Article 3 Power to construct, etc., works
Subject to the provisions of this Order, the Council may, in the lines and situations and within the limits of deviation shown on the deposited plans and according to the levels shown on the deposited sections, construct and maintain the works hereinafter described with all necessary works and conveniences connected therewith—
-
Work No. 1
An opening bridge over the entrance between Torquay Inner Harbour and Torquay Outer Harbour, to be constructed in such a manner that it may be opened so as to afford a clear width at that entrance of not less than 8 metres at every level from the top of the flapgate forming part of Work No. 4 of the 1983 Act to a height upwards without limit above the level of high water, commencing at South Pier at reference point SX 9177163283 and terminating at the Old Fish Quay at reference point SX 9177063333.
-
Work No. 2
Piled moorings together with a pontoon system to be constructed or placed in Torquay Outer Harbour (having a ramp connection giving access to that system from Beacon Quay) commencing at reference point SX 9183063151 and terminating at reference point SX 9169063191.
-
Work No. 3
Piled moorings together with a pontoon to be constructed or placed in Torquay Outer Harbour (having a ramp connection giving access to that pontoon from Haldon Pier) commencing at reference point SX 9181663102 and terminating at reference point SX 9172763073.
-
Work No. 4
Demolition of existing slipways and the construction of an extended solid new quay face by means of the reclamation and infilling of the bed of the sea at Beacon Quay in Torquay Outer Harbour (comprising an area of approximately 1,550 square metres and incorporating a slipway) commencing at South Pier at reference point SX 9181663250 and terminating at Haldon Pier at reference point SX 9182463098.
-
Work No. 5
Piled moorings together with a pontoon to be constructed or placed in Torquay Outer Harbour (having a ramp connection giving access to that pontoon from Princess Pier) commencing at reference point SX 9144763237 and terminating at reference point SX 9152163154.
-
Work No. 6
The construction of a solid dinghy platform by means of the reclamation and infilling of the bed of the sea adjoining the south-eastern side of Haldon Pier (comprising an area of approximately 1,100 square metres and incorporating a slipway) commencing at reference point SX 9184163088 and terminating at reference point SX 9178663045.
The Council may, within the limits of deviation, from time to time reconstruct, renew, alter, enlarge, replace or relay the authorised works and may maintain the same as reconstructed, renewed, altered, enlarged, replaced or relaid.
Nothing in this article shall authorise the Council to demolish the existing slipways mentioned in Work No. 4 in paragraph (1) above without obtaining listed building consent in respect of that demolition under section 82 of the Planning (Listed Buildings and Conservation Areas) Act 1990f1.