{
  "url": "https://openlegislation.uk/town-and-country-planning-general-permitted-development-order-1995/schedule-2/part-17A/Class/A/paragraph-A",
  "json_url": "https://openlegislation.uk/town-and-country-planning-general-permitted-development-order-1995/schedule-2/part-17A/Class/A/paragraph-A.json",
  "legislation": "uksi/1995/418",
  "legislation_title": "The Town and Country Planning (General Permitted Development) Order 1995",
  "legislation_url": "https://openlegislation.uk/town-and-country-planning-general-permitted-development-order-1995",
  "path": "schedule/2/part/17A/Class/A/paragraph/A",
  "kind": "paragraph",
  "number": "A",
  "heading": "Permitted Development",
  "text": "Development by statutory undertakers for the generation, transmission or supply of electricity for the purposes of their statutory undertaking consisting of—\n(a) the installation of a devolved associated line with a nominal voltage not exceeding 20 kilovolts used or intended to be used for supplying a single consumer;\n(b) the installation of so much of a devolved associated line as is or will be within premises in the occupation or control of the person responsible for its installation;\n(c) the installation of a devolved associated line which—\n(i) connects an electric line installed below ground with apparatus mounted on a pole or structure; and\n(ii) is attached to the pole or structure throughout its length except where it passes through a fuse or other apparatus;\n(d) the installation for a period not exceeding six months of a devolved associated line which connects two points on an existing line which are no further apart than the maximum distance so as to provide a diversion for the existing line;\n(e) the installation of a devolved associated line attached to a building where the building in question crosses a road, railway or watercourse and its principal purpose is not the support of the line;\n(f) the installation of a devolved associated line which replaces an existing line whether or not it is installed in the same position as the existing line in question;\n(g) the installation of one or more additional poles to support an existing devolved associated line;\n(h) the installation of a devolved associated line which has been, or is to be, installed in accordance with a power conferred by, or by an order made under, an Act of Parliament or an Act of the National Assembly for Wales.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Order revoked (E.) (15.4.2015) by The Town and Country Planning (General Permitted Development) (England) Order 2015 (S.I. 2015/596), art. 1(1), Sch. 4 para. 1 (with arts. 1(2), 8(2)(3))"
    },
    {
      "type": "F",
      "label": "F2",
      "text": "Sch. 2 Pt. 17A inserted (W.) (1.4.2019) by The Town and Country Planning (General Permitted Development) (Amendment) (Wales) Order 2019 (S.I. 2019/330), art. 1(2), Sch. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/1995/418/schedule/2/part/17A/Class/A/paragraph/A",
    "retrieved_at": "2026-10-29T13:15:58.850730+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}