# The Town and Country Planning (General Permitted Development) (Amendment) (Wales) Order 2019, Article 3: Minor operations: recharging electric vehicles


In Part 2 (minor operations) after Class C insert—
“Class D
Permitted development
D. The installation, alteration or replacement within an area lawfully used for off-street parking, of an electrical outlet mounted on a wall for recharging electric vehicles.
Development not permitted
D.1 Development is not permitted by Class D if the outlet and its casing would—
(a) exceed 0.2 cubic metres;
(b) face onto and be within two metres of a highway; or
(c) be within a site designated as a scheduled monument.
Class E
Permitted development
E. The installation, alteration or replacement within an area lawfully used for off-street parking, of an upstand with an electrical outlet mounted on it for recharging electric vehicles.
Development not permitted
E.1 Development is not permitted by Class E if the upstand and the outlet would—
(a) exceed 1.6 metres in height from the level of the surface used for the parking of vehicles;
(b) be within two metres of a highway;
(c) be within a site designated as a scheduled monument; or
(d) result in more than one upstand being provided for each parking space.”

---
Source: https://www.legislation.gov.uk/wsi/2019/330/article/3 (the official version)
Page: https://openlegislation.uk/town-and-country-planning-general-permitted-development-amendment-wales-order-2019/article-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

