# The Town and Country Planning (Fees for Applications and Deemed Applications) (Scotland) Amendment Regulations 1990, Schedule


“
TABLE
1
2
(Category of development)
(Fee payable)
I. Operations
1 The erection of dwellinghouses (other than development within category 5).
Where the application is for–(a) outline planning permission, £77 for each 0.1 hectare of the site area, subject to a maximum of £1,925; or for one dwellinghouse, £77;
(b) Other than outline planning permission, £77 for each dwellinghouse to be created by the development, subject to a maximum of £3,850.
2 The erection of buildings (other than buildings coming within category 1, 3 or 5).
Where the application is for–(a) outline planning permission, £77 for each 0.1 hectare of the site area, subject to a maximum of £1,925;
(b) other than outline planning permission–
(i) where no floor space is to be created by the development, £39;
(ii) where the area of gross floor space to be created by the development does not exceed 40 square metres, £39;
(iii) where the area of gross floor space to be created by the development exceeds 40 square metres but does not exceed 75 square metres, £77; and
(iv) where the area of gross floor space to be created by the development exceeds 75 square metres, £77 for each 75 square metres, subject to a maximum of £3,850.
3 The erection on land used for the purposes of agriculture, of those buildings excluded by virtue of subparagraph (c) in paragraph (1) of class V in Schedule 1 to the General Development Order from that class.
(a) Where the application is for outline planning permission, £77 for each 0.1 hectare of the site area, subject to a maximum of £1,925
(b) In all other cases
(i) where the area of gross floor space to be created by the development does not exceed 465 square metres, nil;
(ii) where the area of gross floor space to be created by the development exceeds 465 square metres but does not exceed 540 square metres, £77;
(iii) where the area of gross floor space to be created by the development exceeds 540 square metres, £77 for the first 540 square metres and £77 for each 75 square metres in excess of that figure subject to maximum of £3,850.
4 The erection, alteration or replacement of plant or machinery.
£77 for each 0.1 hectare of the site area, subject to a maximum of £3,850.
5 The enlargement, improvement or other alteration of existing dwellinghouses.
(a) Where the application relates to one dwellinghouse, £39;
(b) where the application relates to 2 or more dwellinghouses, £77.
6 (a) The carrying out of operations, including the erection of a building, within the curtilage of an existing dwellinghouse, for purposes ancillary to the enjoyment of the dwellinghouse as such;
(b) the erection or construction of gates, fences, walls or other means of enclosure along a boundary of the curtilage of an existing dwellinghouse; or
(c) the construction of car parks, service roads and other means of access on land used for the purposes of a single undertaking, where the development is required for a purpose incidental to the existing use of the land.
£39
7 The carrying out of any operations connected with exploratory drilling for oil or natural gas.
£77 for each 0.1 hectare of the site area, subject to a maximum of £5,775.
8 The carrying out of any operations not within categories 1 to 7.
In the case of operations for–(a) the winning and working of minerals, £39 for each 0.1 hectare of the site area, subject to a maximum of £5,850;
(b) the winning and working of peat, £39 for each hectare of the site area, subject to a maximum of £585;
(c) any other purpose, £39 for each 0.1 hectare of the site area, subject to a maximum of £390.
II. Uses of Land
9 The change of use of a building to use as one or more separate dwellinghouses.
£77 for each additional dwellinghouse to be created by the development, subject to a maximum of £3,850.
10 (a) The use of land for the disposal of refuse or waste materials or for the deposit of material remaining after minerals have been extracted from land; or
(b) the use of land for the storage of minerals in the open.
£39 for each 0.1 hectare of the site area, subject to a maximum of £5,850.
11 The making of a material change in the use of a building or land, other than a material change of use within category 9 or 10.
£77.
12 The continuance of a use of land, or the retention of buildings or works on land, without compliance with a condition subject to which a previous planning permission has been granted, including a condition requiring the discontinuance of the use or the removal of the building or works at the end of a specified period.
£39.
”

---
Source: https://www.legislation.gov.uk/uksi/1990/2474/schedule (the official version)
Page: https://openlegislation.uk/town-and-country-planning-fees-for-applications-and-deemed-applications-scotland-amendment-regulations-1990/schedule
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.