Schedule
“
TABLE
1 2 (Category of development) (Fee payable) I. Operations 1The erection of dwellinghouses (other than development within category 5).
Where the application is for–
- (a)
outline planning permission, £92 for each 0.1 hectare of the site area, subject to a maximum of £2,300; or for one dwellinghouse £92;
- (b)
Other than outline planning permission, £92 for each dwellinghouse to be created by the development, subject to a maximum of £4,600.
2The erection of buildings (other than buildings coming within category 1, 3 or 5).
Where the application is for–
- (a)
outline planning permission, £92 for each 0.1 hectare of the site area, subject to a maximum of £2,300;
- (b)
other than outline planning permission–
- (i)
where no floor space is to be created by the development, £46;
- (ii)
where the area of gross floor space to be created by the development does not exceed 40 square metres, £46;
- (iii)
where the area of gross floor space to be created by the development exceeds 40 square metres but does not exceed 75 square metres, £92; and
- (iv)
where the area of gross floor space to be created by the development exceeds 75 square metres, £92 for each 75 square metres, subject to a maximum of £4,600.
3The erection on land used for the purposes of agriculture, of those buildings excluded by virtue of sub-paragraph (c) in paragraph (1) of class V in Schedule 1 to the General Development Order from that class.
(a)Where the application is for outline planning permission, £92 for each 0.1 hectare of the site area, subject to a maximum of £2,300;
(b)In all other cases–
(i)where the area of gross floor space to be created by the development does not exceed 465 square metres, nil;
(ii)where the area of gross floor space to b e created by the development exceeds 465 square metres but does not exceed 540 square metres, £92;
(iii)where the area of gross floor space to be created by the development exceeds 540 square metres, £92 for the first 540 square metres and £92 for each 75 square metres in excess of that figure subject to a maximum of £4,600.
4The erection, alteration or replacement of plant or machinery.
£92 for each 0.1 hectare of the site area, subject to a maximum of £4,600. 5The enlargement, improvement or other alteration of existing dwellinghouses.
(a)Where the application relates to one dwellinghouse, £46;
(b)where the application relates to 2 or more dwellinghouses, £92.
6(a)The carrying out of operations, including the erection of a building, within the curtilage of an existing dwellinghouse, for purposes ancillary to the enjoyment of the dwellinghouse as such;
(b)the erection or construction of gates, fences, walls or other means of enclosure along a boundary of the curtilage of an existing dwellinghouse; or
(c)the construction of car parks, service roads and other means of access on land used for the purposes of a single undertaking, where the development is required for a purpose incidental to the existing use of the land.
£46 7The carrying out of any operations connected with exploratory drilling for oil or natural gas.
£92 for each 0.1 hectare of the site area, subject to a maximum of £6,900. 8The carrying out of any operations not within categories 1 to 7.
In the case of operations for–
- (a)
the winning and working of minerals, £46 for each 0.1 hectare of the site area, subject to a maximum of £6,900;
- (b)
the winning and working of peat, £46 for each hectare of the site area, subject to a maximum of £690;
- (c)
any other purpose, £46 for each 0.1 hectare of the site area, subject to a maximum of £460.
II. Uses of Land 9The change of use of a building to use as one or more separate dwellinghouses.
£92 for each additional dwellinghouse to be created by the development, subject to a maximum of £4,600. 10(a)The use of land for the disposal of refuse or waste materials or for the deposit of material remaining after minerals have been extracted from land: or
(b)the use of land for the storage of minerals in the open.
£46 for each 0.1 hectare of the site area, subject to a maximum of £6,900. 11The making of a material change in the use of a building or land, other than a material change of use within category 9 or 10.
£92 12The continuance of a use of land, or the retention of buildings or works on land, without compliance with a condition subject to which a previous planning permission has been granted, including a condition requiring the discontinuance of the use or the removal of the building or works at the end of a specified period.
£46. ”