# The Town and Country Planning (Major Infrastructure Project Inquiries Procedure) (England) Rules 2005, Article 2: Interpretation


(1) In these Rules—
“additional inspector” means an inspector appointed by the Secretary of State under section 76B(3)(a) of the Planning Act;
“assessor” means a person appointed by the Secretary of State to sit with an inspector at an inquiry or re-opened inquiry to advise the inspector on such matters arising as the Secretary of State may specify;
“by local advertisement”, in relation to a notice, means—
(a) by publication of the notice in at least one newspaper circulating in the locality in which the land to which the application relates is situated; and
(b) where the local planning authority maintain a website for the purpose of advertisement of applications, by publication of the notice on the website;
“the Commission” means the Historic Buildings and Monuments Commission for England;
“development order” has the meaning given in section 59 of the Planning Act;
“document” includes a photograph, map or plan;
“electronic communication” has the same meaning as in section 15(1) of the Electronic Communications Act 2000;
“environmental statement” has the same meaning as in regulation 2 of the Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations 1999;
“inquiry” means an inquiry in relation to which these Rules apply; and where an inquiry is conducted by means of concurrent sessions, it includes any such session;
“inspector” includes a lead inspector and an additional inspector;
“land” means the land or building to which an inquiry relates;
“lead inspector” means a person appointed by the Secretary of State under section 76A(4)(b) of the Planning Act;
“the Listed Buildings Act” means the Planning (Listed Buildings and Conservation Areas) Act 1990;
“listed building consent” has the meaning given in section 8(7) of the Listed Buildings Act;
“local planning authority” means, in relation to a referred application, the body which would otherwise have dealt with the application;
“major participant” means a person who has indicated in accordance with rule 6(2)(d) that he is likely to want to be represented formally and to play a major part in the inquiry;
“mediator” means a person who is appointed by the Secretary of State to undertake a mediation under rule 8;
“outline statement” means a written statement of the principal submissions which a person proposes to put forward at an inquiry;
“the Planning Act” means the Town and Country Planning Act 1990;
“pre-inquiry meeting” means a meeting held before an inquiry to consider what may be done with a view to securing that the inquiry is conducted efficiently and expeditiously, and where two or more such meetings are held about the same inquiry, references to the conclusion of a pre-inquiry meeting are references to the conclusion of the final meeting;
“referred application” means an application which is referred to the Secretary of State for determination;
“registration form” means a form for completion by persons who wish to participate in the inquiry;
“relevant notice” means the Secretary of State’s notice under rule 4;
“statement of case” means, and comprises, a written statement which contains—
(a) full particulars of the case which a person proposes to put forward at an inquiry;
(b) a list of any documents which that person intends to refer to or put in evidence;
(c) a list of the individuals whom that person proposes to call as witnesses; and
(d) the subject-matter of the evidence of each such witness;
“statement of common ground” means a written statement prepared jointly by the local planning authority and the applicant, which contains agreed factual information about the proposal which is the subject of the application;
“statutory party”, in relation to a referred application to which these Rules apply, means—
(a) a person mentioned in paragraph (1)(b)(i) of article 19 of the Town and Country Planning (General Development Procedure) Order 1995 whose representations the Secretary of State is required by paragraph (3) of that article to take into account in determining the application; and
(b) a person whose representations the Secretary of State is required by paragraphs (3)(b) and (5) of regulation 6 of the Planning (Listed Buildings and Conservation Areas) Regulations 1990 to take into account in determining the application,
“technical adviser” means a person appointed by the Secretary of State under rule 7.
(2) Subject to paragraph (4), a requirement imposed on the Secretary of State or the inspector to circulate a document is met by sending a copy of that document to—
(a) the local planning authority;
(b) the applicant; and
(c) each major participant.
(3) Subject to paragraph (4), a requirement imposed on the Secretary of State or the inspector to deposit a document is met by sending a copy of it to the local planning authority.
(4) Nothing in paragraphs (2) or (3) requires the Secretary of State or the inspector to send a copy of a document to the person from whom it was received.

---
Source: https://www.legislation.gov.uk/uksi/2005/2115/article/2 (the official version)
Page: https://openlegislation.uk/town-and-country-planning-major-infrastructure-project-inquiries-procedure-england-rules-2005/article-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

