# The Tillbridge Solar Order 2025, Article 15: Access to works

Extent: E+W+S

The undertaker may, for the purposes of, and in connection with the authorised development—
(a) form and lay out the permanent means of access, or improve existing means of access, in the locations specified in Part 1 (permanent means of access to works) of Schedule 7 (access to works);
(b) form and lay out the temporary means of access in the location specified in Part 2 (temporary means of access) of Schedule 7 (access to works); and
(c) with the approval of the relevant planning authority after consultation with the highway authority, form and lay out such other means of access or improve existing means of access, at such locations within the Order limits as the undertaker reasonably requires for the purposes of the authorised development.

---
Source: https://www.legislation.gov.uk/uksi/2025/1105/article/15 (the official version)
Page: https://openlegislation.uk/tillbridge-solar-order-2025/article-15
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

