# The Tillbridge Solar Order 2025, Article 3: Development consent etc. granted by this Order

Extent: E+W+S

(1) Subject to the provisions of this Order and the requirements in Schedule 2 (requirements), the undertaker is granted development consent for the authorised development to be carried out within the Order limits.
(2) Each numbered work must be situated within the corresponding numbered area shown on the works plans and within the limits of deviation.

---
Source: https://www.legislation.gov.uk/uksi/2025/1105/article/3 (the official version)
Page: https://openlegislation.uk/tillbridge-solar-order-2025/article-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.