  "url": "https://openlegislation.uk/tillbridge-solar-order-2025/schedule-13",
  "json_url": "https://openlegislation.uk/tillbridge-solar-order-2025/schedule-13.json",
  "legislation": "uksi/2025/1105",
  "legislation_title": "The Tillbridge Solar Order 2025",
  "legislation_url": "https://openlegislation.uk/tillbridge-solar-order-2025",
  "path": "schedule/13",
  "kind": "schedule",
  "number": "13",
  "heading": "DOCUMENTS AND PLANS TO BE CERTIFIED",
  "text": "(1)\nDocument name\n(2)\nDocument reference\n(3)\nRevision number\n(4)\nDate\nLand and Crown Land Plans\nEN010142/APP/2.2\n1\nSeptember 2024\nWorks Plans\nEN010142/APP/2.3\n4\nApril 2025\nStreets, Rights of Way and Access Plans\nEN010142/APP/2.4\n3\nOctober 2024\nTraffic Regulation Measures Plan\nEN010142/APP/2.5\n3\nOctober 2024\nHedgerow Removal Plan\nEN010142/APP/2.9\n1\nSeptember 2024\nBook of Reference\nEN010142/APP/4.3\n5\nApril 2025\nEnvironmental Statement (other than those listed individually below)\nEN010142/APP/6.1\n0\nApril 2024\nEnvironmental Statement Chapter 3: Scheme Description of the ES\nEN010142/APP/6.1\n3\nJanuary 2025\nEnvironmental Statement Chapter 10: Water Environment\nEN010142/APP/6.1\n1\nDecember 2024\nEnvironmental Statement Chapter 12: Landscape and Visual Assessment\nEN010142/APP/6.1\n2\nJanuary 2025\nEnvironmental Statement Chapter 13: Noise and Vibration\nEN010142/APP/6.1\n1\nJune 2024\nEnvironmental Statement Chapter 18: Cumulative Effects and Interactions\nEN010142/APP/6.1\n4\nApril 2025\nEnvironmental Statement Chapter 19: Summary of Significant Environmental Effects\nEN010142/APP/6.1\n1\nDecember 2024\nTechnical Appendices (other than those listed individually below)\nEN010142/APP/6.2\n0\nApril 2024\nAppendix 8-5-1: Principal Site Geophysical Report (Part 1)\nEN010142/APP/6.2\n1\nJune 2024\nAppendix 8-5-2: Cable Route Corridor Geophysical Survey Report\nEN010142/APP/6.2\n1\nJune 2024\nAppendix 9-5: Baseline Report for Great Crested Newts\nEN010142/APP/6.2\n1\nJune 2024\nAppendix 9-12: Habitat Regulations Assessment Report\nEN010142/APP/6.2\n2\nDecember 2024\nAppendix 10-3: Flood Risk Assessment\nEN010142/APP/6.2\n2\nJanuary 2025\nAppendix 10-4: Outline Drainage Strategy\nEN010142/APP/6.2\n0\nApril 2024\nAppendix 12-6: LVIA Assessment of Visual Effects\nEN010142/APP/6.2\n1\nDecember 2024\nAppendix 12-7: Arboricultural Impact Assessment Part 1, 2 and 3\nEN010142/APP/6.2\n1\nApril 2025\nAppendix 13-4: Noise Modelling\nEN010142/APP/6.2\n1\nJune 2024\nFigures (other than those listed individually below)\nEN010142/APP/6.3\n0\nApril 2024\nFigure 2-2: Environmental Constraints Plan\nEN010142/APP/6.3\n1\nJune 2024\nFigure 3-1: Indicative Principal Site Layout Plan\nEN010142/APP/6.3\n2\nApril 2025\nFigure 3-7: Access Locations\nEN010142/APP/6.3\n1\nSeptember 2024\nFigure 3-12: Trenchless Crossing Cross Sections\nEN010142/APP/6.3\n1\nOctober 2024\nFigure 4-2: Outcome of Planning and Environmental Constraints Mapping\nEN010142/APP/6.3\n1\nJune 2024\nFigure 4-3: Zones Suitable for Solar Development\nEN010142/APP/6.3\n1\nJune 2024\nFigure 10-5: Watercourses, Flood Zones and Internal Drainage Boards\nEN010142/APP/6.3\n1\nOctober 2024\nFigure 12-4: A-H Zones of Theoretical Visibility\nEN010142/APP/6.3\n1\nJune 2024\nFigure 12-5: Topography and Watercourses\nEN010142/APP/6.3\n1\nDecember 2024\nFigure 12-7: Public Rights of Way\nEN010142/APP/6.3\n1\nDecember 2024\nFigure 12-11: Local Landscape Character Areas (Defined by the Applicant)\nEN010142/APP/6.3\n1\nJune 2024\nFigure 12-13: Q-V Reference Viewpoint Photography\nEN010142/APP/6.3\n0\nJune 2024\nFigure 12-13: W-CC Reference Viewpoint Photography\nEN010142/APP/6.3\n0\nJune 2024\nFigure 13-2: Operational Noise Contours\nEN010142/APP/6.3\n1\nJune 2024\nFigure 16-3: Proposed HGV Routes – Principal Site and Cable Route Corridor\nEN010142/APP/6.3\n1\nJune 2024\nFigure 16-4: Local Highway Network\nEN010142/APP/6.3\n1\nJune 2024\nFigure 16-8: Selected Bus Stops and Routes Closest to the Scheme\nEN010142/APP/6.3\n1\nJune 2024\nFigure 18-5: Transport Cumulative Traffic Routes\nEN010142/APP/6.3\n2\nFebruary 2025\nOutline Design Principles Statement\nEN010142/APP/7.4\n3\nJanuary 2025\nFramework Construction Environmental Management Plan\nEN010142/APP/7.8\n3\nFebruary 2025\nFramework Operational Environmental Management Plan\nEN010142/APP/7.9\n4\nApril 2025\nFramework Decommissioning Environmental Management Plan\nEN010142/APP/7.10\n3\nFebruary 2025\nFramework Construction Traffic Management Plan\nEN010142/APP/7.11\n5\nFebruary 2025\nFramework Soil Management Plan\nEN010142/APP/7.12\n2\nApril 2025\nFramework Battery Safety Management Plan\nEN010142/APP/7.13\n1\nJanuary 2025\nFramework Public Rights of Way Management Plan\nEN010142/APP/7.16\n1\nDecember 2024\nFramework Landscape and Ecological Management Plan\nEN010142/APP/7.17\n6\nApril 2025\nFramework Skills, Supply Chain and Employment Plan\nEN010142/APP/7.18\n0\nApril 2024\nArchaeological Mitigation Strategy\nEN010142/APP/7.18\n0\nOctober 2024",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Word in Sch. 13 substituted (30.4.2026) by The Tillbridge Solar (Correction) Order 2026 (S.I. 2026/487), art. 1, Sch."
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 13 in force at 5.11.2025, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2025/1105/schedule/13",
    "retrieved_at": "2026-10-28T21:10:37.351261+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}