  "url": "https://openlegislation.uk/town-and-country-planning-entertainment-resort-complex-bedford-special-development-no-2-order-2025/schedule-3/paragraph-28",
  "json_url": "https://openlegislation.uk/town-and-country-planning-entertainment-resort-complex-bedford-special-development-no-2-order-2025/schedule-3/paragraph-28.json",
  "legislation": "uksi/2025/1322",
  "legislation_title": "The Town and Country Planning (Entertainment Resort Complex, Bedford) Special Development (No. 2) Order 2025",
  "legislation_url": "https://openlegislation.uk/town-and-country-planning-entertainment-resort-complex-bedford-special-development-no-2-order-2025",
  "path": "schedule/3/paragraph/28",
  "kind": "paragraph",
  "number": "28",
  "heading": "Detailed designs: class 3 and class 6 authorised works",
  "text": "(1) A detailed design for class 3 or class 6 authorised works must include, in relation to the authorised works to which the detailed design relates—\n(a) the documents specified in sub-paragraph (2);\n(b) OS plans, technical drawings or explanatory text setting out the information specified in sub-paragraph (2).\n(2) The documents and information specified are—\n(a) a basic description;\n(b) the core design features, excluding climate resilience measures and a hard landscaping materials palette in the case of class 6 authorised works;\n(c) in the case of any public road that is, or is proposed to be, wholly or partly located in the Core Zone, an OS plan showing the location of—\n(i) the boundary between that part of the road designed for use by motor vehicles and any kerb,\n(ii) any active travel route associated with that road, and\n(iii) any other authorised work that it is proposed will immediately adjoin the road or that active travel route;\n(d) drawings of the authorised works to an appropriate scale;\n(e) in the case of class 6 authorised works that comprise a public road, details of highway layout and alignment that are in substantial accordance with the limits of deviation shown in respect of that public road in the access and roadways plan;\n(f) in respect of any construction work relating to a public road that is within paragraph (b) of the definition of “public road” in article 2(1) (interpretation), proposals for—\n(i) providing public access to and use of it;\n(ii) maintaining it until it is adopted by a highway authority as a highway maintainable at the public expense under section 38 or section 228 of the Highways Act 1980;\n(g) in the case of class 3(a) authorised works, plans showing the external dimensions, appearance and elevations of any station building.\n(3) When the site controller submits a detailed design to the Secretary of State for approval under this paragraph, it must also provide to the Secretary of State—\n(a) in the case of class 3 authorised works, confirmation from—\n(i) Network Rail Infrastructure Limited (company number 02904587), or\n(ii) such other body as may have assumed, before the date on which the detailed design is submitted to the Secretary of State, the function of approving designs of railway infrastructure that is carried out by Network Rail Infrastructure Limited at the date on which this Order is made,\nthat it has approved the design set out in the submission document;\n(b) in the case of class 6 authorised works that comprise a public road, confirmation from—\n(i) the highway authority for that public road, or\n(ii) a suitably qualified and experienced independent expert appointed by the site controller,\nthat the public road, if constructed in accordance with the details set out in the submission document, will be safe for public use as a highway.\n(4) The site controller must provide a compliance statement to the Secretary of State—\n(a) in relation to the submitted development, when it submits a detailed design to the Secretary of State under this paragraph;\n(b) in relation to a proposed modification of an endorsed detailed design, when it requests endorsement of such a modification.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "footnote",
      "label": "f1",
      "text": "1980 c. 66. Section 38 was amended by the Infrastructure Act 2015 (c. 7), section 1(6) and Schedule 1, paragraphs 1 and 19, the New Roads and Street Works Act 1991 (c. 22), section 22(1) and the Local Government Act 1985 (c. 51), section 102(2) and Schedule 17."
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2025/1322/schedule/3/paragraph/28",
    "retrieved_at": "2026-10-28T21:08:22.499243+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}