and associated infrastructure, and to take vehicular access for the same. Imposition of a restrictive covenant for the protection of gas pipeline and associated infrastructure installed in the land.
Work nos.4 and 8
Land Plans – Sheet 2
02/01
Right of access, including vehicular access, to create and maintain habitat creation and enhancement land.
Work no.2
02/02
Right of access, including vehicular access, to create and maintain habitat creation and enhancement land.
Work no.2
02/04
Right of access, including vehicular access, to create and maintain replacement common land.
Work no.14
02/08
Right of access, including vehicular access, to create and maintain replacement common land.
Work no.14
02/09
Right of access, including vehicular access, to create and maintain replacement common land.
Work no.14
02/10
Right of access, including vehicular access, to create and maintain replacement common land and habitat creation and enhancement land, and to use, repair, improve or alter existing accesses, tracks, roads or ways.
Work nos.2 and 14
02/11
Right of access, including vehicular access, to create and maintain replacement common land and habitat creation and enhancement land, and to use, repair, improve or alter existing accesses, tracks, roads or ways.
Work nos.2 and 14
02/13
Right to install, use, protect, retain, inspect, maintain, repair and replace a gas pipeline and associated infrastructure, and to take vehicular access for the same. Imposition of a restrictive covenant for the protection of gas pipeline and associated infrastructure installed in the land.
Work nos.4 and 8
Land Plans – Sheet 3
03/01
Right to install, use, protect, retain, inspect, maintain, repair and replace a gas pipeline and associated infrastructure, and to take vehicular access for the same. Imposition of a restrictive covenant for the protection of gas pipeline and associated infrastructure installed in the land.
Work nos.4 and 8
03/02
Right to install, use, protect, retain, inspect, maintain, repair and replace a gas pipeline and associated infrastructure, and to take vehicular access for the same. Imposition of a restrictive covenant for the protection of gas pipeline and associated infrastructure installed in the land.
Work no.4
03/03
Right to install, use, protect, retain, inspect, maintain, repair and replace a gas pipeline and associated infrastructure, and to take vehicular access for the same. Imposition of a restrictive covenant for the protection of gas pipeline and associated infrastructure installed in the land.
Work no.4
03/04
Right to install, use, protect, retain, inspect, maintain, repair and replace a gas pipeline and associated infrastructure, and to take vehicular access for the same. Imposition of a restrictive covenant for the protection of gas pipeline and associated infrastructure installed in the land.
Work no.4
03/05
Right to install, use, protect, retain, inspect, maintain, repair and replace a gas pipeline and associated infrastructure, and to take vehicular access for the same. Imposition of a restrictive covenant for the protection of gas pipeline and associated infrastructure installed in the land.
Work no.4
03/06
Right to install, use, protect, retain, inspect, maintain, repair and replace a gas pipeline and associated infrastructure, and to take vehicular access for the same. Imposition of a restrictive covenant for the protection of gas pipeline and associated infrastructure installed in the land.
Work no.4
03/08
Right to install, use, protect, retain, inspect, maintain, repair and replace a gas pipeline and associated infrastructure, and to take vehicular access for the same. Imposition of a restrictive covenant for the protection of gas pipeline and associated infrastructure installed in the land.
Work no.4
03/09
Right to install, use, protect, retain, inspect, maintain, repair and replace a gas pipeline and associated infrastructure, and to take vehicular access for the same. Imposition of a restrictive covenant for the protection of gas pipeline and associated infrastructure installed in the land.
Work no.4

---
Source: https://www.legislation.gov.uk/uksi/2022/157/schedule/5 (the official version)
Page: https://openlegislation.uk/thurrock-flexible-generation-plant-development-consent-order-2022/schedule-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.