{
  "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017",
  "json_url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017.json",
  "id": "wsi/2017/567",
  "title": "The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2017",
  "short_title": "Town and Country Planning (Environmental Impact Assessment) 2017",
  "long_title": "These Regulations revoke and restate with amendments the provisions of the Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016 (“the 2016 Regulations”). The 2016 Regulations consolidated and updated earlier instruments which implemented Council Directive 85/337/EEC (“the 1985 Directive”) on the assessment of the effects of certain public and private projects on the environment in relation to town and country planning in Wales.",
  "citation": "W.S.I. 2017/567",
  "type": "wsi",
  "year": "2017",
  "number": "567",
  "version": "current",
  "date": "2017-04-20",
  "revised": true,
  "valid_from": "2026-06-02",
  "extent": "E+W",
  "unapplied_effects": 0,
  "provisions": [
    {
      "path": "introduction",
      "kind": "introduction",
      "number": null,
      "heading": "Introductory text",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/introduction",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "part/1",
      "kind": "part",
      "number": "1",
      "heading": "General",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/1",
      "kind": "regulation",
      "number": "1",
      "heading": "Title, commencement and application",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-1",
      "extent": "E+W",
      "status": null,
      "parent": "part/1"
    },
    {
      "path": "regulation/2",
      "kind": "regulation",
      "number": "2",
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-2",
      "extent": "E+W",
      "status": null,
      "parent": "part/1"
    },
    {
      "path": "regulation/3",
      "kind": "regulation",
      "number": "3",
      "heading": "Prohibition on granting planning permission , infrastructure consent or subsequent consent without environmental impact assessment",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-3",
      "extent": "E+W",
      "status": null,
      "parent": "part/1"
    },
    {
      "path": "regulation/4",
      "kind": "regulation",
      "number": "4",
      "heading": "Environmental impact assessment",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-4",
      "extent": "E+W",
      "status": null,
      "parent": "part/1"
    },
    {
      "path": "part/2",
      "kind": "part",
      "number": "2",
      "heading": "Screening",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/5",
      "kind": "regulation",
      "number": "5",
      "heading": "General provisions relating to screening",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-5",
      "extent": "E+W",
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "regulation/6",
      "kind": "regulation",
      "number": "6",
      "heading": "Requests for screening opinions",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-6",
      "extent": "E+W",
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "regulation/7",
      "kind": "regulation",
      "number": "7",
      "heading": "Requests for screening directions of the Welsh Ministers",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-7",
      "extent": "E+W",
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "part/3",
      "kind": "part",
      "number": "3",
      "heading": "Procedures Concerning Applications for Planning Permission and Subsequent Applications",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/8",
      "kind": "regulation",
      "number": "8",
      "heading": "Applications which appear to require screening opinion",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-8",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "regulation/9",
      "kind": "regulation",
      "number": "9",
      "heading": "Subsequent applications where environmental information previously provided",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-9",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "regulation/10",
      "kind": "regulation",
      "number": "10",
      "heading": "Subsequent applications where environmental information not previously provided",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-10",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "regulation/11",
      "kind": "regulation",
      "number": "11",
      "heading": "Application made to a local planning authority without an environmental statement",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-11",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "regulation/12",
      "kind": "regulation",
      "number": "12",
      "heading": "Application referred to the Welsh Ministers without an environmental statement",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-12",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "regulation/13",
      "kind": "regulation",
      "number": "13",
      "heading": "Appeal to the Welsh Ministers without an environmental statement",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-13",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "part/4",
      "kind": "part",
      "number": "4",
      "heading": "Preparation of Environmental Statements",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/14",
      "kind": "regulation",
      "number": "14",
      "heading": "Scoping opinions",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-14",
      "extent": "E+W",
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "regulation/15",
      "kind": "regulation",
      "number": "15",
      "heading": "Scoping directions",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-15",
      "extent": "E+W",
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "regulation/16",
      "kind": "regulation",
      "number": "16",
      "heading": "Procedure to facilitate preparation of environmental statements",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-16",
      "extent": "E+W",
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "part/5",
      "kind": "part",
      "number": "5",
      "heading": "Publicity and Procedures on Submission of Environmental Statements",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/17",
      "kind": "regulation",
      "number": "17",
      "heading": "Environmental statements",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-17",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "regulation/18",
      "kind": "regulation",
      "number": "18",
      "heading": "Procedure where an environmental statement is submitted to a local planning authority or specified person",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-18",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "regulation/19",
      "kind": "regulation",
      "number": "19",
      "heading": "Publicity where an environmental statement is submitted after the planning application or subsequent application",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-19",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "regulation/20",
      "kind": "regulation",
      "number": "20",
      "heading": "Provision of copies of environmental statements and further information for the Welsh Ministers on referral or appeal",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-20",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "regulation/21",
      "kind": "regulation",
      "number": "21",
      "heading": "Procedure where an environmental statement is submitted to the Welsh Ministers",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-21",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "regulation/22",
      "kind": "regulation",
      "number": "22",
      "heading": "Availability of copies of environmental statements",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-22",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "regulation/23",
      "kind": "regulation",
      "number": "23",
      "heading": "Charges for copies of environmental statements",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-23",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "regulation/24",
      "kind": "regulation",
      "number": "24",
      "heading": "Further information and evidence in respect of environmental statements",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-24",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "regulation/25",
      "kind": "regulation",
      "number": "25",
      "heading": "Consideration of whether planning permission , infrastructure consent or subsequent consent should be granted",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-25",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "part/6",
      "kind": "part",
      "number": "6",
      "heading": null,
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/26",
      "kind": "regulation",
      "number": "26",
      "heading": "Coordination of assessments",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-26",
      "extent": "E+W",
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "part/7",
      "kind": "part",
      "number": "7",
      "heading": "Availability of Directions etc. and Notification of Decisions",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/27",
      "kind": "regulation",
      "number": "27",
      "heading": "Availability of opinions, directions etc. for inspection",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-27",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "regulation/28",
      "kind": "regulation",
      "number": "28",
      "heading": "Information to accompany decisions",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-28",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "regulation/29",
      "kind": "regulation",
      "number": "29",
      "heading": "Duties to inform the public and the Welsh Ministers of final decisions",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-29",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "part/8",
      "kind": "part",
      "number": "8",
      "heading": "Applications for planning permission or infrastructure consent made to the Welsh Ministers",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/30",
      "kind": "regulation",
      "number": "30",
      "heading": "Application of Parts 2 to 7",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-30",
      "extent": "E+W",
      "status": null,
      "parent": "part/8"
    },
    {
      "path": "regulation/31",
      "kind": "regulation",
      "number": "31",
      "heading": "Requests for screening directions of the Welsh Ministers",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-31",
      "extent": "E+W",
      "status": null,
      "parent": "part/8"
    },
    {
      "path": "regulation/32",
      "kind": "regulation",
      "number": "32",
      "heading": "Applications made without an environmental statement",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-32",
      "extent": "E+W",
      "status": null,
      "parent": "part/8"
    },
    {
      "path": "regulation/33",
      "kind": "regulation",
      "number": "33",
      "heading": "Scoping directions",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-33",
      "extent": "E+W",
      "status": null,
      "parent": "part/8"
    },
    {
      "path": "regulation/34",
      "kind": "regulation",
      "number": "34",
      "heading": "Procedure to facilitate preparation of environmental statements",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-34",
      "extent": "E+W",
      "status": null,
      "parent": "part/8"
    },
    {
      "path": "regulation/35",
      "kind": "regulation",
      "number": "35",
      "heading": "Publicity where an environmental statement is submitted after the planning application or application for infrastructure consent",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-35",
      "extent": "E+W",
      "status": null,
      "parent": "part/8"
    },
    {
      "path": "regulation/36",
      "kind": "regulation",
      "number": "36",
      "heading": "Availability of copies of environmental statements",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-36",
      "extent": "E+W",
      "status": null,
      "parent": "part/8"
    },
    {
      "path": "regulation/37",
      "kind": "regulation",
      "number": "37",
      "heading": "Availability of directions etc. for inspection",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-37",
      "extent": "E+W",
      "status": null,
      "parent": "part/8"
    },
    {
      "path": "part/9",
      "kind": "part",
      "number": "9",
      "heading": "Restrictions of Grants of Permission",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/38",
      "kind": "regulation",
      "number": "38",
      "heading": "New simplified planning zone schemes or enterprise zone orders",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-38",
      "extent": "E+W",
      "status": null,
      "parent": "part/9"
    },
    {
      "path": "regulation/39",
      "kind": "regulation",
      "number": "39",
      "heading": "Local development orders",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-39",
      "extent": "E+W",
      "status": null,
      "parent": "part/9"
    },
    {
      "path": "regulation/40",
      "kind": "regulation",
      "number": "40",
      "heading": "Notices of unauthorised development, orders under section 90 of the 2024 Act, section 97 orders and section 102 orders",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-40",
      "extent": "E+W",
      "status": null,
      "parent": "part/9"
    },
    {
      "path": "regulation/41",
      "kind": "regulation",
      "number": "41",
      "heading": "Action under section 141 of the 1990 Act",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-41",
      "extent": "E+W",
      "status": null,
      "parent": "part/9"
    },
    {
      "path": "part/10",
      "kind": "part",
      "number": "10",
      "heading": "Unauthorised Development",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/42",
      "kind": "regulation",
      "number": "42",
      "heading": "Interpretation of this Part",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-42",
      "extent": "E+W",
      "status": null,
      "parent": "part/10"
    },
    {
      "path": "regulation/43",
      "kind": "regulation",
      "number": "43",
      "heading": "Duty to ensure objectives of the Directive are met",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-43",
      "extent": "E+W",
      "status": null,
      "parent": "part/10"
    },
    {
      "path": "regulation/44",
      "kind": "regulation",
      "number": "44",
      "heading": "Prohibition on the grant of planning permission for unauthorised EIA development",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-44",
      "extent": "E+W",
      "status": null,
      "parent": "part/10"
    },
    {
      "path": "regulation/45",
      "kind": "regulation",
      "number": "45",
      "heading": "Screening opinions",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-45",
      "extent": "E+W",
      "status": null,
      "parent": "part/10"
    },
    {
      "path": "regulation/46",
      "kind": "regulation",
      "number": "46",
      "heading": "Screening directions",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-46",
      "extent": "E+W",
      "status": null,
      "parent": "part/10"
    },
    {
      "path": "regulation/47",
      "kind": "regulation",
      "number": "47",
      "heading": "Provision of information",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-47",
      "extent": "E+W",
      "status": null,
      "parent": "part/10"
    },
    {
      "path": "regulation/48",
      "kind": "regulation",
      "number": "48",
      "heading": "Appeal to the Welsh Ministers without a screening opinion or screening direction",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-48",
      "extent": "E+W",
      "status": null,
      "parent": "part/10"
    },
    {
      "path": "regulation/49",
      "kind": "regulation",
      "number": "49",
      "heading": "Appeal to the Welsh Ministers without an environmental statement",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-49",
      "extent": "E+W",
      "status": null,
      "parent": "part/10"
    },
    {
      "path": "regulation/50",
      "kind": "regulation",
      "number": "50",
      "heading": "Procedure where an environmental statement is submitted to the Welsh Ministers",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-50",
      "extent": "E+W",
      "status": null,
      "parent": "part/10"
    },
    {
      "path": "regulation/51",
      "kind": "regulation",
      "number": "51",
      "heading": "Further information and evidence respecting environmental statements",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-51",
      "extent": "E+W",
      "status": null,
      "parent": "part/10"
    },
    {
      "path": "regulation/52",
      "kind": "regulation",
      "number": "52",
      "heading": "Publicity for environmental statements or further information",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-52",
      "extent": "E+W",
      "status": null,
      "parent": "part/10"
    },
    {
      "path": "regulation/53",
      "kind": "regulation",
      "number": "53",
      "heading": "Public inspection of documents",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-53",
      "extent": "E+W",
      "status": null,
      "parent": "part/10"
    },
    {
      "path": "regulation/54",
      "kind": "regulation",
      "number": "54",
      "heading": "Significant transboundary effects",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-54",
      "extent": "E+W",
      "status": null,
      "parent": "part/10"
    },
    {
      "path": "part/11",
      "kind": "part",
      "number": "11",
      "heading": "ROMP Applications",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/55",
      "kind": "regulation",
      "number": "55",
      "heading": "General application of the Regulations to ROMP applications",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-55",
      "extent": "E+W",
      "status": null,
      "parent": "part/11"
    },
    {
      "path": "part/12",
      "kind": "part",
      "number": "12",
      "heading": "Development with Significant Transboundary Effects",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/56",
      "kind": "regulation",
      "number": "56",
      "heading": "Development in Wales likely to have significant effects in an EEA State",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-56",
      "extent": "E+W",
      "status": null,
      "parent": "part/12"
    },
    {
      "path": "regulation/57",
      "kind": "regulation",
      "number": "57",
      "heading": "Projects in an EEA State likely to have significant transboundary effects",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-57",
      "extent": "E+W",
      "status": null,
      "parent": "part/12"
    },
    {
      "path": "part/13",
      "kind": "part",
      "number": "13",
      "heading": "Miscellaneous",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/58",
      "kind": "regulation",
      "number": "58",
      "heading": "Objectivity and bias",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-58",
      "extent": "E+W",
      "status": null,
      "parent": "part/13"
    },
    {
      "path": "regulation/59",
      "kind": "regulation",
      "number": "59",
      "heading": "Application to the High Court",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-59",
      "extent": "E+W",
      "status": null,
      "parent": "part/13"
    },
    {
      "path": "regulation/60",
      "kind": "regulation",
      "number": "60",
      "heading": "Hazardous waste and material change of use",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-60",
      "extent": "E+W",
      "status": null,
      "parent": "part/13"
    },
    {
      "path": "regulation/61",
      "kind": "regulation",
      "number": "61",
      "heading": "Extension of the period for an authority's decision on a planning application",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-61",
      "extent": "E+W",
      "status": null,
      "parent": "part/13"
    },
    {
      "path": "regulation/62",
      "kind": "regulation",
      "number": "62",
      "heading": "Extension of the power to provide in a development order for the giving of directions as respects the manner in which planning applications are dealt with",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-62",
      "extent": "E+W",
      "status": null,
      "parent": "part/13"
    },
    {
      "path": "regulation/63",
      "kind": "regulation",
      "number": "63",
      "heading": "Application to the Crown",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-63",
      "extent": "E+W",
      "status": null,
      "parent": "part/13"
    },
    {
      "path": "regulation/64",
      "kind": "regulation",
      "number": "64",
      "heading": "Amendment of other instruments",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-64",
      "extent": "E+W",
      "status": null,
      "parent": "part/13"
    },
    {
      "path": "regulation/65",
      "kind": "regulation",
      "number": "65",
      "heading": "Revocation, saving and transitional provisions",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-65",
      "extent": "E+W",
      "status": null,
      "parent": "part/13"
    },
    {
      "path": "regulation/66",
      "kind": "regulation",
      "number": "66",
      "heading": "Consequential amendments",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/regulation-66",
      "extent": "E+W",
      "status": null,
      "parent": "part/13"
    },
    {
      "path": "signature",
      "kind": "signature",
      "number": null,
      "heading": "Signature",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/signature",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/1",
      "kind": "schedule",
      "number": "1",
      "heading": "Descriptions of development for the purposes of the definition of “Schedule 1 development”",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/1/paragraph/wrapper1n1",
      "kind": "paragraph",
      "number": null,
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-wrapper1n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper2n1",
      "kind": "paragraph",
      "number": null,
      "heading": "Descriptions of development",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-wrapper2n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-3",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/4",
      "kind": "paragraph",
      "number": "4",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-4",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/5",
      "kind": "paragraph",
      "number": "5",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-5",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/6",
      "kind": "paragraph",
      "number": "6",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-6",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/7",
      "kind": "paragraph",
      "number": "7",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-7",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/8",
      "kind": "paragraph",
      "number": "8",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-8",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/9",
      "kind": "paragraph",
      "number": "9",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-9",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/10",
      "kind": "paragraph",
      "number": "10",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-10",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/11",
      "kind": "paragraph",
      "number": "11",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-11",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/12",
      "kind": "paragraph",
      "number": "12",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-12",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/13",
      "kind": "paragraph",
      "number": "13",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-13",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/14",
      "kind": "paragraph",
      "number": "14",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-14",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/15",
      "kind": "paragraph",
      "number": "15",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-15",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/16",
      "kind": "paragraph",
      "number": "16",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-16",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/17",
      "kind": "paragraph",
      "number": "17",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-17",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/18",
      "kind": "paragraph",
      "number": "18",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-18",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/19",
      "kind": "paragraph",
      "number": "19",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-19",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/20",
      "kind": "paragraph",
      "number": "20",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-20",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/21",
      "kind": "paragraph",
      "number": "21",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-21",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/22",
      "kind": "paragraph",
      "number": "22",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-22",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/23",
      "kind": "paragraph",
      "number": "23",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-1/paragraph-23",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/2",
      "kind": "schedule",
      "number": "2",
      "heading": "Descriptions of development and applicable thresholds and criteria for the purposes of the definition of “Schedule 2 development”",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/2/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-2/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-2/paragraph-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/3",
      "kind": "schedule",
      "number": "3",
      "heading": "Selection criteria for screening Schedule 2 development",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/3/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": "Characteristics of development",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-3/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/3"
    },
    {
      "path": "schedule/3/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": "Location of development",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-3/paragraph-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/3"
    },
    {
      "path": "schedule/3/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": "Types and characteristics of the potential impact",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-3/paragraph-3",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/3"
    },
    {
      "path": "schedule/4",
      "kind": "schedule",
      "number": "4",
      "heading": "Information for inclusion in environmental statements",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/4/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-4/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-4/paragraph-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-4/paragraph-3",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/paragraph/4",
      "kind": "paragraph",
      "number": "4",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-4/paragraph-4",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/paragraph/5",
      "kind": "paragraph",
      "number": "5",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-4/paragraph-5",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/paragraph/6",
      "kind": "paragraph",
      "number": "6",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-4/paragraph-6",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/paragraph/7",
      "kind": "paragraph",
      "number": "7",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-4/paragraph-7",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/paragraph/8",
      "kind": "paragraph",
      "number": "8",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-4/paragraph-8",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/paragraph/9",
      "kind": "paragraph",
      "number": "9",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-4/paragraph-9",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/paragraph/10",
      "kind": "paragraph",
      "number": "10",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-4/paragraph-10",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/5",
      "kind": "schedule",
      "number": "5",
      "heading": "Local Development Orders",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/5/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-5/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-5/paragraph-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-5/paragraph-3",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/paragraph/4",
      "kind": "paragraph",
      "number": "4",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-5/paragraph-4",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/paragraph/5",
      "kind": "paragraph",
      "number": "5",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-5/paragraph-5",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/paragraph/6",
      "kind": "paragraph",
      "number": "6",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-5/paragraph-6",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/paragraph/7",
      "kind": "paragraph",
      "number": "7",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-5/paragraph-7",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/paragraph/8",
      "kind": "paragraph",
      "number": "8",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-5/paragraph-8",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/paragraph/9",
      "kind": "paragraph",
      "number": "9",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-5/paragraph-9",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/paragraph/10",
      "kind": "paragraph",
      "number": "10",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-5/paragraph-10",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/paragraph/11",
      "kind": "paragraph",
      "number": "11",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-5/paragraph-11",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/paragraph/12",
      "kind": "paragraph",
      "number": "12",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-5/paragraph-12",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/paragraph/13",
      "kind": "paragraph",
      "number": "13",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-5/paragraph-13",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/paragraph/14",
      "kind": "paragraph",
      "number": "14",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-5/paragraph-14",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/paragraph/15",
      "kind": "paragraph",
      "number": "15",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-5/paragraph-15",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/paragraph/16",
      "kind": "paragraph",
      "number": "16",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-5/paragraph-16",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/paragraph/17",
      "kind": "paragraph",
      "number": "17",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-5/paragraph-17",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/6",
      "kind": "schedule",
      "number": "6",
      "heading": "Notices of unauthorised development, orders made under section 90 of the 2024 Act, and section 97 and 102 Orders under the 1990 Act",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/6/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-6/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/6"
    },
    {
      "path": "schedule/6/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-6/paragraph-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/6"
    },
    {
      "path": "schedule/6/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-6/paragraph-3",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/6"
    },
    {
      "path": "schedule/6/paragraph/4",
      "kind": "paragraph",
      "number": "4",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-6/paragraph-4",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/6"
    },
    {
      "path": "schedule/6/paragraph/5",
      "kind": "paragraph",
      "number": "5",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-6/paragraph-5",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/6"
    },
    {
      "path": "schedule/6/paragraph/6",
      "kind": "paragraph",
      "number": "6",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-6/paragraph-6",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/6"
    },
    {
      "path": "schedule/6/paragraph/7",
      "kind": "paragraph",
      "number": "7",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-6/paragraph-7",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/6"
    },
    {
      "path": "schedule/6/paragraph/8",
      "kind": "paragraph",
      "number": "8",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-6/paragraph-8",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/6"
    },
    {
      "path": "schedule/6/paragraph/9",
      "kind": "paragraph",
      "number": "9",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-6/paragraph-9",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/6"
    },
    {
      "path": "schedule/6/paragraph/10",
      "kind": "paragraph",
      "number": "10",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-6/paragraph-10",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/6"
    },
    {
      "path": "schedule/6/paragraph/11",
      "kind": "paragraph",
      "number": "11",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-6/paragraph-11",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/6"
    },
    {
      "path": "schedule/6/paragraph/12",
      "kind": "paragraph",
      "number": "12",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-6/paragraph-12",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/6"
    },
    {
      "path": "schedule/6/paragraph/13",
      "kind": "paragraph",
      "number": "13",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-6/paragraph-13",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/6"
    },
    {
      "path": "schedule/6/paragraph/14",
      "kind": "paragraph",
      "number": "14",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-6/paragraph-14",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/6"
    },
    {
      "path": "schedule/6/paragraph/15",
      "kind": "paragraph",
      "number": "15",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-6/paragraph-15",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/6"
    },
    {
      "path": "schedule/6/paragraph/16",
      "kind": "paragraph",
      "number": "16",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-6/paragraph-16",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/6"
    },
    {
      "path": "schedule/6/paragraph/17",
      "kind": "paragraph",
      "number": "17",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-6/paragraph-17",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/6"
    },
    {
      "path": "schedule/6/paragraph/18",
      "kind": "paragraph",
      "number": "18",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-6/paragraph-18",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/6"
    },
    {
      "path": "schedule/6/paragraph/19",
      "kind": "paragraph",
      "number": "19",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-6/paragraph-19",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/6"
    },
    {
      "path": "schedule/6/paragraph/20",
      "kind": "paragraph",
      "number": "20",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-6/paragraph-20",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/6"
    },
    {
      "path": "schedule/7",
      "kind": "schedule",
      "number": "7",
      "heading": "Functions under Section 141 of the 1990 Act",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/7/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-7/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/7"
    },
    {
      "path": "schedule/7/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-7/paragraph-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/7"
    },
    {
      "path": "schedule/7/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-7/paragraph-3",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/7"
    },
    {
      "path": "schedule/7/paragraph/4",
      "kind": "paragraph",
      "number": "4",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-7/paragraph-4",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/7"
    },
    {
      "path": "schedule/7/paragraph/5",
      "kind": "paragraph",
      "number": "5",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-7/paragraph-5",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/7"
    },
    {
      "path": "schedule/7/paragraph/6",
      "kind": "paragraph",
      "number": "6",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-7/paragraph-6",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/7"
    },
    {
      "path": "schedule/7/paragraph/7",
      "kind": "paragraph",
      "number": "7",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-7/paragraph-7",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/7"
    },
    {
      "path": "schedule/7/paragraph/8",
      "kind": "paragraph",
      "number": "8",
      "heading": null,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-7/paragraph-8",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/7"
    },
    {
      "path": "schedule/8",
      "kind": "schedule",
      "number": "8",
      "heading": "ROMP Applications",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/8/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": "Modification of provisions on prohibition of granting planning permission or subsequent consent",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-8/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/8"
    },
    {
      "path": "schedule/8/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": "Modification of provisions on application to local planning authority without an environmental statement",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-8/paragraph-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/8"
    },
    {
      "path": "schedule/8/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": "Disapplication of regulations and modifications of provisions on application referred to or appealed to the Welsh Ministers without an environmental statement",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-8/paragraph-3",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/8"
    },
    {
      "path": "schedule/8/paragraph/4",
      "kind": "paragraph",
      "number": "4",
      "heading": "Substitution of references to section 78 of the 1990 Act right of appeal and modification of provisions on appeal to the Welsh Ministers without an environmental statement",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-8/paragraph-4",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/8"
    },
    {
      "path": "schedule/8/paragraph/5",
      "kind": "paragraph",
      "number": "5",
      "heading": "Modification of provisions on preparation, publicity and procedures on submission of environmental statements",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-8/paragraph-5",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/8"
    },
    {
      "path": "schedule/8/paragraph/6",
      "kind": "paragraph",
      "number": "6",
      "heading": "Modification of provisions on application to the High Court and giving of directions",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-8/paragraph-6",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/8"
    },
    {
      "path": "schedule/8/paragraph/7",
      "kind": "paragraph",
      "number": "7",
      "heading": "Suspension of minerals development",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-8/paragraph-7",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/8"
    },
    {
      "path": "schedule/8/paragraph/8",
      "kind": "paragraph",
      "number": "8",
      "heading": "Determination of conditions and right of appeal on non-determination",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-8/paragraph-8",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/8"
    },
    {
      "path": "schedule/8/paragraph/9",
      "kind": "paragraph",
      "number": "9",
      "heading": "ROMP application by a mineral planning authority",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-8/paragraph-9",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/8"
    },
    {
      "path": "schedule/8/paragraph/10",
      "kind": "paragraph",
      "number": "10",
      "heading": "ROMP applications: duty to make a prohibition order after two years suspension of permission",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-8/paragraph-10",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/8"
    },
    {
      "path": "schedule/9",
      "kind": "schedule",
      "number": "9",
      "heading": "Amendments to other instruments",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/9/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": "The Town and Country Planning (Development Management Procedure) (Wales) Order 2012",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-9/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/9"
    },
    {
      "path": "schedule/9/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": "Developments of National Significance (Procedure) (Wales) Order 2016",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-9/paragraph-2",
      "extent": "E+W",
      "status": "repealed",
      "parent": "schedule/9"
    },
    {
      "path": "schedule/10",
      "kind": "schedule",
      "number": "10",
      "heading": "Consequential amendments",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/10/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": "The Town and Country Planning (General Permitted Development) Order 1995",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-10/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10"
    },
    {
      "path": "schedule/10/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": "The Public Gas Transporter Pipe-line Works (Environmental Impact Assessment) Regulations 1999",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-10/paragraph-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10"
    },
    {
      "path": "schedule/10/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": "The Planning (National Security Directions and Appointed Representatives) (Wales) Regulations 2006",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/schedule-10/paragraph-3",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/10"
    },
    {
      "path": "note",
      "kind": "note",
      "number": null,
      "heading": "Explanatory note",
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/note",
      "extent": "E+W",
      "status": null,
      "parent": null
    }
  ],
  "has_text": true,
  "pdfs": [
    {
      "title": "Printed copy",
      "main": true,
      "language": "Mixed",
      "date": "2017-07-04",
      "size": 8362061,
      "url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/pdf/wsi_20170567_mi.pdf",
      "source_url": "https://www.legislation.gov.uk/wsi/2017/567/pdfs/wsi_20170567_mi.pdf"
    }
  ],
  "outstanding_effects": [],
  "made_under": [],
  "changes_made_to": 370,
  "changes_made_to_url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/changes.json",
  "changes_made_by": 251,
  "changes_made_by_url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/changes/by-it.json",
  "instruments_made_under": 0,
  "instruments_made_under_url": "https://openlegislation.uk/town-and-country-planning-environmental-impact-assessment-wales-regulations-2017/instruments.json",
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/wsi/2017/567",
    "retrieved_at": "2026-10-28T23:26:34.803004+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}