# The Tillbridge Solar (Correction) Order 2026

S.I. 2026/487 · made 29 April 2026

This Order corrects errors in the Tillbridge Solar Order 2025 (S.I. 2025/1105), a development consent order made under the Planning Act 2008, following a request made under paragraph 1(5)(a) of Schedule 4 to that Act.

Made under: Planning Act 2008 (Schedule 4 paragraph 1)

PDFs: Printed copy https://openlegislation.uk/tillbridge-solar-correction-order-2026/pdf/uksi_20260487_en.pdf

## Introductory text

INFRASTRUCTURE PLANNING
Made 29th April 2026
Coming into force 30th April 2026
The Tillbridge Solar Order 2025(“the Tillbridge Order”), which granted development consent within the meaning of the Planning Act 2008 (“the Act”) contains correctable errors within the meaning of paragraph 1 of Schedule 4 to the Act.
In accordance with paragraph 1(5)(a) of Schedule 4 to the Act, before the end of the relevant period, the Secretary of State received a written request from the applicant for the correction of errors and omissions in the Tillbridge Order.
In accordance with paragraph 1(7) of Schedule 4 to the Act, the Secretary of State has informed each relevant local planning authority for the area in which the land to which the Tillbridge Order relates is situated that the request has been received.
The Secretary of State, in exercise of the powers conferred by paragraphs 1(4) and 1(8) of Schedule 4 to the Act, makes the following Order.

## 1 Citation and commencement

This Order may be cited as the Tillbridge Solar (Correction) Order 2026 and comes into force on 30th April 2026.

## 2 Corrections

The Tillbridge Order is corrected as set out in the table in the Schedule to this Order, in which—
(a) column 1 sets out where the correction is to be made;
(b) column 2 sets out how the correction is to be made; and
(c) column 3 sets out the text which is to be substituted, inserted, or omitted.

## Signature

Signed by authority of the Secretary of State for Energy Security and Net Zero
John Wheadon
Head of Energy Infrastructure Planning and Innovation
Department for Energy Security and Net Zero
29th April 2026

## Corrections

(1) Where the correction is to be made
(2) How the correction is to be made
(3) Text to be substituted, inserted, or omitted
Article 2(1) (interpretation) – definition of “archaeological mitigation strategy”
Omit
“, including Part 1 and Part 2,”
Article 2(1) (interpretation) – definition of “framework landscape and ecological management plan”
After “ecological management plan”, in the second place it occurs, for “of” substitute
“for”
Article 2(1) (interpretation) – definition of “maintain”
For “, to the extent assessed in the environmental statement” substitute
“of”
Article 2(1) (interpretation) – definition of “Order land”
After “to be”, in the first place it occurs, omit
“to be”
Article 2(5) (interpretation)
After “4C, 4D and” omit
“and”
Article 19(6) (protective works to buildings)
After “the question” insert
“of”
Article 28(2) (modification of Part 1 of the Compulsory Purchase Act 1965)
For “order”” substitute
“order)””
Schedule 1 (authorised development), paragraph 1 – definition of “equipment storage”
For “1,200m2” substitute
“1,200m 2 ”
Schedule 1 (authorised development), paragraph 1 – definition of “Solar Station”
For “this” substitute
“thick”
Schedule 1 (authorised development), paragraph 2(2) – Work No. 9(f)
For “fencing gates boundary” substitute
“fencing, gates, boundary”
Schedule 1 (authorised development), paragraph 2(2) – Work No. 10(a)(i)
For “alternation” substitute
“alteration”
Schedule 1 (authorised development), paragraph 2(2), Work No. 11(b)
For “fencing gates boundary” substitute
“fencing, gates, boundary”
Schedule 6 (streets and public rights of way), Part 1
For “Cottom Road” substitute
“Cottam Road”
Schedule 13 (documents and plans to be certified), row “Figure 16-8: Selected Bus Stops and Routes Closet to the Scheme”
For “Closet” substitute
“Closest”
Schedule 15 (protective provisions), Part 18, paragraph 280
Omit
“No acquisition except by agreement.”
Schedule 16 (procedure for discharge of requirements), paragraph 5(1)
After “not listed in”, in the second place it occurs, omit
“not listed in”

## Explanatory note

(This note is not part of the Order)
This Order corrects errors in the Tillbridge Solar Order 2025 (S.I. 2025/1105), a development consent order made under the Planning Act 2008, following a request made under paragraph 1(5)(a) of Schedule 4 to that Act.

---
Source: https://www.legislation.gov.uk/uksi/2026/487 (the official version)
Page: https://openlegislation.uk/tillbridge-solar-correction-order-2026
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.