Paragraph C.1 Development not permitted

Changes not yet applied. Later legislation changes this provision in ways not yet written into the text below:

Development is not permitted by Class C if—

(a)

the area of the site within which the operations would be carried out exceeds 2 hectares;

(b)

any part of the operation would be carried out within 25 metres of the metalled portion of a trunk or classified road;

(c)

in a case where the operations would involve the winning or workings of minerals—

(i)

any excavation would exceed a depth of 2.5 metres; or

(ii)

the area of any excavation, taken together with any other excavations carried out on the land within the preceding two years, would exceed 0.2 hectares.